Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
GNRO-2007/00034, Report of 10 CFR50.59 Safety Evaluations and Commitment Changes - April 1, 2006 Through March 31, 2007 | 22 May 2007 | Report of 10 CFR50.59 Safety Evaluations and Commitment Changes - April 1, 2006 Through March 31, 2007 | Safe Shutdown Unanalyzed Condition Shutdown Margin Grab sample Anticipated operational occurrence Probabilistic Risk Assessment Condition Adverse to Quality Scram Discharge Volume Feedwater Controller Failure Fuel cladding Fire Protection Program |
ML021860203 | 16 July 2002 | License Amendment, Revising TS 3.8.1, to Extend Diesel Generator Allowed Outage Time | Safe Shutdown High winds Probabilistic Risk Assessment Tornado Generated Missile Large early release frequency Maintenance Rule Program Fire Protection Program Fire Watch |
ML022180427 | 26 August 2002 | License Amendment, Missed Surveillances, MB5470 | Enforcement Discretion Probabilistic Risk Assessment Missed surveillance Large early release frequency |
ML022250258 | 5 September 2002 | Issuance of Amendment Removal of Operating Restrictions for Performing Emergency Diesel Generator Testing, MB3487 | Safe Shutdown High winds Probabilistic Risk Assessment Tornado Generated Missile Large early release frequency Offsite Circuit |
ML022280173 | 10 September 2002 | License Amendment 155, Removal of Operating Mode Restrictions for Performing High Pressure Core Spray Emergency Diesel Generator Testing | High winds Probabilistic Risk Assessment Tornado Generated Missile Large early release frequency |
ML022490416 | 6 September 2002 | Issuance of Amendment Reactor Cavity Pool Draindown | Reactor Vessel Water Level Ultimate heat sink GOTHIC |
ML022630304 | 10 October 2002 | Unit One, Amendment 156 to License NPF-29, Increasing Licensed Power Level by Approximately 1.7% from 3,833 Megawatts Thermal (Mwt) to 3,898 Mwt | Safe Shutdown Shutdown Margin Safety Limit Minimum Critical Power Ratio Ultimate heat sink Anticipated operational occurrence Hydrostatic Abnormal operational transient Fuel cladding |
ML023240137 | 19 November 2002 | Emergency Plan Change - Emergency Action Levels | |
ML031130220 | 23 April 2003 | Issuance of Amendment 157 Corrections and Clarifications to Certain Requirements and Information | High Radiation Area Locked High Radiation Area Minimum Critical Power Ratio |
ML031810860 | 30 June 2003 | Amendment 158, Deleting Technical Specification 5.5.3 and License Condition 2.C(33)(c), Eliminating Requirement to Have and Maintain Post Accident Sampling and Primary Coolant Sources Outside Containment | Grab sample |
ML033030330 | 27 October 2003 | License Amendment, Removal of Mode Restrictions for Surveillance Testing of the Division 3 Battery | Anticipated operational occurrence |
ML033110379 | 4 November 2003 | Issuance of License Amendment 160 Change to the Reactor Vessel Material Surveillance Program | |
ML040090316 | 8 January 2004 | Amendment, Changes to Primary Containment and Drywell Isolation Instrumentation Requirements | |
ML040300152 | 28 January 2004 | Issuance of Amendment one-time Extension of the Integrated Leak Rate Test and Drywell Bypass Test Interval | Probabilistic Risk Assessment Large early release frequency |
ML040300345 | 23 January 2004 | Issuance of Amendment Residual Heat Removal Shutdown Cooling System Isolation Instrumentation | Reactor Vessel Water Level |
ML041040152 | 12 April 2004 | License Amendment GG-165/RB-138/WAT-193 Revision of Respective Appendix B Environmental Protection Plans (Epps) Non-Radiological | |
ML041690514 | 16 June 2004 | Issuance of License Amendment 166 Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors | Probabilistic Risk Assessment Fuel cladding |
ML041840453 | 2 July 2004 | ANO, Units 1 and 2, Grand Gulf, Unit 1, River Bend, Unit 1 and Waterford, Unit 3 - Request for Relief of the ASME Boiler and Pressure Vessel Code, Appendix Vlll, Supplement 10 | Non-Destructive Examination Incorporated by reference Dissimilar Metal Weld |
ML042030439 | 21 July 2004 | Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code, Section XI, Inservice Testing Program | Incorporated by reference |
ML043220442 | 9 December 2004 | ANO, Units 1 & 2, Grand Gulf, River Bend, Waterford, Indian Point Units 1, 2, & 3; FitzPatrick, Pilgrim and Vermont Yankee - Revision to the Quality Assurance Program Manual (QAPM) | |
ML043570274 | 21 December 2004 | ANO Units 1 and 2; Grand Gulf; River Bend and Waterford Unit 3 | Incorporated by reference |
ML050330405 | 1 February 2005 | Unit 3 - Use of Delta Protection Suits | Mururoa |
ML051120278 | 3 May 2005 | License Amendment, Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports | |
ML051540277 | 12 July 2005 | License Amendment No. 168, Revise Containment Air Lock Leak Rate Test Acceptance Criteria | |
ML052020125 | 27 July 2005 | Proposed Upgraded EALs Using NEI 99-01 Rev. 4 Methodology | |
ML052240261 | 31 August 2005 | Request 1st-2005-1, Use of Subsequent American Society of Mechanical Engineers Operation and Maintenance Code Edition and Addenda for Condition Monitoring Check Valves | Incorporated by reference |
ML060520052 | 1 February 2006 | Issuance of License Amendment 169 Regarding Adoption of Approved Generic Changes to the Technical Specifications | Power Operated Valves |
ML060730264 | 7 March 2006 | Closure Memorandum: Issue for Resolution 2005-083: Evaluation: Part 21 - Engine Systems - Governor Drive Coupling Element | |
ML062120154 | 2 October 2006 | GGNS, IP-1, IP-2, IP-3, Pilgrim, River Bend, Vermont Yankee, and Waterford - Application to Use Effective Dose Equivalent Weighting Factors for External Exposure | |
ML062140354 | 29 September 2006 | Issuance of Amendment Proposed Resolution of Kaowool Issues | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Significance Determination Process Large early release frequency Fire Protection Program Hourly Fire Watch |
ML062230281 | 2 October 2006 | GGNS, IP1, IP2, IP3, Pilgrim, River Bend, Vermont Yankee, and Waterford - Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits - Letter to Entergy Operations, Inc. Enclosing Safety Evaluation | Mururoa |
ML070120081 | 2 February 2007 | River Bend Station, & Waterford Steam Electric Station, Unit 3 - Request for Alternative CEP-PT-001, Visual Exam of Vent & Drain Leakage Tests (TAC MD1399, MD1400, MD1401, MD1402, & MD1403) | Hydrostatic VT-2 Incorporated by reference |
ML070250384 | 20 February 2007 | Issuance of Amendment 171 Technical Specification Change to Add Limiting Condition of Operation 3.0.8 on the Inoperability of Snubbers | Safe Shutdown Earthquake Probabilistic Risk Assessment Large early release frequency Earthquake |
ML070300411 | 22 February 2007 | Issuance of License Amendment 173 Regarding Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr). | Anticipated operational occurrence Incorporated by reference Fuel cladding |
ML070300414 | 13 February 2007 | Relief, Request for Alternative GG-ISI-003 to Extend the Current Inservice Inspection Interval | Probabilistic Risk Assessment Incorporated by reference |
ML070530648 | 16 March 2007 | Issuance of License Amendment No. 174 a Technical Specification Change to Allow Use of Control Rod Assemblies with Different Control Material | Shutdown Margin Anticipated operational occurrence |
ML071280764 | 30 May 2007 | License Amendment, Issuance of Amendment 175 Re Technical Specifications Change Regarding Mode Change Limitations (TSTF-359) Using Consolidated Line Item Improvement Process, & Correct Example 1.4-1 (TSTF-485) | Safe Shutdown Post Accident Monitoring Probabilistic Risk Assessment Missed surveillance Significance Determination Process Large early release frequency Power change |
ML071940050 | 18 July 2007 | Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac MD4536) | Safe Shutdown B.5.b Severe Accident Management Guideline Safeguards Contingency Plan B.5.b Mitigating Strategies Fire Protection Program |
ML071990049 | 23 July 2007 | Correction to Safety Evaluation for License Amendment 175 - TS Change Re Mode Change Limitations (TSTF-359) Using Consolidated Line Item Improvement Process, and Correct Example 1.4-1 (TSTF-485) | |
ML072140501 | 24 August 2007 | Issuance of Amendment 176 Change to Technical Specifications to Allow Certain Types of Relief Valves to Be Used as Isolation Devices | |
ML072430005 | 21 September 2007 | Request for Alternative GG-ISI-002 - to Implement Risk-Informed Inservice Inspection Program Based on the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Code Case N-716 | Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Large early release frequency Dissimilar Metal Weld |
ML073190201 | 28 November 2007 | Inadvertent Release of Proprietary Information, Contained in 10/24/2007 Amendment No. 177 Changes to TS SR 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency (Tac No. MD3469) | |
ML073190250 | 24 October 2007 | License Amendment 177, Changes to TS SR 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence |
ML081010019 | 23 April 2008 | Three Relief Requests for Jockey Pumps for the Third 10-Year Inservice Testing Interval | Incorporated by reference |
ML081620005 | 11 July 2008 | Relief Request VRR-GGNS-2007-01 and -02, Alternative Inservice Test Requirement, Extension to ASME OM Code 5-Year IST Interval for Main Steam Safety Relief Valve | |
ML081760023 | 14 October 2008 | Issuance of Amendment No. 178, Adoption of Technical Specifications Task Force (TSTF) Traveler No. 448, Revision 3, Control Room Envelope Habitability. | Safe Shutdown Earthquake Fire Protection Program |
ML082490768 | 5 November 2008 | Staff Evaluation Providing Basis for Partial Denial of License Amendment Request, Technical Specifications Changes for Condensate Storage Tank Level-Low Instrumentation | Safe Shutdown Unanalyzed Condition Reactor Vessel Water Level |
ML090290119 | 23 February 2009 | for 4th 10-Year ISI and Grand Gulf, Unit 1, River Bend, and Waterford, Unit 3 for 3rd 10-Year ISI - Request for Alternative CEP-PT-002, Visual Examination of Vent, Drain, and Branch Leakage Tests (TAC Nos. MD8819 to MD8822) | Hydrostatic VT-2 Incorporated by reference |
ML090370898 | 6 March 2009 | Unit 3 - Request for Alternative CEP-ISI-012, Use Alternative Requirements in ASME Code Case N-753 | Nondestructive Examination VT-2 Incorporated by reference |
ML090630469 | 30 March 2009 | Request for Alternative CEP-CISI-001, Use Alternative Requirements in ASME Code Case N-739-1 | Nondestructive Examination VT-2 Incorporated by reference |