Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000225/20050034 June 1985Insp Rept 50-458/85-18 on 850225-0503.Deviation Noted: Ranges of Display Instrumentation for HPCS Flow & RHR Svc Water Flow Contrary to Table 7.5-1 of Fsar,Amend 11, Dtd Jan 1984
IR 05000311/200401910 May 1985Insp Rept 50-458/85-22 on 850311-0419.No Violation or Deviation Noted.Major Areas Inspected:Maint Program,Test & Measurement Equipment,Surveillance Testing & Calibr Control Program,Design Changes & Mods & Document ControlTemporary Modification
Fire Watch
IR 05000311/20050171 August 1985Insp Rept 50-458/85-19 on 850311-0517.Violation Noted: Failure to Incorporate Engineering & Design Coordination Rept Info Into Drawings & Use External Historical Data in Evaluation of SuppliersSquib
Scaffolding
IR 05000311/200801023 January 1986Insp Rept 50-458/85-09 on 850311-0810.Violations Noted: Failure to Adequately Check Calculations,Document & Verify Assumptions & Provide Basis for Design InputSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
IR 05000401/200800917 September 1985Insp Rept 50-458/85-29 on 850401-0809.Violation Noted: Failure to Assure Conformance of safety-related Structural Steel Welds W/Requirements of Aws D1.1-75 Structural Steel Welding CodeLoctite
IR 05000415/200602715 August 1985Insp Rept 50-458/85-33 on 850415-0627.Violation Noted: Failure to Adequately Document Changes to Insp Rept Results
IR 05000458/197800522 September 1978Insp Rept 50-458/78-05 on 780905-08.No Noncompliance Noted. Major Areas Inspected:Previously Identified Unresolved Items & Const Deficiency Rept Re Nonconforming Rebar
IR 05000458/198200219 May 1982IE Insp Rept 50-458/82-02 on 820419-23.No Noncompliance Noted.Major Areas Inspected:Review of QA Program for Welding & Nondestructive Exam of safety-related Piping & Observation of Work for Subj Piping
IR 05000458/198200615 July 1982IE Insp Rept 50-458/82-06 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Previous Insp Findings,Qa Program Review & Work for Erection/Installation & Welding of safety-related Structural Steel & Supports
IR 05000458/19850273 June 1985Insp Rept 50-458/85-27 on 850401-04.No Violation or Deviation Noted.Major Areas Inspected:Implementation of Fire Protection Program & Compliance w/10CFR50,App R Re Safe Shutdown Per FSAR Commitments & SER EvaluationSafe Shutdown
Fire Barrier
Emergency Lighting
Fire Protection Program
Fire Watch
IR 05000458/19850325 August 1985Insp Rept 50-458/85-32 on 850624-28.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Program,Tmi Action Items & Emergency Preparedness ActivitiesLoop seal
Grab sample
IR 05000458/198503619 June 1985Insp Rept 50-458/85-36 on 850506-10.No Violation or Deviation Noted.Major Areas Inspected:Training,Organization, Coordination W/Offsite Groups,Emergency Procedures & Emergency Response Facilities & Equipment
IR 05000458/198503729 May 1985Insp Rept 50-458/85-37 on 850506-10.No Violation or Deviation Noted.Major Areas Inspected:Correction of Deficiencies Previously Identified Per 10CFR50.55(e)
IR 05000458/198503817 July 1985Insp Rept 50-458/85-38 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Test Witnessing,Preoperational Test Results Evaluation & TMI Action Items
IR 05000458/198503920 June 1985Insp Rept 50-458/85-39 on 850520-25.No Violation or Deviation Noted.Major Areas Inspected:Preoperational Test Performance & Results & Licensee Actions on Previous Insp Findings & 10CFR50.55(e) Items
IR 05000458/198504129 August 1985Insp Rept 50-458/85-41 on 850522-0712.No Violation or Deviation Noted.Major Areas Inspected:Followup on Previous Findings,Comparison of as-built Plant to FSAR Description, Verification of as-built Electrical Routing & TerminationsSafe Shutdown
Fire Barrier
Emergency Lighting
Fire Watch
IR 05000458/198504412 September 1985Insp Rept 50-458/85-44 on 850603-0726.No Violations or Deviations Identified.Major Areas Inspected:Open Significant Const Deficiencies Per 10CFR50.55(e) & Previous Insp FindingsScram Discharge Volume
Grace period
IR 05000458/198504517 July 1985Insp Rept 50-458/85-45 on 850520-0603.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & Site ToursTemporary Modification
IR 05000458/198504629 July 1985Insp Rept 50-458/85-46 on 850603-07.No Violations or Deviations Noted.Major Areas Inspected:Radwaste Mgt & Transportation Activities,Including Organization,Audits & Process Control PlanProcess Control Program
IR 05000458/198504719 July 1985Insp Rept 50-458/85-47 on 850610-14.No Violations or Deviations Noted.Major Areas Inspected:Chemistry/ Radiochemistry Program,Including Organization,Staffing,Staff Qualifications,Facilities & Equipment & QA Program
IR 05000458/19850489 August 1985Insp Rept 50-458/85-48 on 850624-28.No Violations or Deviations Identified.Major Areas Inspected:Preoperational Test Results Evaluation & Operating Procedures
IR 05000458/198505028 August 1985Insp Rept 50-458/85-50 on 850624-29.No Violation or Deviation Noted.Major Areas Inspected:Alarm Stations, Security Sys Power Supply,Access control-personnel & Access control-packages.Details Withheld (Ref 10CFR73.21)
IR 05000458/198505223 August 1985Insp Rept 50-458/85-52 on 850708-12.No Violation or Deviation Noted.Major Areas Inspected:Emergency & Abnormal Operating Procedures,Ie Bulletin & post-TMI Action Plan Requirements Followup & Corrective Actions TakenFuel cladding
IR 05000458/19850534 September 1985Insp Rept 50-458/85-53 on 850805-09.No Violation or Deviation Noted.Major Areas Inspected:Radiation Protection Training,Selected TMI Action Items,Chemistry Sample Stations,Radwaste Processing Sys & Environ ProgramGrab sample
Process Control Program
IR 05000458/19850544 October 1985Insp Rept 50-458/85-54 on 850722-26 & 31-0802.No Violation or Deviation Noted.Major Areas Inspected: Preoperational Test Results Evaluation & IE Bulletin Followup
IR 05000458/198505513 September 1985Insp Rept 50-458/85-55 on 850715-19 & 29-0801.No Violation or Deviation Noted.Major Areas Inspected:Mgt Effectiveness, Security Organization,Records & Repts & Lock & Key Controls. Details Withheld (Ref 10CFR73.21)
IR 05000458/198505630 August 1985Special Insp Rept 50-458/85-56 on 850715-17.No Violations or Deviations Noted.Major Areas Inspected:Followup in Findings from Emergency Appraisal & 1985 Emergency ExerciseSiren
IR 05000458/198505724 August 1985Insp Rept 50-458/85-57 on 850722-26.No Violation or Deviation Noted.Major Areas Inspected:Training Program, Chemistry/Radiochemistry Program,Facilities & Equipment & Administrative & Analytical Procedures
IR 05000458/198505823 August 1985Insp Rept 50-458/85-58 on 850722-26.No Violation or Deviation Noted.Major Areas Inspected:Tech Specs & Implementing Procedures
IR 05000458/198505917 October 1985Insp Rept 50-458/85-59 on 850819-23.Violation Noted: Improper Disposition of Nonconformance Repts Re Test Procedure CriteriaFitness for Duty
IR 05000458/19850609 October 1985Insp Rept 50-458/85-60 on 850909-13.No Violation or Deviation Noted.Major Areas Inspected:Deficiency Repts,Tmi Action Items & Fuel Load WitnessingShutdown Margin
IR 05000458/198506115 October 1985Insp Rept 50-458/85-61 on 850823-25.No Violations or Deviations Noted.Major Areas Inspected:Allegations of Improprieties on Part of Certain Licensee Contractor &/Or Subcontractor PersonnelLiquid penetrant
IR 05000458/198506324 October 1985Insp Rept 50-458/85-63 on 850923-27.No Violation or Deviation Noted.Major Areas Inspected:Followup of Various Open Items & License ConditionsShutdown Margin
IR 05000458/198506416 October 1985Insp Rept 50-458/85-64 on 850916-20.No Violation or Deviation Noted.Major Areas Inspected:Radwaste Mgt Controls, Training & Qualifications,Radwaste Startup & Liquid & Gaseous Waste Sys
IR 05000458/198506521 October 1985Insp Rept 50-458/85-65 on 850916-20.No Violation or Deviation Noted.Major Areas Inspected:Radiological Environ Monitoring Program,Including Organization & Mgt Controls, Meteorological Monitoring Program & QA ProgramGrab sample
Offsite Dose Calculation Manual
IR 05000458/19850681 November 1985Insp Rept 50-458/85-68 on 850930-1003.No Violation or Deviation Noted.Major Areas Inspected:Quality Concerns Program,Asme Certification Program & Followup on Previous Insp FindingsFitness for Duty
Hydrostatic
IR 05000458/198507021 October 1985Insp Rept 50-458/85-70 on 851002-03.No Violation or Deviation Noted.Major Areas Inspected:Licensee Actions to Resolve OL Precriticality Conditions,Including Plant Air Flow Characteristics
IR 05000458/19850722 December 1985Insp Rept 50-458/85-72 on 851009-11.No Violation or Deviation Noted.Major Areas Inspected:Emergency Procedures Appraisal Findings Identified in Insp Rept 50-458/84-34
IR 05000458/198507910 January 1986Insp Rept 50-458/85-79 on 851202-06.No Violation or Deviation Noted.Major Areas Inspected:Startup Test Procedure Review (Turbine Trip) & Startup Test Witnessing
IR 05000458/19850829 January 1986Insp Rept 50-458/85-82 on 851216-20.Violation Noted: Electronic Calibr on Primary Containment Area Radiation Monitor Only Included Every Other Decade Range Between 0 & 100% Full Scale
IR 05000458/198601229 May 1986Insp Repts 50-458/86-12 & 50-458/86-18 Cancelled
IR 05000458/198601723 May 1986Partially Withheld Insp Rept 50-458/86-17 on 860331-0404 & 0502 (Ref 10CFR73.21).Violations Noted Re Vital Area Physical Barriers & Personnel Access Control
IR 05000458/19860219 June 1986Insp Rept 50-458/86-21 on 860512-16.No Violation or Deviation Noted.Major Areas Inspected:Licensed Operator Training & Nonlicensed Staff Training
IR 05000458/198602319 August 1986Insp Rept 50-458/86-23 on 860615-0731.No Violations or Deviations Noted.Major Areas Inspected:Evaluation of Startup Test Results,Operational Safety Verification,Safety Sys Walkdown,Maint Witnessing & Surveillance Witnessing
IR 05000458/198602421 October 1986Insp Rept 50-458/86-24 on 860818-22.Deviation Noted:Failure to Verify Certain Abnormal Operating Procedures
IR 05000458/19860258 August 1986Insp Rept 50-458/86-25 on 860721-25.Violation Noted:Failure to Follow Procedures.Deficiencies Noted Re Dose Assessment Training & Equipment
IR 05000458/198602619 December 1986Insp Rept 50-458/86-26 Canceled
IR 05000458/198602716 October 1986Insp Rept 50-458/86-27 on 860801-0915.Violations Noted: Failure to Meet Electrical Spec Requirements & Failure to Follow Surveillance Test ProcedureSafe Shutdown
Half scram
Ultimate heat sink
Coast down
IR 05000458/19860281 October 1986Insp Rept 50-458/86-28 on 860825-29.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Organization & Mgt Controls,Alara Program, Training & Qualifications
IR 05000458/198602931 October 1986Partially Withheld Insp Rept 50-458/86-29 on 860825-28 (Ref 10CFR73.21).Violation Noted:Inadequate Safeguards Contingency Plan ImplementationSafeguards Contingency Plan