Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission18 April 1997Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & CommissionSafe Shutdown
Fitness for Duty
Packing leak
High Radiation Area
Ultimate heat sink
Fire Barrier
Contraband
Emergency Lighting
Battery sizing
Deep Dose Equivalent
Fire Protection Program
Fire Watch
Scaffolding
IR 05000454/198303827 January 1984Identifies Addl Insp Repts 50-454/83-38 & 50-455/83-28 Re Reinsp Program,Per 840120 Memo
IR 05000455/198502710 June 1986Reviews Const Appraisal Team Insp 50-455/85-27.Analyses of Violations & Corrective Actions Encl.Regional Based Insps to Resolve Issues Should Be Scheduled
ML20054H13917 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H41218 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054J81511 June 1982Releases Public Version of Revised Facility Annex to Generating Station Emergency Plan
ML20054M3306 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedure
ML20055C0519 August 1982Forwards B Von Zellen .Nrc Already RepliedOverexposure
Affidavit
ML20057C98027 September 1993Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months
ML20058J1656 August 1982Informs That Time for Commission to Review ALAB-678 Expired. Commission Declined Review.Decision Became Final Agency Action on 820805
ML20059A46520 October 1993Notification of Significant Licensee Meeting W/Util in Glen Ellyn,Il on 931104 to Review Status of Util Initiatives on QA & Corporate Engineering Support
ML20062B44122 July 1982Notification of 820727 Meeting W/Westinghouse in Bethesda, MD to Discuss Krsko Water Hammer Event of Jul 1981 & Applicability to Domestic Westinghouse Type D Steam Generators
ML20062J45027 October 1993Requests Addl Info Re Proposed EAL Changes in Util Generating Station Emergency Plan Annexes.Proposed EALs Reviewed Against Guidance in NUMARC/NESP-007,rev 2, Methodology for Development of Eals
ML20125D0505 December 1992Informs That Licensee Response to GL 90-06, Resolution of Generic Issue 70, 'Power-Operated Relief Valve & Block Valve Reliability' & GI 94, 'Addl Low-Temp Overpressure Protection for Lwrs,' Per 10CFR50.54(F), AcceptableBackfit
ML20127F30618 June 1985Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action NeededHigh Radiation Area
ML20133C65730 July 1985Provides Results of Initial Review of Survey of Licensee Responses to Steam Binding in Auxiliary Feedwater Sys.Issue Addressed in IE Info Notices & INPO Significant Event Repts & Significant Operating Experience Repts
ML20133G6136 August 1985Notification of 850815 Meeting W/Bnl,Westinghouse & Util in Bethesda,Md to Review Limiting Conditions for Operations Relaxation Program
ML20133J48215 January 1997Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule
ML20133J58115 January 1997Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1
ML20134B50613 April 1994Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted
ML20134P01330 August 1985Advises That Region III Will Accept TAC 57077 Re Relocation of Control of Nuclear Instrumentation Sys,But Declines TAC 57076 Re Iodine/Particulate Sampling,Per 850726 Request for Assistance in Conducting Safety Evaluations
ML20135B4813 December 1996Forwards Info Re Eddy Current Indications Located on cold-leg Side of Plant SG Tubes
ML20135C4765 December 1996Forwards Request for Addl Info Re Application to Amend Licenses Extending Steam Generator Replacement for Byron Unit 1 and Braidwood Unit 1
ML20135D1244 December 1996Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960930-1014Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Post Accident Monitoring
Locked High Radiation Area
Missed surveillance
Job Performance Measure
Grace period
Power change
Downpower
ML20135D8865 December 1996Notification of 961219 Meeting W/Util in Rockville,Md to Discuss Licensee Proposal of 961018 & to Delete Plant,Unit 1 mid-cycle SG Insp
ML20136E62219 November 1996Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed
ML20136J29514 November 1985Forwards Assessment of LERs to Be Used as Input to SALP Evaluation.Lers Found to Be of Acceptable Quality Compared to Other Units.Large Number of Personnel Involved in LER Preparation Has Kept Plant from Obtaining Higher ScoresSystematic Assessment of Licensee Performance
ML20137P52521 November 1985Notification of 851203 Meeting W/Util,Bnl & Westinghouse in Bethesda,Md to Discuss Results of Review of Facility Limiting Condition for Operation Relaxation Program
ML20137Y6935 December 1985Discusses Efforts Concerning Plant Core Melt Frequency estimate.PRA-type Study Indicates Plant Core Melt Frequency Presently Approx 1.2x10-3/yr.Recommendation Re Restart Will Be Made Prior to 851211
ML20137Z2074 December 1985Notification of 851206 Meeting W/Util & Westinghouse in Bethesda,Md to Discuss Probability of Facility Reactor Coolant Pump Seal Location
ML20138D27828 April 1997Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage
ML20138G42110 December 1985Advises That NRC Has No Objection to Plant Resuming Power Operation,Based on Discussion at 851203 & 06 Meetings & Util Re Essential Svc Water Sys.Need for Tech Spec Under Review
ML20138J7675 February 1997Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register PersonnelGeneric Fundamentals Examination
ML20138R16618 December 1985Forwards Results of Survey Conducted to Determine Other Plants W/Similar Svc Water Sys.Byron Sys Has Only Two Pumps & Main Contributor to High Melt Frequency.No Other Westinghouse Plants Had Problem.Info Notice Will Be Issued
ML20141E71124 December 1985Forwards,For Review,Draft Info Notice Re Generic Implications of Estimated Core Melt Frequency.To Reduce Estimated Frequency for Unit 1,licensee Committed to Having One Unit 2 Svc Water Pump Available
ML20141F27414 February 1986Forwards Summary of Review Costs Incurred by Various Program Ofcs Re Review of OL Application for 841223-850622
ML20147J2399 April 1997Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations
ML20149F2733 July 1997Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data
ML20149L19022 July 1997Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled
ML20149L77214 November 1996Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Methodology & Database Proposed by Comed to Determine Length of Operating Cycle Between SG Tube Eddy Current Insps for Plants,Unit 1
ML20149M69019 January 1997Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel
ML20151H33418 March 1983Forwards Revised Position Accepting Use of Exit Core Thermocouples as Alternative to Use of Hot Leg Temp Resistance Temp Detectors.Use of Thermocouples Will Comply w/10CFR50,App R
ML20151H40722 April 1983Releases Public Version of Rev to Emergency Plan Implementing Procedures
ML20151H4874 May 1983Board Notification 83-057:forwards Differing Prof Opinions Re Sys Interaction & Safety Classification.Info Relates to Board Notifications 83-17 & 83-44 Re Unresolved Safety Issue A-17Probabilistic Risk Assessment
ML20151V2952 September 1998Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE
ML20151Z85022 August 1988Forwards DRP Section 1A Master Activities Plans for Aug 1988 to Jan 1989,including Insps,Security & Radiation Control
ML20153E91816 November 1987Forwards Oct 1987 Significant Intergovernmental Activities & Issues Rept.Rept Represents Combined Efforts of NRC Regional State Liaison Officers,State,Local & Indian Tribes Programs Staff & Regional State Agreement RepresentativesSafe Shutdown
Fitness for Duty
Chernobyl
ML20154A28313 December 1986Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985Liquid penetrant
ML20154H9935 March 1986Forwards Updated Plant Licensing Status for Perry 1, Clinton 1,Braidwood 1 & Byron 2 as of 860228Nondestructive Examination
Earthquake
Fire Protection Program
Affidavit
ML20154J1713 March 1986Discusses Review of Licensee Describing Sys to Mitigate Effects of High Energy Line Breaks in Steam Generator Blowdown Sys & Auxiliary Steam Sys.Possibility of Including Branch in Review RequestedBoric Acid