Issue date | Title | Topic | |
---|---|---|---|
ML19317H189 | 31 July 1978 | In-Plant Source Term Measurements at Fort Calhoun Station- Unit 1. | Boric Acid Grab sample |
ML19326D718 | 31 January 1980 | Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Fort Calhoun Nuclear Power Plant. | |
ML20003H276 | 24 October 1980 | Primary Coolant Sys Pressure Isolation Valves,Fort Calhoun Unit 1, Technical Evaluation Rept | Hydrostatic |
ML20005C004 | 31 October 1981 | Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations.Fort Calhoun Station,Unit No. 1 Environmental Appraisal Report | Grab sample Biofouling |
ML20027E712 | 10 November 1982 | Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Fort Calhoun Station, Vols I & Ii,Technical Evaluation Rept | Boric Acid High Energy Line Break |
ML20038A769 | 31 October 1981 | Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations | Grab sample Biofouling |
ML20039A911 | 30 November 1981 | Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Nuclear Station Unit 1,informal Rept | |
ML20039B810 | 31 October 1981 | Evaluation of Emergency Response Facilities for Fort Calhoun Station - Unit 1. | Health Physics Network High winds Exclusive Use |
ML20040D165 | 16 December 1981 | Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Rept, Request for Addl Info | |
ML20042A233 | 28 February 1982 | Technical Evaluation Rept for Containment Purging & Venting During Normal Operation of Fort Calhoun Station. | |
ML20064L528 | 1 July 1982 | Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept | |
ML20070M853 | 31 March 1994 | Technical Evaluation Rept,Pump & Valve IST Program,Fort Calhoun Station Unit 1 | Boric Acid Incorporated by reference Cold shutdown justification Thermography |
ML20070Q521 | 31 December 1988 | Nuclear Power Plant Sys Sourcebook,Fort Calhoun | |
ML20071M450 | 29 November 1982 | Control of Heavy Loads (C-10),Omaha Public Power District, Fort Calhoun Station, Updated Draft Technical Evaluation Rept | Safe Shutdown Coatings Nondestructive Examination Control of Heavy Loads |
ML20076C326 | 5 October 1982 | ECCS Repts (F-47),TMI Action Plan Requirements,Fort Calhoun Station, Technical Evaluation Rept | |
ML20077K782 | 17 January 1983 | Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.2), Final Technical Evaluation Rept | |
ML20081E977 | 14 February 1991 | Review of Seismic Analysis for Generating In-Structure Spectra for Fort Calhoun Unit 1 Soil-Structure Interaction, Technical Evaluation Rept | |
ML20091L942 | 1 May 1984 | Revised Control of Heavy Loads (C-10),Fort Calhoun Station, Technical Evaluation Rept | Safe Shutdown Nondestructive Examination Control of Heavy Loads |
ML20092L857 | 30 June 1984 | Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Station, Technical Evaluation Rept | |
ML20099L374 | 30 November 1995 | Technical Evaluation Rept on Third 10-Yr Interval ISI Program Plan:Omaha Public Power District Fort Calhoun Station,Unit 1 | Hydrostatic VT-2 Incorporated by reference |
ML20100Q286 | 30 September 1991 | Auxiliary Feedwater Sys Risk-Based Insp Guide for Fort Calhoun Nuclear Power Plant | Probabilistic Risk Assessment Overspeed trip |
ML20106A936 | 30 September 1992 | Trip Rept:Onsite Analysis of Human Factors of Event at Fort Calhoun on 920703 (Loss of Instrument Inverter & Subsequent Loss of Coolant) | Shutdown Margin |
ML20113B458 | 8 March 1985 | In-Progress Audit of Detailed Control Room Design Review for Omaha Public Power District,Ft Calhoun Station | Emergency Lighting |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20126F254 | 26 August 1982 | Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 | |
ML20127A289 | 5 October 1982 | Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 | |
ML20127F270 | 28 September 1992 | Technical Evaluation Rept Fort Calhoun Station Emergency Diesel Generating Max Temp Operating Limits, Interim Rept | |
ML20134D794 | 13 June 1996 | Technical Evaluation Rept on Individual Plant Examination Front End Analysis | Safe Shutdown Mission time Internal Flooding Probabilistic Risk Assessment Severe Accident Management Guideline Fuel cladding |
ML20134D797 | 5 September 1996 | Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Final Rept | Internal Flooding Probabilistic Risk Assessment Severe Accident Management Guideline |
ML20134D803 | 31 May 1996 | Technical Evaluation Rept on Individual Plant Examination Back-End Analysis | Mission time Enforcement Discretion Finite Element Analysis Hardened vent Backfit |
ML20134N039 | 30 July 1985 | Feasibility of Detecting PWR Thermal Shield Support Degradation Using Ex-Core Neutron Noise, Informal Ltr Rept | Finite Element Analysis |
ML20138G890 | 28 August 1985 | Technical Evaluation of Dcrdr for Ft Calhoun Station | |
ML20205E371 | 31 July 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept | Safe Shutdown |
ML20206A023 | 30 April 1986 | Preliminary Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept | Safe Shutdown |
ML20206M286 | 31 March 1998 | Final Rept, Technical Evaluation Rept on 'Submittal-Only' Review of Individual Plant Exam of External Events at Fort Calhoun Station | Hot Short Safe Shutdown High winds Ultimate heat sink Fire Barrier Tornado Missile Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Tornado-Generated Missile Tornado Missile Protection Earthquake Failure to Scram |
ML20209C201 | 30 November 1986 | Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept | Safe Shutdown |
ML20210Q448 | 9 January 1987 | Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept | |
ML20214Q850 | 30 April 1987 | Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety Related Components:Fort Calhoun-1, Final Informal Rept | |
ML20214R743 | 31 March 1987 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 | |
ML20214R958 | 31 March 1987 | Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing Fort Calhoun, Informal Rept | Loop seal |
ML20244E190 | 31 July 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St Vrain | Safe Shutdown |
ML20245D144 | 6 January 1988 | Final Post-Implementation Audit Rept for Omaha Public Power District Fort Calhoun Station SPDS, Technical Evaluation Rept | |
ML20245D149 | 6 January 1988 | Technical Evaluation Rept of Dcrdr for Fort Calhoun Nuclear Station | |
ML20247J910 | 30 June 1989 | Rev 1 to Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Fort Calhoun | Loop seal Anticipated operational occurrence Safe Shutdown Earthquake Design basis earthquake |