Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML003727966 | 30 June 2000 | Order Approving the Transfer of Renewed Facility Operating Licenses for Calvert Cliffs Nuclear Power Plant and the Materials License for Independent Spent Fuel Storage Installation from Baltimore Gas and Electric Company, and Conforming Ame | |
ML012400449 | 1 March 2002 | Amendment Steam Generator Replacement (Tac Nos. MB0951 and MB0952) | |
ML020090620 | 13 February 2002 | Amendment One-Time Extension of the Unit 2 Control Room Emergency Ventilation System Technical Specification (Tac No. MB3445) | Large early release frequency |
ML020330002 | 26 February 2002 | Amendments 248 & 224, Respectively, Regarding Reanalysis of Loss of Feedwater Event | |
ML020330092 | 4 March 2002 | Amendment Re CREVS and Crets Operability During Fuel Movement (TAC Nos. MB2538 and MB2539) | |
ML020790273 | 8 April 2002 | Amendments 251 & 228 Implementation of Zirlo Clad Fuel Rods (Tac Nos. MB2540 and MB2541) | |
ML020920286 | 4 April 2002 | Emergency Amendment 227 One-Time Extension of the Unit 2 Control Room Emergency Ventilation System Technical Specification | Large early release frequency |
ML020940153 | 22 May 2002 | Calvert Cliff, Units 1, Amendment 253 & Unit 2, Amendment 229. Amendments Revise Surveillance Requirements (SR) 3.0.3 to Extend Delay Period Before Entering Limiting Condition for Operation Following Missed Surveillance. Safety Evaluation, | Enforcement Discretion Probabilistic Risk Assessment Missed surveillance Large early release frequency |
ML021080753 | 1 May 2002 | License Amendment, Allowing a One-Time Extension of Appendix J, Type a Integrated Leak Rate Test Interval and Exception from Performing a Post-Modification Type a Test | Non-Destructive Examination Probabilistic Risk Assessment Coatings Large early release frequency Moisture barrier Through-Wall Leak |
ML021560605 | 6 August 2002 | License Amendment, Correction of Administrative Errors (TAC Nos. MB3928 and MB3931) | |
ML023530642 | 19 December 2002 | Calvert Cliff, Unit Nos. 1 & 2, License Amendments 225 & 232 Safety Injection Tank Surveillance Frequency | Boric Acid Probabilistic Risk Assessment Large early release frequency |
ML030560015 | 25 February 2003 | Units, 1 and 2, Licensing Amendments 256 & 233 Shutdown Cooling | |
ML030650403 | 7 April 2003 | Issuance of Amendment Nos. 257 & 234, Respectively, Revising TS 3.7.11 to Limit the Types of Fuel Assemblies to Which It Applies | Anticipated operational occurrence Recently irradiated fuel |
ML031040504 | 14 April 2003 | Amendments 258 & 235 to Licenses DPR-53 & DPR-69, Respectively. Amendments Permit Operation of Calvert Cliffs Unit 2 with Core of Up to Eight Lead Fuel Assemblies...(Tac Nos. MB5646, MB5647, and MB6064) | Fuel cladding |
ML031320507 | 3 December 2003 | License Amendments, Remove Charging Pumps from Emergency Core Cooling System Technical Specification (TS) 3.5.2, ECCS - Operating | |
ML031330142 | 16 July 2003 | Issuance of Amendment Nos. 259 and 236, Revising the TS Administrative Controls Section to Incorporate Six Changes Previously Approved for the Improved Standard Technical Specifications | Time of Discovery High Radiation Area Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program |
ML032930365 | 9 December 2003 | License Amendment, Issuance of Amendment, Request Pertaining to Revisions of Cooldown Rates for Reactor Pressure Vessel Temperature Limits | Hydrostatic |
ML040350467 | 2 March 2004 | License Amendments 262 & 239, Revise Technical Specifications by Eliminating Requirements for Hydrogen Recombiners and Hydrogen Monitors. | Probabilistic Risk Assessment Fuel cladding |
ML040640795 | 5 April 2004 | License Amendment, Revise the Implementation Date for Cooldown Rates for Pressure-Temperature Limits | |
ML040720077 | 8 April 2004 | License Amendment, Issuance of Amendment, Change to the Testing Requirements for Containment Spray Nozzles | Boric Acid Foreign Material Exclusion |
ML040760287 | 6 May 2004 | License Amendment, Change Technical Specification to Modify Requirements Applicable When Action Requires No Positive Reactivity Additions | Boric Acid Shutdown Margin Anticipated operational occurrence |
ML040980651 | 13 April 2004 | License Amendment, Extend Diesel Generator Required Action Time | Safe Shutdown Probabilistic Risk Assessment Seismically rugged Large early release frequency |
ML041040129 | 3 June 2004 | License Amendment Re Amendment to Increase the Spent Fuel Pool Maximum Enrichment Limit | Time to boil Fuel cladding |
ML042530436 | 13 September 2004 | Issuance of License Amendments Revision to the Refueling Operations Section of the Technical Specifications | |
ML042540009 | 15 September 2004 | License Amendment, Elimination of Post-Accident Sampling System (PASS) Sampling Requirements | Grab sample |
ML043120012 | 28 October 2004 | Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat (Dbt)... | |
ML050140262 | 27 January 2005 | License Amendment 246 Regarding Increasing Spent Fuel Pool Maximum Enrichment Limit | Time to boil |
ML050270301 | 10 February 2005 | License Amendment, Increase of Lift Setpoint of First Bank of Main Stream Safety Valves and Increase in Completion Time to Reset the Power Level-High Trip Setpoint | Anticipated operational occurrence |
ML050350208 | 3 February 2005 | Correction to Amendment No. 246 | |
ML050550010 | 24 February 2005 | License Amendment Nos. 271 and 248 Incorporating Core Operating Limits Analytical Methodology References Into Technical Specifications | Anticipated operational occurrence Coatings |
ML051240084 | 9 May 2005 | License Amendment, Eliminate Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports | |
ML051390039 | 15 June 2005 | License Amendments 273 and 250 License Condition 2.E, Fire Protection | Safe Shutdown Fire Protection Program Backfit |
ML051590004 | 5 July 2005 | License Amendments 274 and 251 Regarding Change to Technical Specifications Related to the Removal of Hydrogen Control from the Design Basis | Anticipated operational occurrence |
ML052630123 | 26 September 2005 | License Amendments 275 and 252, Reactor Trip Circuit Breaker Surveillance Frequency Extension | Anticipated operational occurrence Probabilistic Risk Assessment Large early release frequency |
ML053070313 | 2 December 2005 | Issuance of Amendments Increased Flexibility in Mode Restraints | Safe Shutdown Probabilistic Risk Assessment Missed surveillance Significance Determination Process Large early release frequency Power change |
ML053460269 | 19 January 2006 | Amendment Shutdown Margin and Operations Involving Positive Reactivity Additions (TAC Nos. MC7328 and MC7329) | Boric Acid Shutdown Margin Anticipated operational occurrence |
ML060460089 | 9 March 2006 | Amendment Steam Generator Tube Integrity | |
ML062350447 | 21 September 2006 | Amendment Deletion of Term Core Alterations (TAC Nos. MC7330 and Mc 7331) | Shutdown Margin Anticipated operational occurrence Recently irradiated fuel |
ML062770207 | 16 November 2006 | Amendments Use of Lead Fuel Assemblies (TAC Nos. MD0243 and MD0244) | Anticipated operational occurrence Fuel cladding |
ML071920312 | 11 July 2007 | Revised Pages of Facility Operating License Nos. DPR-53 and DPR-69 | Safe Shutdown Fire Protection Program |
ML072130521 | 29 August 2007 | Amendment Implementation of Alternative Radiological Source Term (TAC Nos. MC8845 and MC8846) | Stroke time VT-2 Fuel cladding |
ML072560272 | 27 September 2007 | Amendment Implementation of LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process | High winds Fire Barrier Internal Flooding Probabilistic Risk Assessment Large early release frequency Turbine Missile |
ML073200455 | 20 December 2007 | License Amendment, Amendment Use of Lead Fuel Assemblies & Change to Core Operating Limits Report Analytical Methods (TAC Nos. MD4646, MD4647, MD4648, & MD4649) | |
ML080530381 | 24 March 2008 | Units, 1 and 2 - Amendments 285 and 262 Addition of Limiting Condition of Operation 3.0.8 for Inoperable Snubbers | Safe Shutdown Earthquake Probabilistic Risk Assessment Large early release frequency Earthquake |
ML080840339 | 23 April 2008 | License Amendments 286 and 263 Modification of Technical Specification Definitions | |
ML082180478 | 27 August 2008 | Amendment No. 288 Long-Term Coupon Surveillance Program | |
ML083180198 | 26 January 2009 | Amendment Application for Technical Specification Change TSTF-491, Removal of the Main Steam and Main Feedwater Valve Isolation Time from Technical Specifications Using Consolidated Line Item | |
ML090150508 | 4 March 2009 | Amendment Replacement of the Trisodium Phosphate Buffer with a Sodium Tetraborate Buffer | |
ML091820366 | 22 July 2009 | Amendment Regarding Measurement Uncertainty Recapture Power Uprate | Safe Shutdown Anticipated operational occurrence Hydrostatic Coatings Operator Manual Action Aging Management Abnormal operational transient Earthquake Turbine Missile Fuel cladding Fire Protection Program Power change Flow Induced Vibration |
ML092100566 | 6 August 2009 | Amendment Implementation of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 (TAC Nos. ME1129 & ME1130) |