Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
0CAN021405, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)27 February 2014Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)FLEX
0CAN021406, Units 1 and 2, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)27 February 2014Units 1 and 2, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)
0CAN021502, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)24 February 2015Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)Boric Acid
Shutdown Margin
Finite Element Analysis
FLEX
Tornado Generated Missile
0CAN021503, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)24 February 2015Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)Boric Acid
Time to boil
FLEX
Spent Fuel Pool Instrumentation
0CAN062301, Status of Actions to Return to Compliance26 June 2023Status of Actions to Return to ComplianceNon-Destructive Examination
0CAN081402, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)28 August 2014Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)Safe Shutdown
Boric Acid
Shutdown Margin
Finite Element Analysis
FLEX
Tornado Generated Missile
0CAN081503, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) (Order EA-12-049)28 August 2015Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) (Order EA-12-049)Boric Acid
Tornado Missile
FLEX
2CAN081504, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)28 August 2015Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)Boric Acid
FLEX
Spent Fuel Pool Instrumentation
CNRO-2005-00022, Entergy Operations, Inc., Status of Decommissioning Funding Report31 March 2005Entergy Operations, Inc., Status of Decommissioning Funding Report
CNRO-2005-00028, Entergy Operations, Inc., Status of Decommissioning Funding Report Refilling5 May 2005Entergy Operations, Inc., Status of Decommissioning Funding Report Refilling
CNRO-2007-00018, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc. for Year Ending December 31, 2006 - 10 CFR 50.75(f)(1)29 March 2007Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc. for Year Ending December 31, 2006 - 10 CFR 50.75(f)(1)
CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc31 March 2011Status of Decommissioning Funding for Plants Operated by Entergy Operations, IncDecommissioning Funding Plan
CNRO-2012-00007, Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc15 October 2012Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, IncIncorporated by reference
Decommissioning Funding Plan
CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc29 March 2013Decommissioning Funding Status Report - Entergy Operations, IncDecommissioning Funding Plan
CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report31 March 2017Entergy Operations, Inc. - Decommissioning Funding Status ReportDecommissioning Funding Plan
CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report28 March 2019Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status ReportDecommissioning Funding Plan
IR 05000269/20200063 March 2021Annual Assessment Letter for Oconee Nuclear Station Units 1, 2, & 3 NRC Inspection Report 05000269/2020006, 05000270/2020006, & 05000287/2020006Fitness for Duty
Operator Manual Action
Open Phase Condition
License Renewal
Exemption Request
Power-Operated Valves
COVID-19
IR 05000313/20170061 March 2018Annual Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2017006 and 05000368/2017006)Cyber Security
Open Phase Condition
License Renewal
L-09-335, Request for Extension of Enforcement Discretion for Noncompliances Related to Fire Protection Programs14 January 2010Request for Extension of Enforcement Discretion for Noncompliances Related to Fire Protection ProgramsSafe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Fire Protection Program
L-11-102, Submittal of the Decommissioning Reports29 March 2011Submittal of the Decommissioning Reports
L-13-243, Firstenergy Nuclear Operating Company'S, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No26 August 2013Firstenergy Nuclear Operating Company'S, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order NoFLEX
L-13-244, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)26 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)Spent Fuel Pool Instrumentation
L-14-024, Firstenergy Nuclear Operating Company'S (Fenoc'S) Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 February 2014Firstenergy Nuclear Operating Company'S (Fenoc'S) Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
L-14-025, Firstenergy Nuclear Operating Company'S Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA27 February 2014Firstenergy Nuclear Operating Company'S Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EABoric Acid
FLEX
L-14-088, Submittal of Decommissioning Funding Status Report28 March 2014Submittal of Decommissioning Funding Status Report
L-14-257, Davis-Bes, Perry, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Reqard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events28 August 2014Davis-Bes, Perry, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Reqard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsFLEX
L-15-001, Firstenergy Nuclear Operating Company'S (Fenoc'S) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool.26 February 2015Firstenergy Nuclear Operating Company'S (Fenoc'S) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool.Spent Fuel Pool Instrumentation
L-15-002, Firstenergy Nuclear Operating Company'S (Fenoc'S) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies26 February 2015Firstenergy Nuclear Operating Company'S (Fenoc'S) Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation StrategiesBoric Acid
Shutdown Margin
Ultimate heat sink
Tornado Missile
FLEX
L-15-218, Firstenergy Nuclear Operating Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)18 August 2015Firstenergy Nuclear Operating Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)Spent Fuel Pool Instrumentation
L-15-219, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External.27 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External.Boric Acid
FLEX
L-16-003, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)9 February 2016Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)Spent Fuel Pool Instrumentation
L-17-028, Submittal of the Decommissioning Funding Status Reports24 March 2017Submittal of the Decommissioning Funding Status Reports
L-21-046, Submittal of the Decommissioning Funding Status Reports for Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant29 March 2021Submittal of the Decommissioning Funding Status Reports for Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant
L-23-061, Submittal of the Decommissioning Funding Status Reports31 March 2023Submittal of the Decommissioning Funding Status ReportsDecommissioning Funding Plan
ML02240078118 January 2002E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report
ML02240078724 January 2002E-Mail from John Harrison to Jacob Zimmerman Re Vhp Nozzle Status Report Update
ML02240079224 January 2002E-Mail from Allen Hiser to NRR Re Vhp Nozzle Status Report Update
ML02240079525 January 2002E-Mail from Jacob Zimmerman to NRR Re Bulletin 2001-01 Status Report
ML0224007981 February 2002E-mail from Beth Wetzel Bulletin 2001-01 Status Report
ML02240084211 April 2002Advisory Committee on Reactor Safeguards 491st Meeting CRDM Penetration Cracking & RPV Head Degradation Room T-2B3, 11545 Rockville Pike, Rockville, MD, 04/11/2002 - Status ReportBoric Acid
ML02246015329 August 2002Undated Document, Current Status of High Susceptibility Plants That May Receive OrdersBoric Acid
Finite Element Analysis
ML02260029217 September 2002Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR
ML02270033427 September 2002Status of NRC Staff Review of Fenoc'S Bulletin 2001-01 Response for Davis-Besse with Handwritten Notes
ML02305018917 October 2002Attachment 16, ANO-1, 1R17 Steam Generator Status Report
ML02343054331 December 2002Reactor Vessel Head Damage, NRC Update, December 2002Boric Acid
Pressure Boundary Leakage
ML03059018428 February 2003Attachment 5, Status of Implementation of Davis-Besse Lessons Learned Task Force Report RecommendationsBoric Acid
Generic Issues Program
ML0327906767 October 2003October 2003 Davis-Besse Monthly Status ReportBoric Acid
ML03323005218 November 2003November 2003 Davis-Besse Monthly Status ReportBoric Acid
ML0333610683 December 2003December 2003 Davis-Besse Monthly Status ReportBoric Acid
ML04006010813 January 2004December 2003 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206