Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18040B298 | 15 August 2018 | Resolution of Comments on Draft Safety Evaluation for Topical Report BAW-10247P-A, Supplement 2P, Revision 0, Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors, Supplement 2: Mechanical Methods. | |
ML18128A242 | 10 May 2018 | Final Safety Evaluation for Topical Report ANP-10337P, Revision 0, PWR Fuel Assembly Structural Response to Externally Applied Dynamic Excitations (Non-Proprietary Version) | Unanalyzed Condition Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Earthquake Fuel cladding |
ML18128A276 | 10 May 2018 | Transmittal of Final Safety Evaluation for Topical Report ANP-10337P, Revision 0, PWR Fuel Assembly Structural Response to Externally Applied Dynamic Excitations (Non-Proprietary Version) | |
ML18129A025 | 23 May 2018 | Resolutions of Comments on Draft Safety Evaluation for ANP-10340P, Revision 0 | |
ML18144A951 | 23 May 2018 | Final Safety Evaluation for Topical Report ANP-10340P, Revision 0, Incorporation of Chromia-Doped Fuel Properties in Areva Approved Methods (Non-Proprietary Version) | Anticipated operational occurrence Feedwater Controller Failure Fuel cladding |
ML18149A567 | 25 May 2018 | Final Safety Evaluation for ANP-10335P, Revision 0, Ace/Atrium 11 Critical Power Correlation (Non-Proprietary Version) | Anticipated operational occurrence |
ML18149A590 | 25 May 2018 | Resolution of Comments on Draft Safety Evaluation for Topical Report ANP-10335P, Revision 0, Ace/Atrium 11 Critical Power Correlation (Non-Proprietary Version) | |
ML18179A127 | 17 July 2018 | Request for Withholding Information from Public Disclosure in April 23, 2018, Response for Comment on Draft Safety Evaluation for ANP-10335P, Revision 0 | |
ML18205A683 | 3 August 2018 | Final Safety Evaluation for Topical Report ANP-10297P-A, Revision 0, Supplement 1, the Arcadia Reactor Analysis System for PWRs Methodology Description and Benchmarking Results (Non-Proprietary Version) | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML18232A204 | 15 August 2018 | Final Safety Evaluation for Topical Report BAW-10247P-A, Supplement 2P, Revision 0, Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors, Supplement 2: Mechanical Methods. | Anticipated operational occurrence |
ML18236A426 | 24 September 2018 | Final Safety Evaluation for Framatome Inc. Topical Report ANP-10341P, the ORFEO-GAIA and ORFEO-NMGRID Critical Heat Flux Correlations (Non-Proprietary) | |
ML19052A572 | 26 March 2019 | Final Safety Evaluation for Framatome, Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Non-Proprietary Version) | Boric Acid Reactor Vessel Water Level Anticipated operational occurrence Fuel cladding |
ML19057A555 | 26 March 2019 | Transmittal of Final Safety Evaluation for Framatome Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios. | |
ML19071A295 | 26 March 2019 | Resolution of Comments on Draft Safety Evaluation for Topical Report ANP-10332P, Revision 0 | |
ML19101A419 | 23 April 2019 | Transmittal of Draft Safety Evaluation for Topical Report EMF-93-177, Revision 1, Supplement 2P, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material. | |
ML19141A186 | 3 June 2019 | Final Safety Evaluation for Framatome Inc., Topical Report BAW-10227, Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel | Anticipated operational occurrence |
ML19141A368 | 3 June 2019 | Resolution of Framatome Comments on Draft Safety Evaluation for Topical Report BAW-10227,Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel | |
ML19149A486 | 24 June 2019 | Final Safety Evaluation for Topical Report EMF-93-177, Revision 1, Supplement 2P, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material | Anticipated operational occurrence Safe Shutdown Earthquake |
ML19149A488 | 24 June 2019 | Resolution of Comments Made on Draft Safety Evaluation for Topical Report EMF-93-177, Revision 1, Supplement 2P, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material | |
ML19204A051 | 24 September 2019 | Final Safety Evaluation for Topical Report ANP-10342P, Revision 0, Gaia Fuel Assembly Mechanical Design | Safe Shutdown Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Earthquake Fuel cladding |
ML19204A059 | 24 September 2019 | Transmittal of Final Safety Evaluation for Topical Report ANP-10342P, Revision 0, Gaia Fuel Assembly Mechanical Design | |
ML19276E475 | 30 October 2019 | Final Safety Evaluation for Framatome Inc. Topical Report ANP-10346, Revision 0, ATWS-I Analysis Methodology for BWRs Using RAMONA5-FA (Non-Prop Version) | Anticipated operational occurrence Coast down |