July 23, 2007 Mr. William R. Brian Vice President of Operations Grand Gulf Nuclear Station Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - CORRECTION TO SAFETY EVALUATION FOR LICENSE AMENDMENT NUMBER 175 RE: TECHNICAL SPECIFICATION CHANGE REGARDING MODE CHANGE LIMITATIONS (TSTF-359) USING CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS, AND CORRECT EXAMPLE 1.4-1 (TSTF-485) (TAC NO. MD4276)
Dear Mr. Brian:
On May 30, 2007, the Nuclear Regulatory Commission (NRC, the staff) issued Amendment Number 175 to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit 1 (GGNS). This amendment revised the Technical Specifications (TSs) in response to your application dated February 8, 2007.
The amendment modified GGNS TS requirements for MODE change limitations in Limiting Condition of Operation (LCO) 3.0.4, Surveillance Requirement (SR) 3.0.4, and TS 1.4, Frequency, Example 1.4-1, Surveillance Requirements, consistent with Revision 9 of NRC-approved Industry TS Task Force (TSTF) Standard TS Change Traveler, TSTF-359, Increase Flexibility in MODE Restraints and TSTF-485, Revision 0, Correct Example 1.4-1.
After issuing the amendment, the NRC staff noted that in Section 1.2, Table-1, on page 3 of the Safety Evaluation (SE), the "Description of Change" for TS 3.4.8 incorrectly stated:
The existing NOTE for REQUIRED ACTIONS is replaced with a NOTE stating LCO 3.0.4.c is not applicable.
The correct Description of Change should read as follows:
The existing NOTE for REQUIRED ACTIONS is replaced with a NOTE stating LCO 3.0.4.c is applicable.
Enclosed with this letter is a replacement page 3 for the staffs SE enclosed with License Amendment No. 175, dated May 30, 2007, showing the revision with the revision bar in the margin. This error to the SE does not change the NRC staffs conclusions regarding the acceptability of the Amendment No. 175. Please discard the associated page from the previous SE and replace it with the enclosed page.
W. R. Brian If you have any further questions regarding this matter, please contact me at 301-415-3308.
Sincerely,
/RA/
Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: See next page
Enclosure:
As stated
ML071990049 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME BVaidya JBurkhardt THiltz, MCT for DATE 7/23/07 7/23/07 7/23/07 Item No.
GGNS TS No.
GGNS TS Title Description of Change 6
3.4.7 RCS [Reactor Coolant System]
Leakage Detection Instrumentation The ACTIONS NOTE stating LCO 3.0.4 is not applicable has been deleted.
7 3.4.8 RCS Specific Activity The existing NOTE for REQUIRED ACTIONS is replaced with a NOTE stating LCO 3.0.4.c is applicable.
l 8
3.4.9 Residual Heat Removal (RHR)
Shutdown Cooling System - Hot Shutdown The ACTIONS NOTE stating LCO 3.0.4 is not applicable has been deleted and the remaining NOTE renumbered.
9 3.5.1 ECCS [Emergency Core Cooling Systems] - Operating A NOTE is added to the ACTIONS stating LCO 3.0.4.b is not applicable to HPCS.
10 3.5.3 ECCS - Shutdown A NOTE is added to the ACTIONS stating LCO 3.0.4.b is not applicable to RCIC.
11 3.6.3.1 Deleted by Amendment No. 166, dated June 16, 2004.
Not applicable.
12 3.6.3.2 Primary Containment and Drywell Hydrogen Igniters The REQUIRED ACTION A.1 NOTE stating LCO 3.0.4 is not applicable has been deleted.
13 3.6.3.3 Drywell Purge System The REQUIRED ACTION A.1 NOTE stating LCO 3.0.4 is not applicable. has been deleted.
14 3.8.1 A.C. [Alternating Current] Sources
- Operating A NOTE is added to the ACTIONS stating LCO 3.0.4.b is not applicable to DGs [Diesel Generators].
1.3 Verification and Commitments As discussed in the notice of availability, Applicability section, published in the Federal Register on April 4, 2003, (68 FR 16579) for this TS improvement, GGNS TS has incorporated the TS Bases Control Program (TS 5.5.1.1) and has adopted the requirements of SR 3.0.1 and associated bases in its TS.
Further, the licensee, in its submission, the licensee stated that the following plant-specific verifications were performed as follows:
[Entergy] has proposed changes to the TS Bases for LCO 3.0.4 and SR 3.0.4 which state that use of the TS mode change limitation flexibility established by LCO 3.0.4 and SR 3.0.4 is not to be interpreted as endorsing the failure to exercise the good practice of restoring systems or components to operable status before entering an associated MODE or other specified condition in the TS Applicability.
The proposed changes to the TS Bases for LCO 3.0.4 and SR 3.0.4 provide details on how to implement the new requirements. The Bases changes provide
November 2006 Grand Gulf Nuclear Station cc:
Executive Vice President
& Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Chief Energy and Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 10385 Jackson, MS 39289-0385 President Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, MS 39150 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 399 Port Gibson, MS 39150 General Plant Manager Operations Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 State Health Officer State Board of Health P.O. Box 139 Jackson, MS 39205 Office of the Governor State of Mississippi Jackson, MS 39201 Attorney General Asst. Attorney General State of Mississippi P.O. Box 22947 Jackson, MS 39225-2947 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Director Nuclear Safety Assurance Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Director Nuclear Safety & Licensing Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213-8298 Manager, Licensing Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150 Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russsell Hall, Room 201 Natchitoches, LA 71497