MONTHYEARML18355A9802019-01-15015 January 2019 Regulatory Audit Plan for January 30-31, 2019, Audit for Framatome Inc. Topical Report BAW-10227, Revision 1, Supplement 1P,Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel Project stage: Other ML18355A9772019-01-15015 January 2019 Audit Plan for January 30-31, 2019, Audit Supporting Review of Framatome Inc. Topical Report BAW-10227, Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel Project stage: Request ML19043A8682019-04-0808 April 2019 Audit Report for the January 30 - 31, 2019, Audit in Support of the Review of Topical Report BAW-10227P, Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in Pressurized Water Reactor Reactor Fuel Project stage: Approval ML19043A8422019-04-0808 April 2019 Audit Report for the January 30 - 31, 2019, Audit in Support of the Review of Topical Report BAW-10227P, Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in Pressurized Water Reactor Reactor Fuel (Non- Project stage: Approval ML19043A8312019-04-0808 April 2019 Audit Report for the January 30 - 31, 2019, Audit in Support of the Review of Topical Report BAW-10227P, Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel Project stage: Request ML19141A3682019-06-0303 June 2019 Resolution of Framatome Comments on Draft Safety Evaluation for Topical Report BAW-10227,Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel Project stage: Draft Approval ML19141A1912019-06-0303 June 2019 Transmittal of Final Safety Evaluation for Framatome Inc. Topical Report BAW-10227, Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel Project stage: Approval ML19141A1862019-06-0303 June 2019 Final Safety Evaluation for Framatome Inc., Topical Report BAW-10227, Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel Project stage: Approval ML19232A0832019-09-0505 September 2019 Verification Letter of the Approval Version of Framatome Inc. Topical Report Baw 10227, Revision 1, Supplement 1P-A, Revision 0 Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel (CAC MF9716/EPID L-2017-TOP-003 Project stage: Other ML19232A0242019-09-0606 September 2019 Request for Withholding Information from Public Disclosure in August 6, 2019, Publication of BAW-10227, Revision 1, Supplement 1P-A, Revision 0, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel Project stage: Withholding Request Acceptance 2019-06-03
[Table View] |
|
---|
Category:Safety Evaluation
MONTHYEARML19276E4752019-10-30030 October 2019 Final Safety Evaluation for Framatome Inc. Topical Report ANP-10346, Revision 0, ATWS-I Analysis Methodology for BWRs Using RAMONA5-FA (Non-Prop Version) ML19204A0512019-09-24024 September 2019 Final Safety Evaluation for Topical Report ANP-10342P, Revision 0, Gaia Fuel Assembly Mechanical Design ML19204A0592019-09-24024 September 2019 Transmittal of Final Safety Evaluation for Topical Report ANP-10342P, Revision 0, Gaia Fuel Assembly Mechanical Design ML19149A4862019-06-24024 June 2019 Final Safety Evaluation for Topical Report EMF-93-177, Revision 1, Supplement 2P, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material ML19149A4882019-06-24024 June 2019 Resolution of Comments Made on Draft Safety Evaluation for Topical Report EMF-93-177, Revision 1, Supplement 2P, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material ML19141A3682019-06-0303 June 2019 Resolution of Framatome Comments on Draft Safety Evaluation for Topical Report BAW-10227,Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel ML19141A1862019-06-0303 June 2019 Final Safety Evaluation for Framatome Inc., Topical Report BAW-10227, Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel ML19101A4192019-04-23023 April 2019 Transmittal of Draft Safety Evaluation for Topical Report EMF-93-177, Revision 1, Supplement 2P, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material. ML19071A2952019-03-26026 March 2019 Resolution of Comments on Draft Safety Evaluation for Topical Report ANP-10332P, Revision 0 ML19057A5552019-03-26026 March 2019 Transmittal of Final Safety Evaluation for Framatome Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios. ML19052A5722019-03-26026 March 2019 Final Safety Evaluation for Framatome, Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Non-Proprietary Version) ML18236A4262018-09-24024 September 2018 Final Safety Evaluation for Framatome Inc. Topical Report ANP-10341P, the ORFEO-GAIA and ORFEO-NMGRID Critical Heat Flux Correlations (Non-Proprietary) ML18232A2042018-08-15015 August 2018 Final Safety Evaluation for Topical Report BAW-10247P-A, Supplement 2P, Revision 0, Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors, Supplement 2: Mechanical Methods. ML18040B2982018-08-15015 August 2018 Resolution of Comments on Draft Safety Evaluation for Topical Report BAW-10247P-A, Supplement 2P, Revision 0, Realistic Thermal-Mechanical Fuel Rod Methodology for Boiling Water Reactors, Supplement 2: Mechanical Methods. ML18205A6832018-08-0303 August 2018 Final Safety Evaluation for Topical Report ANP-10297P-A, Revision 0, Supplement 1, the Arcadia Reactor Analysis System for PWRs Methodology Description and Benchmarking Results (Non-Proprietary Version) ML18179A1272018-07-17017 July 2018 Request for Withholding Information from Public Disclosure in April 23, 2018, Response for Comment on Draft Safety Evaluation for ANP-10335P, Revision 0 ML18149A5672018-05-25025 May 2018 Final Safety Evaluation for ANP-10335P, Revision 0, Ace/Atrium 11 Critical Power Correlation (Non-Proprietary Version) ML18149A5902018-05-25025 May 2018 Resolution of Comments on Draft Safety Evaluation for Topical Report ANP-10335P, Revision 0, Ace/Atrium 11 Critical Power Correlation (Non-Proprietary Version) ML18144A9512018-05-23023 May 2018 Final Safety Evaluation for Topical Report ANP-10340P, Revision 0, Incorporation of Chromia-Doped Fuel Properties in Areva Approved Methods (Non-Proprietary Version) ML18129A0252018-05-23023 May 2018 Resolutions of Comments on Draft Safety Evaluation for ANP-10340P, Revision 0 ML18128A2762018-05-10010 May 2018 Transmittal of Final Safety Evaluation for Topical Report ANP-10337P, Revision 0, PWR Fuel Assembly Structural Response to Externally Applied Dynamic Excitations (Non-Proprietary Version) ML18128A2422018-05-10010 May 2018 Final Safety Evaluation for Topical Report ANP-10337P, Revision 0, PWR Fuel Assembly Structural Response to Externally Applied Dynamic Excitations (Non-Proprietary Version) 2019-09-24
[Table view] |
Text
RESOLUTION OF COMMENTS BY THE OFFICE OF NUCLEAR REACTOR REGULATION ON DRAFT SAFETY EVALUATION FOR TOPICAL REPORT BAW-10227, REVISION 1, SUPPLEMENT 1P, EVALUATION OF ADVANCED CLADDING AND STRUCTURAL MATERIAL (M5) IN PWR REACTOR FUEL FRAMATOME, INC.
PROJECT NO. 728; DOCKET NO. 99902041 This attachment provides the U.S. Nuclear Regulatory Commission (NRC) staffs review and disposition of the comments made by Framatome Inc. (Framatome) on the draft safety evaluation (SE) for Topical Report BAW-10227, Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR [pressurized water reactor] Reactor Fuel. Framatome provided the comments by letter dated May 16, 2019 (Agencywide Documents Access and Management System Accession No. ML19140A065).
NRC Resolution of Proposed Page Line Proposed Change/Comment Change/Comment 2 47 Change 13 to The NRC staff accepts the proposed editorial change. The change was made accordingly in the final SE.
2 50 Change particles to particle The NRC staff accepts the proposed sizes editorial change. The change was made accordingly in the final SE.