ML19149A488
| ML19149A488 | |
| Person / Time | |
|---|---|
| Site: | PROJ0728, 99902041 |
| Issue date: | 06/24/2019 |
| From: | Jeremy Dean NRC/NRR/DSS/SNPB |
| To: | Peters G Framatome |
| Rowley J, NRR/DLP, 415-4053 | |
| Shared Package | |
| ML19149A479 -Pkg. | List: |
| References | |
| EPID L-2018-TOP-0029 EMF-93-177 | |
| Download: ML19149A488 (2) | |
Text
RESOLUTION OF COMMENTS BY THE OFFICE OF NUCLEAR REACTOR REGULATION ON DRAFT SAFETY EVALUATION FOR TOPICAL REPORT EMF-93-177, REVISION 1, SUPPLEMENT 2P, REVISION 1, MECHANICAL DESIGN FOR BWR FUEL CHANNELS: Z4B MATERIAL FRAMATOME, INC.
DOCKET NO. 99902041 This attachment provides the U.S. Nuclear Regulatory Commission (NRC) staffs review and disposition of the comments made by Framatome Inc. (Framatome) on the draft safety evaluation (SE) for Topical Report (TR) EMF-93-177, Revision 1, Supplement 2P, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material. Framatome provided the comments by letter dated May 20, 2019 (Agencywide Documents Access and Management System Accession No. ML19142A094).
NRC Resolution of Proposed Page Line Proposed Change/Comment Change/Comment 1 31 Reference 3 should either be changed to The final SE was modified to Reference 1, or a new Reference added indicated Reference 1 as the for the topical report under review: correct source.
EMF-93-177 Revision 1, Supplement 2P, Revision 1 1 39 Reference 3 should either be changed to The final SE was modified to Reference 1, or a new Reference added indicated Reference 1 as the for the topical report under review: correct source.
EMF-93-177 Revision 1, Supplement 2P, Revision 1 3 22 Reference 3 should be Reference 4 The NRC staff agrees with this editorial suggestion. The final SE was modified accordingly.
3 33 Change ASTM 8352/8352M to ASTM The NRC staff agrees with this B352/B352M editorial suggestion. The final SE was modified accordingly.
3 43-44 Move the sentence that starts with The The NRC staff agrees with the BQ process to the end of the previous proposed change. The final SE paragraph and change The BQ process was modified accordingly.
also result in to Z4B also has 7 43 Change Framatomess to Framatomes The NRC staff agrees with this editorial suggestion. The final SE was modified accordingly.
Attachment
8 10 Change Ref. 3 to Ref. 4 The NRC staff agrees with this editorial suggestion. The final SE was modified accordingly.
10 46 Change Supplemt to Supplement The NRC staff agrees with this editorial suggestion. The final SE was modified accordingly.