BSEP 05-0018, Occupational Radiation Exposure Report for 2004 | 20 April 2005 | Occupational Radiation Exposure Report for 2004 | |
BSEP 05-0110, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | 31 August 2005 | Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | |
BSEP 05-0137, Core Operating Limits Report, Revision 2, Cycle 15 | 14 November 2005 | Core Operating Limits Report, Revision 2, Cycle 15 | Anticipated operational occurrence |
BSEP 06-0075, Groundwater Questionnaire | 28 July 2006 | Groundwater Questionnaire | Offsite Dose Calculation Manual |
BSEP 06-0095, Report of 10 CFR 50.59 Evaluation and Commitment Changes | 24 August 2006 | Report of 10 CFR 50.59 Evaluation and Commitment Changes | Offsite Dose Calculation Manual Excess Flow Check Valve Fire Watch Power change |
BSEP 08-0121, Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors | 24 September 2008 | Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors | |
BSEP 09-0022, Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation | 23 February 2009 | Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation | |
BSEP 10-0097, Report of 10 CFR 50.59 Evaluations and Commitment Changes | 18 August 2010 | Report of 10 CFR 50.59 Evaluations and Commitment Changes | Shutdown Margin Temporary Modification |
BSEP 11-0038, Renewed Facility Operating License and Cycle 20 Core Operating Limits Report | 8 April 2011 | Renewed Facility Operating License and Cycle 20 Core Operating Limits Report | Safety Limit Minimum Critical Power Ratio |
BSEP 12-0127, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident | 27 November 2012 | Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident | Safe Shutdown Unanalyzed Condition High Radiation Area Ultimate heat sink Probabilistic Risk Assessment Operating Basis Earthquake Fukushima Dai-Ichi Design basis earthquake Scram Discharge Volume Earthquake Scaffolding Seismic Walkdown Report |
BSEP 12-0128, Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation | 14 November 2012 | Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation | |
BSEP 13-0030, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Safe Shutdown High winds Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action FLEX Design basis earthquake Spent Fuel Pool Instrumentation Coast down |
BSEP 14-0007, 1707-01-F03, Rev. 3, Operability Assessment (CR2013-8241) | 8 September 2011 | 1707-01-F03, Rev. 3, Operability Assessment (CR#2013-8241) | Operability Assessment |
BSEP 14-0093, Report of 10 CFR 50.59 Evaluations and Commitment Changes | 14 August 2014 | Report of 10 CFR 50.59 Evaluations and Commitment Changes | Aging Management License Renewal Commercial Grade Control of Heavy Loads Through-Wall Leak |
BSEP 14-0101, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | 4 September 2014 | Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | |
BSEP 14-0131, Expedited Seismic Evaluation Process Report in Response to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident | 18 December 2014 | Expedited Seismic Evaluation Process Report in Response to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident | High Radiation Area Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Earthquake Power-Operated Valves Power Operated Valves |
BSEP 15-0004, Enclosure 3 - Areva Operability Assessment. (CR 2014-7395) | 13 January 2015 | Enclosure 3 - Areva Operability Assessment. (CR #2014-7395) | Safety Limit Minimum Critical Power Ratio Operability Assessment |
BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D | 11 April 2018 | Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D | Weld Overlay Dissimilar Metal Weld |
ML031700027 | 6 June 2003 | Submittal of 10-O Report | Boric Acid Power Uprate |
ML031890936 | 10 July 2003 | Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Brunswick, Crys | Enforcement Discretion |
ML032471632 | 22 August 2003 | Submittal of 10-Q Report | Boric Acid |
ML041460246 | 19 May 2004 | Q Report for Period Ending 03/31/2004 | |
ML043430133 | 30 November 2004 | Submital of 10-Q Report | |
ML051590333 | 31 May 2005 | Submittal of 10-Q Report | License Renewal Exemption Request |
ML053530069 | 9 May 2005 | Operational Safety Review Team (Osart) Mission to Brunswick Nuclear Plant 9-25 May 2005 | Safe Shutdown Fitness for Duty Fire Barrier Water Inventory Control Coatings Temporary Modification Aging Management Foreign Material Exclusion Flow Accelerated Corrosion Large early release frequency Stress corrosion cracking Severe Accident Management Guideline License Renewal Earthquake Fire Watch Power change Siren Power Uprate Thermography |
ML061440487 | 18 May 2006 | Submittal of 10-O Report for Quarterly Period Ending March 31, 2006 | |
ML071100006 | 8 December 2006 | Operational Safety Review Team (Osart) Mission and Follow-up Visit Report | Safe Shutdown Fitness for Duty Fire Barrier Water Inventory Control Coatings Temporary Modification Aging Management Foreign Material Exclusion Flow Accelerated Corrosion Large early release frequency Stress corrosion cracking Severe Accident Management Guideline License Renewal Earthquake Fire Watch Power change Siren Power Uprate Thermography |
ML101270439 | 5 May 2010 | Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants | |
ML101930417 | 6 May 2010 | Tritium Database Report | Offsite Dose Calculation Manual Hydrostatic |
ML101930553 | 14 December 2009 | NEI 07-07 NEI Groundwater Protection Initiative NEI Peer Assessment Report for Brunswick | |
ML110871250 | 24 March 2011 | BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages | Weld Overlay VT-2 Earthquake EVT-1 Dissimilar Metal Weld DM weld |
ML112700069 | 26 September 2011 | Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants | Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Channel-control blade interference Scram Discharge Volume Earthquake |
ML13277A041 | 19 September 2013 | Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition | Safe Shutdown High winds Ultimate heat sink Non-Destructive Examination Mission time Fire Barrier Time to boil Safe Shutdown Earthquake Enforcement Discretion Probabilistic Risk Assessment Fire impairment Operator Manual Action Multiple Spurious Operation Emergency Lighting Significance Determination Process Scram Discharge Volume Large early release frequency Exemption Request Fire Protection Program Fire Watch Very Early Warning Fire Detection |
ML14297A266 | 24 October 2014 | Record of Review, Brunswick Steam Electric Plant, Units 1 and 2, LAR Attachment U- Table U-1 Internal Events PRA Peer Review- Facts and Observations (F&Os), 10/24/14 | GOTHIC |
ML16041A435 | 1 March 2016 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force | Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
ML16223A725 | 17 August 2016 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Events) CAC Nos. MF4467 and MF4468) | FLEX Fukushima Dai-Ichi Earthquake Hardened vent |
ML17024A036 | 31 December 2016 | Operating Data Report for 2016 | Temporary Modification Biofouling Power change Coast down |
ML19204A162 | 18 November 1998 | Enclosure 1 - Staff Evaluation Report of Individual Plant Examination of External Events (IPEEE) Submittal on Brunswick Steam Electric Plant (Bsep), Units 1 and 2 | |
RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 | 30 May 2019 | Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 | |
RA-19-0479, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies | 31 December 2019 | Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies | Anticipated operational occurrence Affidavit |
RA-20-0353, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1) | 24 February 2021 | Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1) | Fitness for Duty Ultimate heat sink Non-Destructive Examination Safe Shutdown Earthquake Coatings Operating Basis Earthquake Finite Element Analysis Foreign Material Exclusion Exemption Request Affidavit |
RA-21-0198, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 25 | 21 June 2021 | Inservice Inspection Program Owner'S Activity Report for Refueling Outage 25 | |
RA-22-0165, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 | 9 June 2022 | Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 | |