Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
BVY 14-069, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E - Supplement 221 October 2014Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E - Supplement 2Exemption Request
CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company18 February 2015Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company
ML0103204012 February 2001Request for Additional Information - Proposed Technical Specification Change No. 244Exemption Request
ML0217901752 July 2002Facsimile Transmission, Draft RAI Information to Be Discussed in a Conference Call
ML02200012919 July 2002RAI, Facsimile Transmission, Draft Request for Additional Information (RAI) to Be Discussed in a Conference Call
ML03139003921 May 2003Request for Additional Information, Arts/MelllaAnticipated operational occurrence
MELLLA
Fuel cladding
ML0330902511 December 2003Alternative Source Term Request for Additional Information
ML03332008920 January 2004Indian Point Nuclear Generating Units No. 2 and No. 3, Pilgrim Nuclear Power Station, Vermont Yankee Nuclear Power Station - Request for Additional Information Concerning Relief Request to Use ASME Code Case N-6
ML0400200632 January 2004Draft Request for Additional Information
ML0400501875 January 2004Draft Request for Additional Information
ML04015057115 January 2004Draft Request for Additional InformationMinimum Critical Power Ratio
ML04030008830 January 2004Draft Request for Additional Information
ML04048007717 February 2004Draft Request for Additional Information
ML04145002028 May 2004Vermont Yankee - Request for Additional Information - Extended Power UprateSafe Shutdown
Stroke time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Hardened vent
Turbine Missile
Flow Induced Vibration
GOTHIC
ML04169056916 June 2004Request for Additional Information Security Plan Sections 10-19
ML0417400396 July 2004Vermont Nuclear Power Station, Request for Additional Information, Extended Power Uprate. TAC No. MC0761Ultimate heat sink
Probabilistic Risk Assessment
Coatings
ML0419705319 July 2004Request for Additional Information Training and Qualification Plan
ML04210033723 July 2004RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan
ML0421903866 August 2004Draft Request for Additional Information
ML04222001223 July 2004RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan
ML0424405371 September 2004Vermont Yankee Nuclear Power Station, Request for Additional Information - Extended Power Uprate
ML0426102865 October 2004RAI Letter to Michael Kansler for the PRB to Make an Informed Decision 2.206 Petition on Spent Fuel Storage
ML04337004921 December 2004Vermont Yankee, Request for Additional Information, Extended Power Uprate,Anticipated operational occurrence
ML04357020930 June 2004E-mail Ennis, NRR, to Daflucas, Entergy, New RAI Questions, on Vermont Yankee EPUUltimate heat sink
Probabilistic Risk Assessment
Coatings
ML0435703427 December 2004Email Ennis, NRR, to Daflucas, Entergy, VY EPU Draft Rais, Round 5Anticipated operational occurrence
ML0436204424 January 2005Request for Additional Information, Relief Request RI-01
ML05011017416 February 2005RAI, Intermediate Range Monitor Surveillance Test FrequenciesSafe Shutdown
ML05011021019 January 2005RAI - Relief Request B-5
ML0504505896 May 2004E-mail RAI for Proposed QAPM, Rev. 9
ML05087051528 March 2005Draft Request for Additional InformationMoisture barrier
ML0509100161 April 2005Draft RAI, Proposed License Amendment Control Rod Operability, Scram Time Testing and Control Rod Accumulators
ML05096012614 April 2005Vermont Yankee RAI - Extended Power UprateAnticipated operational occurrence
ML05104024214 April 2005Draft Request for Additional InformationProbabilistic Risk Assessment
ML05110041813 May 2005Request for Information Revision to Updated Final Safety Analysis, Appendix F
ML05159016727 July 2005Vermont Yankee Nuclear Power Station, Request for Additional Information, Regarding Proposed License Amendment Extended Power UprateSafety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Safe Shutdown Earthquake
Finite Element Analysis
ML05223023210 August 2005E-mail Ennis, NRR, to Daflucas, Entergy Nuclear Northeast VY EPU RAIs
ML0524300187 September 2005Vermont Yankee Nuclear Power Station - Request for Additional InformationShutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
ML05326042725 November 2005Vermont Yankee Request for Additional Information - Extended Power UprateProbabilistic Risk Assessment
ML0615205061 June 2006Request for Additional Information Regarding Severe Accident Mitigation Alternatives for the Vermont Yankee Nuclear Power StationInternal Flooding
ML0615806407 June 2006Request for Additional Information for the Review of Vermont Yankee Nuclear Power Station License Renewal ApplicationAging Management
ML0616603289 June 2006Request for Additional Information Regarding Technical Specification Changes to Revise Control Rod Operability, Scram Time and Control Rod Accumulator Surveillance Testing (Tac No. MC5488)
ML06172021210 July 20062006/07/10-Vermont Yankee Nuclear Power Station, RAI, License Renewal ApplicationAging Management
Earthquake
ML06195002113 July 20062006/07/13-Request for Additional Information for the Review of Vermont Yankee Nuclear Power Station License Renewal ApplicationAging Management
ML06205022227 July 2006RAI, Relief Request ISI-13, Fourth 10-Year Inservice Inspection Interval
ML0621505531 August 20062006/08/01-RAI for the Review of Vermont Yankee Nuclear Power Station License Renewal ApplicationAging Management
ML0621505603 August 20062006/08/03-RAI for the Review of Vermont Yankee Nuclear Power Station License Renewal ApplicationAging Management
ML0621505613 August 20062006/08/03-RAI for the Review of Vermont Yankee Nuclear Power Station License Renewal Application
ML06227062015 August 20062006/08/15-RAI for the Review of Vermont Yankee Nuclear Power Station License Renewal Application (Sections 2.3.3.8 & 2.3.3.9)Fire Protection Program
ML06229043716 August 20062006/08/16-RAI for the Review of Vermont Yankee Nuclear Power Station License Renewal Application (Reactor Vessel Internals)Aging Management
Pressure Boundary Leakage
ML06234003516 August 20062006/08/16-RAI for the Review of Vermont Yankee Nuclear Power Station License Renewal ApplicationAging Management