Letter Sequence Approval |
---|
|
|
MONTHYEARML0331103792003-11-0404 November 2003 Issuance of License Amendment 160 Change to the Reactor Vessel Material Surveillance Program Project stage: Approval 2003-11-04
[Table View] |
|
---|
Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21019A2192021-02-24024 February 2021 Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20101G0542020-04-15015 April 2020 Issuance of Amendment No. 224 One Cycle Extension of Appendix J Integrated Leakage Test and Drywell Bypass Test Interval (Exigent Circumstances) ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19123A0142019-06-18018 June 2019 Issuance of Amendment No. 220, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML19094A7992019-06-11011 June 2019 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5B ML19084A2182019-05-23023 May 2019 Issuance of Amendment No. 218 to Revise Technical Specification to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19025A0232019-03-12012 March 2019 Issuance of Amendment No. 216 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML18215A1962019-03-12012 March 2019 Issuance of Amendment No. 217 to Modify the Updated Safety Analysis Report to Replace Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML18306A5132018-11-30030 November 2018 Issuance of Conforming Amendment Nos. 262, 312 and 215 Transfers of Renewed Facility Operating Licenses ML17240A2322017-10-0404 October 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 213 for Administrative Name Change to Licensee South Mississippi Electric Power Association (CAC No. MF9588) ML17116A0322017-06-0707 June 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 212 to Adopt Technical Specifications Task Force-427, Allowance For Non-Technical Specification Barrier Degradation on Supported System Operability (CAC No. MF8692.) ML16243A0242016-12-0808 December 2016 Record of Decision - License Renewal Application for Grand Gulf Nuclear Station, Unit 1 ML16292A4622016-12-0101 December 2016 Renewed Facility Operating License for Grand Gulf Nuclear Station, Unit 1 ML16140A1332016-08-0404 August 2016 Issuance of Amendment Revision of Technical Specifications to Remove Inservice Testing Program and Clarify Surveillance Requirement Usage Rule Application ML16132A1942016-05-26026 May 2016 Correction to Amendment No. 207, Request for Changing Five Technical Specifications Allowable Levels ML16119A1482016-05-25025 May 2016 Issuance of Amendment No. 210 Re. Cyber Security Plan Milestone 8 Full Implementation Schedule ML16011A2472016-02-17017 February 2016 Issuance of Amendment No. 209 Revision of Technical Specifications for Containment Leak Rate Testing ML15336A2562015-12-17017 December 2015 Issuance of Amendment No. 208 Adoption of Technical Specification Task Force Traveler TSTF-522 ML15180A1702015-08-31031 August 2015 Issuance of Amendment Revision to Technical Specification 5.65.B to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request ML15195A3552015-08-31031 August 2015 Issuance of Amendment Request for Changing Five Technical Specifications Allowable Values ML15229A2182015-08-18018 August 2015 Redacted, Issuance of Amendment Adoption of Single Fluence Methodology ML15229A2132015-08-18018 August 2015 Redacted, Issuance of Amendment Regarding Technical Specification 2.1.1.2 of Technical Specification Section 2.1.1.2, Reactor SLs (Safety Limits) ML15104A6232015-05-12012 May 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-523 ML14311A4792014-12-12012 December 2014 Issuance of Amendment No. 200, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML14162A3782014-09-25025 September 2014 Redacted, Issuance of Amendment No. 199, Delete Operating License Condition 2.C(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle ML14106A1332014-06-30030 June 2014 Issuance of Amendment No. 198, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, as Part of Consolidated Line Item Improvement Process ML13343A1092013-12-26026 December 2013 Issuance of Amendment No. 197, Revise Technical Specifications and Surveillance Requirements to Support Operation with 24-Month Fuel Cycle in Accordance with Generic Letter 91-04 ML13261A3492013-09-25025 September 2013 Issuance of Amendment No. 196, Modify Updated Final Safety Analysis Report to Revise the Methodology for Standby Service Water Passive Failure ML13261A2642013-09-25025 September 2013 Redacted Version, Issuance of Amendment No. 195, Revise Criticality Safety Analysis and Technical Specification 4.3.1, Criticality, and Delete Spent Fuel Pool Loading Criteria License Condition ML13157A0292013-08-0505 August 2013 Issuance of Amendment No. 194, Revise TS Table 3.3.6.1-1 to Support Correction of Non-Conservative Allowable Value for Primary Containment and Drywell Isolation Instrumentation ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12240A2392012-12-0505 December 2012 Issuance of Amendment No. 192, Revise Physical Protection License Condition Related to Milestone 6 of the Cyber Security Plan Implementation ML1208601492012-05-11011 May 2012 Issuance of Amendment No. 190, Revise Technical Specification 3.1.7, Standby Liquid Control (SLC) System, to Support Use of Sodium Pentaborate Solution Enriched with Boron-10 Isotope ML1207202832012-04-20020 April 2012 Issuance of Amendment No. 189, Revise Minimum Critical Power Ratio Safety Limit in Technical Specification 2.1.1.2 for Two-Loop and Single Recirculation Loop ML1117306812011-09-12012 September 2011 Issuance of Amendment No. 187, Revise Technical Specifications to Adopt TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML1119401652011-07-27027 July 2011 Issuance of Amendment No. 186, Revise License Condition and Approval of Cyber Security Plan and Associated Implementation Schedule ML1107304022011-04-27027 April 2011 Issuance of Amendment No. 185, Revise Surveillance Requirement Notes in Technical Specifications Associated with Condensate Storage Tank Level-Low as Reflected in TSTF-493 ML0909804292009-04-13013 April 2009 Correction to Amendment No. 182, Surveillance Requirements for Diesel Generator Slow - Start Testing (MD9641) ML0817600232008-10-14014 October 2008 Issuance of Amendment No. 178, Adoption of Technical Specifications Task Force (TSTF) Traveler No. 448, Revision 3, Control Room Envelope Habitability. ML0731902502007-10-24024 October 2007 License Amendment 177, Changes to TS SR 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency ML0721405012007-08-24024 August 2007 Issuance of Amendment 176 Change to Technical Specifications to Allow Certain Types of Relief Valves to Be Used as Isolation Devices 2022-05-12
[Table view] Category:Safety Evaluation
MONTHYEARML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21294A0672021-10-28028 October 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1, Alternative Request for Pressure Isolation Valve Testing Frequency ML21258A4082021-09-21021 September 2021 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of Boiling Water Reactor Vessel and Internals Project Guidelines ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21019A2192021-02-24024 February 2021 Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20101G0542020-04-15015 April 2020 Issuance of Amendment No. 224 One Cycle Extension of Appendix J Integrated Leakage Test and Drywell Bypass Test Interval (Exigent Circumstances) ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19266A5862019-10-11011 October 2019 Relief Request GG-ISI-023, Examination Coverage of Class 1 Piping and Vessel Welds ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19123A0142019-06-18018 June 2019 Issuance of Amendment No. 220, Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML19094A7992019-06-11011 June 2019 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5B ML19084A2182019-05-23023 May 2019 Issuance of Amendment No. 218 to Revise Technical Specification to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18215A1962019-03-12012 March 2019 Issuance of Amendment No. 217 to Modify the Updated Safety Analysis Report to Replace Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML19018A2692019-03-12012 March 2019 Safety Evaluation Input for Grand Gulf Nuclear Station Unit 1, License Amendment Request to Implement Technical Specification Task Force-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control ML19025A0232019-03-12012 March 2019 Issuance of Amendment No. 216 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML17285A7942017-10-30030 October 2017 Grand Gulf Nuclear Station, Unit 1 - Relief Request GG-ISI-021 Proposing An Alternative For Fourth Ten Year Inservice Inspection Program (CAC NO. MF9752; EPID L-2017-LLR-0031) ML17240A2322017-10-0404 October 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 213 for Administrative Name Change to Licensee South Mississippi Electric Power Association (CAC No. MF9588) ML17235A5332017-08-31031 August 2017 Relief Request GG-ISI-022 to Allow Use of Later Editions and Addenda of American Society of Mechanical Engineers Code for Inservice Inspection ML17116A0322017-06-0707 June 2017 Grand Gulf Nuclear Station, Unit 1 - Issuance of Amendment No. 212 to Adopt Technical Specifications Task Force-427, Allowance For Non-Technical Specification Barrier Degradation on Supported System Operability (CAC No. MF8692.) ML16278A0172016-10-19019 October 2016 Entergy Fleet Relief Request RR-EN-ISI-15-1, Alternative to Maintain Inservice Inspection Related to Activities to the 2001 Edition/2003 Addendum of ASME Section XI Code ML16253A3222016-09-27027 September 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16140A1332016-08-0404 August 2016 Issuance of Amendment Revision of Technical Specifications to Remove Inservice Testing Program and Clarify Surveillance Requirement Usage Rule Application ML16160A0922016-06-16016 June 2016 Relief Request GG-IST-2015-1 Related to the Inservice Testing Program ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16119A1482016-05-25025 May 2016 Issuance of Amendment No. 210 Re. Cyber Security Plan Milestone 8 Full Implementation Schedule ML16011A2472016-02-17017 February 2016 Issuance of Amendment No. 209 Revision of Technical Specifications for Containment Leak Rate Testing ML15336A2562015-12-17017 December 2015 Issuance of Amendment No. 208 Adoption of Technical Specification Task Force Traveler TSTF-522 ML15195A3552015-08-31031 August 2015 Issuance of Amendment Request for Changing Five Technical Specifications Allowable Values ML15180A1702015-08-31031 August 2015 Issuance of Amendment Revision to Technical Specification 5.65.B to Add Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density ML15229A2192015-08-31031 August 2015 Redacted, Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus License Amendment Request ML15229A2132015-08-18018 August 2015 Redacted, Issuance of Amendment Regarding Technical Specification 2.1.1.2 of Technical Specification Section 2.1.1.2, Reactor SLs (Safety Limits) ML15229A2182015-08-18018 August 2015 Redacted, Issuance of Amendment Adoption of Single Fluence Methodology ML15104A6232015-05-12012 May 2015 Issuance of Amendment Adoption of Technical Specifications Task Force Standard Technical Specifications Change Traveler TSTF-523 ML14311A4792014-12-12012 December 2014 Issuance of Amendment No. 200, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML14162A3782014-09-25025 September 2014 Redacted, Issuance of Amendment No. 199, Delete Operating License Condition 2.C(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle ML14210A2662014-08-0808 August 2014 Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 & ML14184A7822014-08-0101 August 2014 Relief Request GG-ISI-017, Alternative to Reactor Vessel Internal Structure Examination, Use of BWRVIP Guidelines, B13.10, Categories B-N-1 and B-N-2, Third 10-Year Inservice Inspection Interval 2023-09-29
[Table view] |
Text
November 4, 2003 Mr. Jeff S. Forbes Vice President, Operations GGNS Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - ISSUANCE OF AMENDMENT RE: CHANGE TO THE REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM (TAC NO. MB8393)
Dear Mr. Forbes:
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 160 to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit 1. This amendment revises the Updated Final Safety Analysis Report (UFSAR) in response to your application dated April 3, 2003.
The amendment revises the UFSAR to change the Reactor Vessel Material Surveillance Program. The change will reflect participation in the Boiling Water Reactor Vessel and Internals Project Integrated Surveillance Program.
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Be aware that the changes to the UFSAR document are controlled in accordance with the requirements of Title 10 of the Code of Federal Regulations, Section 50.59, Changes, tests, and experiments.
Sincerely,
/RA by M.Webb for/
Bhalchandra Vaidya, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosures:
- 1. Amendment No. 160 to NPF-29
- 2. Safety Evaluation cc w/encls: See next page
November 4, 2003 Mr. Jeff S. Forbes Vice President, Operations GGNS Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - ISSUANCE OF AMENDMENT RE: CHANGE TO THE REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM (TAC NO. MB8393)
Dear Mr. Forbes:
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 160 to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit 1. This amendment revises the Updated Final Safety Analysis Report (UFSAR) in response to your application dated April 3, 2003.
The amendment revises the UFSAR to change the Reactor Vessel Material Surveillance Program. The change will reflect participation in the Boiling Water Reactor Vessel and Internals Project Integrated Surveillance Program.
A copy of our related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions next biweekly Federal Register notice.
Be aware that the changes to the UFSAR document are controlled in accordance with the requirements of Title 10 of the Code of Federal Regulations, Section 50.59, Changes, tests, and experiments.
Sincerely,
/RA by M.Webb for/
Bhalchandra Vaidya, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-416 DISTRIBUTION:
PUBLIC J. Honcharik PDIV-1 Reading L. Lois
Enclosures:
RidsRgn4MailCenter (AHowell)
- 1. Amendment No. 160 to NPF-29 RidsNrrDlpmLpdiv (HBerkow)
- 2. Safety Evaluation RidsNrrDlpmLpdiv1 (RGramm)
RidsNrrPMBVaidya cc w/encls: See next page RidsNrrLADJohnson RidsOgcRp RidsAcrsAcnwMailCenter G.Hill (2)
RDennig, DRIP/RORP Accession No.:ML033110379 *No significant change from SE Input OFFICE PDIV-1/PM PDIV-1/LA EMCB-A/SC* SRXB-B/SC* OGC PDIV-1/SC NAME BVaidya:sab DJohnson SCoffin JUhle LZaccari(NLO) RGramm DATE 10/21/03 10/21/03 10/2/03 9/2/03 10/23/03 11/4/03 OFFICIAL RECORD COPY
ENTERGY OPERATIONS, INC.
SYSTEM ENERGY RESOURCES, INC.
SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION ENTERGY MISSISSIPPI, INC.
DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.160 License No. NPF-29
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Entergy Operations, Inc. (the licensee) dated April 3, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, by Amendment No. 160, the license is amended to authorize revision to the Updated Final Safety Analysis Report (UFSAR), as set forth in the application for amendment by the licensee dated April 3, 2003. The licensee shall update the UFSAR to incorporate the revision to the basis for compliance with the requirements of Appendix H to 10 CFR Part 50, Reactor Vessel Material Surveillance Program Requirements, as described in the amendment application of April 3, 2003, and the staff Safety Evaluation attached to this amendment, and shall submit the revised description authorized by these amendments with the next update of the UFSAR.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days from the date of issuance. The UFSAR changes shall be implemented in the next periodic update to the UFSAR in accordance with 10 CFR 50.71(e).
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Robert A. Gramm, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Date of Issuance: November 4, 2003
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 160 TO FACILITY OPERATING LICENSE NO. NPF-29 ENTERGY OPERATIONS, INC., ET AL.
GRAND GULF NUCLEAR STATION, UNIT 1 DOCKET NO. 50-416
1.0 INTRODUCTION
By application dated April 3, 2003 (Reference 1), Entergy Operations, Inc., et al. (Entergy or the licensee), requested changes to the Updated Final Safety Analysis Report (UFSAR) for Grand Gulf Nuclear Station, Unit 1 (GGNS), to incorporate the Boiling Water Reactor (BWR) Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) into the GGNS licensing basis in accordance with U. S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2002-05, "NRC Approval of Boiling Water Reactor Pressure Vessel Integrated Surveillance Program," dated April 8, 2002. Specifically, the proposed changes would revise the Reactor Vessel Material Surveillance Program requirements in Section 5.3 of the UFSAR to reflect participation in the BWRVIP ISP. Under the BWRVIP ISP, the test specimens currently in the GGNS reactor capsules need not be removed or tested, because other BWRVIP ISP participants will remove and test specimens that represent the GGNS vessel materials. The GGNS capsule withdrawal schedule described in the UFSAR will refer to the withdrawal time as "deferred" since they will be retained in the reactor for contingency.
The BWRVIP Reactor Pressure Vessel (RPV) ISP was submitted for NRC staff review and approval in topical reports BWRVIP-78, BWR Vessel and Internals Project, BWR Integrated Surveillance Program Plan (Reference 2), and BWRVIP-86, BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan (Reference 3). Additional information necessary to establish the technical basis for, and proposed implementation of, the BWRVIP ISP was provided in letters from the BWRVIP to the NRC dated December 15, 2000 (Reference 4), and May 30, 2001 (Reference 5). The NRC staff approved the proposed BWRVIP ISP in a safety evaluation (SE) which was provided to the BWRVIP by letter dated February 1, 2002 (Reference 6). However, the NRC staff SE required that plant-specific information be provided by BWR licensees who wish to implement the BWRVIP ISP for their facilities. Reference 1 addressed the plant-specific information required in the Reference 6 SE.
2.0 REGULATORY EVALUATION
The staff finds that the licensee in Reference 1, Section 5.0 identified the applicable regulatory requirements. The regulatory requirements for which the NRC staff based its acceptance are described below.
Nuclear power plant licensees are required by Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix H, to implement RPV surveillance programs to ...monitor changes in the fracture toughness properties of ferritic materials in the reactor vessel beltline region...which result from exposure of these materials to neutron irradiation and the thermal environment.... Two specific alternatives are provided with regard to the design of a facilitys RPV surveillance program that may be used to address the requirements of Appendix H to 10 CFR Part 50.
The first alternative is the implementation of a plant-specific RPV surveillance program consistent with the requirements of American Society for Testing and Materials (ASTM)
Standard Practice E 185, Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels. In the design of a plant-specific RPV surveillance program, a licensee may use the edition of ASTM Standard Practice E 185 that was current on the issue date of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code to which the reactor vessel was purchased, or later editions through the 1982 edition.
The second alternative provided in Appendix H to 10 CFR Part 50 is the implementation of an ISP. An ISP is defined in Appendix H to 10 CFR Part 50 as occurring when ...the representative materials chosen for surveillance for a reactor are irradiated in one or more other reactors that have similar design and operating features.... Five specific criteria are stated in Appendix H to 10 CFR Part 50 that must be met to support approval of an ISP:
- a. The reactor in which the materials will be irradiated and the reactor for which the materials are being irradiated must have sufficiently similar design and operating features to permit accurate comparisons of the predicted amount of radiation damage.
- b. Each reactor must have an adequate dosimetry program.
- c. There must be adequate arrangement for data sharing between plants.
- d. There must be a contingency plan to assure that the surveillance program for each reactor will not be jeopardized by operation at reduced power level or by an extended outage of another reactor from which data are expected.
- e. There must be substantial advantages to be gained, such as reduced power outages or reduced personnel exposure to radiation, as a direct result of not requiring surveillance capsules in all reactors in the set.
The NRC staff approved the proposed BWRVIP ISP in Reference 6, in which all of the criteria cited above for approval of an ISP were addressed either completely or partially. For those criteria that could not be fully addressed in Reference 6, plant-specific information was required. In Reference 6, the NRC staff identified the specific information that would be required from licensees who plan to implement the BWRVIP for their facilities. Reference 6 states that:
[L]icensees who wish to participate in the BWR ISP must provide, for NRC staff review and approval, information which defines how they will determine RPV and/or surveillance capsule fluences based on the dosimetry data which will be
available for their facilities. This information must be submitted concurrently with each licensees submittal to replace their existing plant-specific surveillance program with the BWR ISP as part of their facilitys licensing basis. The information submitted must be sufficient for the staff to determine that:
(1) RPV and surveillance capsule fluences will be established as based on the use of an NRC-approved fluence methodology that will provide acceptable results based on the available dosimetry data, (2) if one methodology is used to determine the neutron fluence values for a licensees RPV and one or more different methodologies are used to establish the neutron fluence values for the ISP surveillance capsules which represent that RPV in the ISP, the results of these differing methodologies are compatible (i.e., within acceptable levels of uncertainty for each calculation).
Regulatory Guide (RG) 1.190, Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence, describes methods and assumptions acceptable to the NRC staff for determining the pressure vessel neutron fluence. The RG is intended to ensure the accuracy and reliability of the fluence determination required by General Design Criteria 14, 30, and 31 of Appendix A, General Design Criteria for Nuclear Power Plants, to 10 CFR Part 50.
This plant-specific information was required by the NRC staff to ensure that criterion III.C.1.b and III.C.1.c for an ISP from Appendix H to 10 CFR Part 50 could be met by each facility and that the data that would be shared as a part of BWRVIP ISP could be effectively utilized by each licensee for the monitoring of RPV embrittlement for their facility.
The regulations in 10 CFR 50.90, "Application for amendment of license or construction permit,"
10 CFR 50.91, "Notice for public comment; State consultation," and 10 CFR 50.92, "Issuance of amendment," describe the requirements for application of amendments to the operating license and determination of no significant hazards consideration.
3.0 TECHNICAL EVALUATION
The NRC staff has reviewed the licensee's regulatory and technical analyses in support of its proposed license amendment which are described in Sections 3.0, 4.0, and 5.0 of Reference 1.
The detailed evaluation below will support the conclusion that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
In Reference 1, Entergy submitted information for GGNS which addressed the information requested in Reference 6. Entergy submitted a revised Section 5.3.1.6.2 of the GGNS UFSAR by Reference 1, which stated:
Neutron fluence calculations performed after 2002 will be in accordance with a methodology which has been approved by the NRC staff and is consistent with the attributes identified in U. S. Nuclear Regulatory Commission Regulatory Guide 1.190,
Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence.
The NRC staff has concluded that the inclusion of this statement in the GGNS UFSAR is sufficient to address both items (1) and (2) from Reference 6. Regarding item (1), the licensees use of a methodology for determining the GGNS RPV neutron fluence values, which is consistent with the attributes of RG 1.190 and has been approved by the NRC staff, will provide acceptable results based upon the available dosimetry data. Regarding item (2), RPV surveillance capsules tested under the BWRVIP ISP will have their fluences determined by the use of a methodology which is consistent with the attributes of RG 1.190 and has been approved by the NRC staff. The NRC staff has concluded that any two (or more) different fluence methodologies will provide compatible results (as defined in Reference 6), provided that the best estimate fluence values are within each others uncertainty bounds. In addition, Entergy provided an additional commitment in Reference 1 regarding when they will perform an updated RPV fluence analysis for the GGNS RPV:
Entergy will perform new fluence calculations by December 2006. A neutron fluence calculation methodology which has been approved by the Nuclear Regulatory Commission staff and is consistent with the attributes identified in United States NRC Regulatory Guide 1.190, Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence, will be used for the determination of Reactor Pressure Vessel and surveillance capsule neutron fluence values. Based on the results of this updated fluence analysis and the results/data available through the Boiling Water Reactor Vessel Internals Program for the reactor vessel surveillance capsule testing, the current pressure/temperature Limit Curves will be reevaluated for validity and new ones will be developed, if needed.
The NRC staff found this commitment by Entergy to be acceptable since the current RPV fluence calculations for the GGNS RPV are expected to remain conservative with respect to the actual, accumulated RPV neutron fluence through December 2006 to support operation of the facility.
Entergy provided a revised Section 5.3.1.6.1 of the GGNS UFSAR by Reference 1, which documented the licensees incorporation of the BWRVIP ISP into the GGNS licensing basis, which states, in part:
The Grand Gulf [Nuclear Station, Unit 1] material surveillance program is administered in accordance with the BWR Vessel and Internals Project Integrated Surveillance Program (BWRVIP ISP) as described in References 3 [Letter from W. H. Bateman (NRC) to C. Terry (BWRVIP), Safety Evaluation Regarding EPRI [Electric Power Research Institute] Proprietary Reports 'BWR Vessel and Internals Project - BWR Integrated Surveillance Program Plan (BWRVIP-78)' and 'BWRVIP-86: BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan' dated February 1, 2002] and 4 [EPRI Technical Report 1003346, entitled BWRVIP-86-A: BWR Vessel and Internals Project Updated Integrated Surveillance Program (ISP) Implementation Plan, Final Report, dated October 2002].
In addition, Entergy provided, in Section 5.3.1.6.1 of the GGNS UFSAR, the revised withdrawal schedule for the surveillance capsules in GGNS in accordance with the NRC staff-approved BWRVIP-86.
The NRC staff has concluded that the information provided in the revised GGNS UFSAR is adequate to document the licensees intent to appropriately implement the BWRVIP ISP as the method for demonstrating the compliance of GGNS with the requirements of Appendix H to 10 CFR Part 50.
Based on the above discussion, the NRC staff finds that the information provided by Entergy was sufficient to conclude that the BWRVIP ISP, as approved in Reference 6, can be implemented for GGNS as the basis for demonstrating the facilitys continued compliance with the requirements of Appendix H to 10 CFR Part 50 and as part of the implementation and documentation, the licensee shall modify the GGNS UFSAR as proposed in Reference 1.
4.0 LIST OF REGULATORY COMMITMENTS The licensee, in Reference 1, included regulatory commitments. The commitments are listed in the following table.
List of Regulatory Commitment COMMITMENT TYPE SCHEDULED (Check one) COMPLETION DATE (If ONE-TIME CONTINUING Required)
ACTION COMPLIANCE Entergy will perform new fluence X 12/2006 calculations by December 2006. A neutron fluence calculation methodology which has been approved by the Nuclear Regulatory Commission staff and is consistent with the attributes identified in United States NRC Regulatory Guide 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence will be used for the determination of Reactor Pressure Vessel and surveillance capsule neutron fluence values.
Based on the results of this updated fluence analysis and the results/data available through the Boiling Water Reactor Vessel Internals Program for the reactor vessel surveillance capsule testing, the current pressure/temperature Limit Curves will be reevaluated for validity and new ones will be developed, if needed.
The NRC staff finds that reasonable controls for the implementation and for subsequent evaluation of proposed changes pertaining to the above regulatory commitments are best provided by the licensees administrative processes, including its commitment management program. The above regulatory commitments do not warrant the creation of regulatory requirements (items requiring prior NRC approval of subsequent changes).
5.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Mississippi State official was notified of the proposed issuance of the amendment. The State official had no comments.
6.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (68 FR 25653, published May 13, 2003). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
7.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
8.0 REFERENCES
- 1. William A. Eaton (Entergy) to NRC Document Control Desk, Grand Gulf Nuclear Station - Unit 1, Docket No.50-416, License Amendment Request, Change to the Reactor Vessel Material Surveillance Program" (LDC 2002-103), April 3, 2003.
- 2. C. Terry (BWRVIP) to NRC Document Control Desk, Project No. 704 - BWR Vessel and Internals Project, BWR Integrated Surveillance Program Plan (BWRVIP-78),
December 22, 1999.
- 3. C. Terry (BWRVIP) to NRC Document Control Desk, Project No. 704 - BWRVIP-86:
BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan, EPRI Technical Report 1000888, December 22, 2000.
- 4. C. Terry (BWRVIP) to NRC Document Control Desk, Project No. 704 - BWRVIP Response to NRC Request for Additional Information Regarding BWRVIP-78, December 15, 2000.
- 5. C. Terry (BWRVIP) to NRC Document Control Desk, Project No. 704 - BWRVIP Response to Second NRC Request for Additional Information on the BWR Integrated Surveillance Program, May 30, 2001.
- 6. W. H. Bateman (NRC) to C. Terry, Safety Evaluation Regarding EPRI Proprietary Reports BWR Vessel and Internals Project, BWR Integrated Surveillance Program Plan (BWRVIP-78) and BWRVIP-86: BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan, February 1, 2002.
Principal Contributors: J. Honcharik L. Lois Date: November 4, 2003
Grand Gulf Nuclear Station cc:
Executive Vice President Attorney General
& Chief Operating Officer Department of Justice Entergy Operations, Inc. State of Louisiana P. O. Box 31995 P. O. Box 94005 Jackson, MS 39286-1995 Baton Rouge, LA 70804-9005 Wise, Carter, Child & Caraway State Health Officer P. O. Box 651 State Board of Health Jackson, MS 39205 P. O. Box 1700 Jackson, MS 39205 Winston & Strawn 1400 L Street, N.W. - 12th Floor Office of the Governor Washington, DC 20005-3502 State of Mississippi Jackson, MS 39201 Chief Energy and Transportation Branch Attorney General Environmental Compliance and Asst. Attorney General Enforcement Division State of Mississippi Mississippi Department of Environmental P. O. Box 22947 Quality Jackson, MS 39225 P. O. Box 10385 Jackson, MS 39289-0385 Vice President, Operations Support Entergy Operations, Inc.
President P.O. Box 31995 Claiborne County Jackson, MS 39286-1995 Board of Supervisors P. O. Box 339 Director Port Gibson, MS 39150 Nuclear Safety Assurance Entergy Operations, Inc.
Regional Administrator, Region IV P. O. Box 756 U.S. Nuclear Regulatory Commission Port Gibson, MS 39150 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Senior Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 399 Port Gibson, MS 39150 General Manager, GGNS Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150