Letter Sequence Other |
---|
|
|
MONTHYEARML0303501622003-02-0404 February 2003 Biweekly Notice Memo, Notice of Consideration/Issuance of Amendments to Revise Technical Specification 3.5.2, Emergency Core Cooling System - Operating, by Removing Note Modifying Limiting Condition for Operation Project stage: Other ML0321100162003-08-0808 August 2003 Request for Additional Information, Technical Specification Change to Remove the Charging Pump from the Technical Specifications Project stage: RAI ML0327401272003-09-25025 September 2003 Response to RAI on the Technical Specification Change to Remove the Charging Pumps from the Technical Specifications Project stage: Response to RAI ML0313205072003-12-0303 December 2003 License Amendments, Remove Charging Pumps from Emergency Core Cooling System Technical Specification (TS) 3.5.2, ECCS - Operating Project stage: Other ML0715901812003-12-0303 December 2003 Technical Specifications, Remove Charging Pumps from Emergency Core Cooling System Technical Specification (TS) 3.5.2, ECCS - Operating Project stage: Other ML0334201592003-12-0303 December 2003 Technical Specification, Remove Charging Pumps from Emergency Core Cooling System Technical Specification (TS) 3.5.2, ECCS - Operating Project stage: Other 2003-02-04
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 2024-09-06
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23086C0672023-04-24024 April 2023 Issuance of Amendment Nos. 345 and 323 Deletion of License Conditions Related to Decommissioning Trust ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22066B3112022-03-31031 March 2022 Correction of License Amendment Nos. 334 and 312 to Revise Instrument Testing and Calibration Definitions ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML21347A8642022-01-13013 January 2022 Issuance of Amendment Nos. 342 and 320 Modifying the Licensing Basis to Allow for Full Core Offload with No Shutdown Cooling Loop Available During Certain Refueling Outages ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21299A0052021-12-14014 December 2021 Issuance of Amendments No. 340 and 318 Adoption of Technical Specifications Task Force Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20363A2422021-01-26026 January 2021 Issuance of Amendment Nos. 339 and 317 Regarding Accident Tolerant Fuel Lead Test Assemblies (EPID L-2019-LLA-0282) - (Non-Proprietary) ML20273A0882020-11-0909 November 2020 Issuance of Amendment Nos. 338 and 316 Revise Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20182A1942020-08-13013 August 2020 Issuance of Amendment Nos. 336 and 314 Concerning Reactor Coolant Pump Flywheel Inspection Program ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19337D0352020-02-28028 February 2020 Issuance of Amendment Nos. 333 and 311 Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications ML19330D9092020-02-28028 February 2020 Issuance of Amendment Nos. 332 and 310 Risk-Informed Categorization and Treatment of Systems, Structures, and Components ML19352F1242019-12-23023 December 2019 Correction of License Amendment Nos. 327 and 305 for the Elimination of the Nuclear Advisory Committee Requirements ML19204A0632019-09-13013 September 2019 Independent Spent Fuel Storage Installation, James A. FitzPatrick, and Nine Mile Point - Issuance of Amendments to Revise the Emergency Response Organization Staff ML19165A2472019-08-26026 August 2019 Issuance of Amendment Nos 330 and 308 Relocation and Consolidation the Emergency Operations Facility and Joint Information Center for the Calvert Cliffs Nuclear Power Plant ML19053A5882019-04-19019 April 2019 Plants, Units 1 and 2 - Issuance of Amendment Nos. 329 and 307 Removal of an Exception to the Minimum Education Requirements for Shift Technical Advisors ML18365A3732019-01-22022 January 2019 Issuance of Amendment Nos. 328 and 306 to Extend Completion Time of Required Action D.3 of Technical Specification 3.8.1 to 14 Days ML18318A0142018-11-30030 November 2018 Correction to Amendment Nos. 326 and 304 Add Risk-Informed Completion Time Program ML18309A3012018-11-15015 November 2018 R. E. Ginna - Issuance of Amendment Nos. 327, 305, 232, 173, and 133, Respectively, Eliminating the Nuclear Advisory Committee Requirements ML18270A1302018-10-30030 October 2018 Issuance of Amendment Nos. 326 and 304 to Add Risk-Informed Completion Time Program ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18137A6142018-06-26026 June 2018 Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station; and R. E. Ginna Nuclear Power Plant - Issuance of Amendments Revising Emergency Action Level Schemes ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17209A6202017-08-30030 August 2017 Issuance of Amendments Control Room Recirculation Signal and Control Room Emergency Ventilation System Technical Specifications ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) ML16263A0012016-10-0707 October 2016 Issuance of Amendments Change to Surveillance Requirement 3.5.3.1 ML16175A3592016-08-30030 August 2016 Issuance of Amendments to Transition to Fire Protection Program NFPA-805. ML16060A4012016-04-11011 April 2016 Issuance of Amendments Relocation of Specific Surveillance Requirement Frequencies ML15352A1642016-03-17017 March 2016 Calvert Cliffs, Units 1 & 2 and Independent Spent Fuel Storage Installation; Nine Mile, Units 1 & 2 and R. E. Ginna - Issuance of Amendments Regarding the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel ML15279A1912015-12-30030 December 2015 Issuance of Amendment Revision to Pressurizer Safety Valve Technical Specifications ML15211A0052015-08-17017 August 2015 Amendment Adoption of TSTF-425, Relocate Specific Surveillance Frequencies to a Licensee Controlled Program ML15223B2502015-08-14014 August 2015 and Nine Mile Point Nuclear Station, Unit No. 2- Copy of License Amendment Nos. 313, 291, 118, and 150 ML15161A3802015-07-30030 July 2015 R. E. Ginna and Nine Mile Point, Unit 2 - Issuance of Amendments Regarding Implementation of Technical Specification Task Force Traveler 523, Generic Letter 2008-01, Managing Gas Accumulation (TAC Nos. MF4405 - MF4409) ML15153A2822015-07-30030 July 2015 Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 ML15133A1442015-07-23023 July 2015 Amendment Regarding New Technical Specification 3.7.18 for Atmospheric Dump Valves ML15154A6612015-07-16016 July 2015 Amendment License Amendment Request to Extend Containment Leakage Rate Test Frequency ML14307A8422015-01-14014 January 2015 Issuance of Amendment Regarding the Adoption of Technical Specification Task Force (TSTF) 426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO (Limiting Condition of Operation) 3.0.3 ML14288A1022014-10-29029 October 2014 Amendment Adoption for Technical Specification Improvement to Adopt TSTF-510-A Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. ML14280A5222014-10-21021 October 2014 Amendment Enhancements to Diesel Generator Surveillance Requirements (Tac Nos. ME9832 and ME9833) ML14239A4912014-10-21021 October 2014 Issuance of Amendments Regarding the Adoption of Technical Specification Task Force 501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (TAC Nos. ME9794-95) 2024-05-23
[Table view] Category:Safety Evaluation
MONTHYEARML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23086C0672023-04-24024 April 2023 Issuance of Amendment Nos. 345 and 323 Deletion of License Conditions Related to Decommissioning Trust ML22195A0252023-01-0303 January 2023 Authorization and Safety Evaluation for Alternative Request No. ISI-05-016 ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22202A5142022-07-28028 July 2022 Authorization of Relief Request No. RR-ISI-05-20 Regarding Mitigation of Buried Saltwater System Piping Degradation ML22105A4052022-05-0202 May 2022 Authorization and Safety Evaluation for Proposed Alternative No. ISI-05-019 ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML21347A8642022-01-13013 January 2022 Issuance of Amendment Nos. 342 and 320 Modifying the Licensing Basis to Allow for Full Core Offload with No Shutdown Cooling Loop Available During Certain Refueling Outages ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21299A0052021-12-14014 December 2021 Issuance of Amendments No. 340 and 318 Adoption of Technical Specifications Task Force Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21190A0042021-09-0202 September 2021 Proposed Alternative to the Requirements of the ASME Section XI, Subsection Iwl Concerning Unbound Post-Tensioning Systems ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21039A6362021-02-17017 February 2021 R. E. Ginna - Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20363A2422021-01-26026 January 2021 Issuance of Amendment Nos. 339 and 317 Regarding Accident Tolerant Fuel Lead Test Assemblies (EPID L-2019-LLA-0282) - (Non-Proprietary) ML20356A1212021-01-15015 January 2021 Relief from the Requirements of the ASME Code ML20273A0882020-11-0909 November 2020 Issuance of Amendment Nos. 338 and 316 Revise Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20275A1022020-11-0404 November 2020 Proposed Alternative I4r-07 to the Requirements of the American Society of Mechanical Engineers Code ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20182A1942020-08-13013 August 2020 Issuance of Amendment Nos. 336 and 314 Concerning Reactor Coolant Pump Flywheel Inspection Program ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19330D9092020-02-28028 February 2020 Issuance of Amendment Nos. 332 and 310 Risk-Informed Categorization and Treatment of Systems, Structures, and Components ML19337D0352020-02-28028 February 2020 Issuance of Amendment Nos. 333 and 311 Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19298C9722019-10-31031 October 2019 50.69 Apla SE Input L-2018-LLA-0482 ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19165A2472019-08-26026 August 2019 Issuance of Amendment Nos 330 and 308 Relocation and Consolidation the Emergency Operations Facility and Joint Information Center for the Calvert Cliffs Nuclear Power Plant ML19168A1172019-07-29029 July 2019 Issuance of Relief Request 15R-03 Use of ASME Code N-513-4 ML19196A1232019-07-19019 July 2019 Issuance of Relief Request 15R-04 Use of Encoded Phased Array Ultrasonic Examination Techniques ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19134A3732019-05-30030 May 2019 Issuance of Relief Request I5R-05 Relief from the Requirements of the ASME Code ML19136A2162019-05-30030 May 2019 Use of a Provision in a Later Edition of the ASME Code ML19053A5882019-04-19019 April 2019 Plants, Units 1 and 2 - Issuance of Amendment Nos. 329 and 307 Removal of an Exception to the Minimum Education Requirements for Shift Technical Advisors ML19046A0432019-02-25025 February 2019 Plants, Units 1 and 2 - Revision to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule ML18365A3732019-01-22022 January 2019 Issuance of Amendment Nos. 328 and 306 to Extend Completion Time of Required Action D.3 of Technical Specification 3.8.1 to 14 Days ML18318A0142018-11-30030 November 2018 Correction to Amendment Nos. 326 and 304 Add Risk-Informed Completion Time Program ML18309A3012018-11-15015 November 2018 R. E. Ginna - Issuance of Amendment Nos. 327, 305, 232, 173, and 133, Respectively, Eliminating the Nuclear Advisory Committee Requirements 2024-03-15
[Table view] |
Text
December 3, 2003 Mr. P. E. Katz, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 -
AMENDMENT RE: REMOVAL OF CHARGING PUMPS FROM THE EMERGENCY CORE COOLING SYSTEM TECHNICAL SPECIFICATION (TS) 3.5.2, ECCS - OPERATING (TAC NOS. MB6989 AND MB6990)
Dear Mr. Katz:
The Commission has issued the enclosed Amendment No. 260 to Renewed Facility Operating License No. DPR-53 and Amendment No. 237 to Renewed Facility Operating License No. DPR-69 for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2. These amendments consist of changes to the Technical Specifications (TSs) in response to your application transmitted by letter dated December 13, 2002, as supplemented September 25, 2003.
These amendments change the TSs by removing the requirement to have the charging pumps operable when thermal power is greater than 80% of rated thermal power. The change also removes Surveillance Requirement 3.5.2.4 for verifying the required charging pump flow rate.
The change to TS 3.5.2 does not modify any other charging pump requirements in the Technical Requirements Manual (e.g., requirements of charging pump availability for boration and cooldown remain in effect).
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commissions next regular biweekly Federal Register notice.
Sincerely,
/RA by P. Tam for/
Guy S. Vissing, Senior Project Manager, Section 1 Project Directorate 1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318
Enclosures:
- 1. Amendment No. 260 to DPR-53
- 2. Amendment No. 237 to DPR-69
- 3. Safety Evaluation
Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2 cc:
cc w/encls: See next page President Kristen A. Burger, Esquire Calvert County Board of Maryland Peoples Counsel Commissioners 6 St. Paul Centre 175 Main Street Suite 2102 Prince Frederick, MD 20678 Baltimore, MD 21202-1631 James Petro, Esquire Patricia T. Birnie, Esquire Counsel Co-Director Constellation Power Source Maryland Safe Energy Coalition 111 Market Street P.O. Box 33111 Baltimore, MD 21202 Baltimore, MD 21218 Jay E. Silberg, Esquire Mr. Loren F. Donatell Shaw, Pittman, Potts, and Trowbridge NRC Technical Training Center 2300 N Street, NW 5700 Brainerd Road Washington, DC 20037 Chattanooga, TN 37411-4017 Mark Geckle Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. Richard I. McLean, Manager Nuclear Programs Power Plant Research Program Maryland Dept. of Natural Resources Tawes State Office Building, B3 Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
ML031320507 *Safety Evaluation provided - no significant changes OFFICE PDI-1/PM PDI-1/LA PDI-1/SC SRXB/SC* OGC NAME PTam for SLittle DSkay for JUhle* MLemoncelli GVissing RLaufer DATE 12/3/03 12/3/03 12/3/03 05/06/03 12/3/03 DATED: December 3, 2003 AMENDMENT NO. 260 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-53 CALVERT CLIFFS UNIT 1 AMENDMENT NO. 237 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-69 CALVERT CLIFFS UNIT 2 DISTRIBUTION:
PUBLIC PDI-1 R/F RLaufer SLittle GVissing OGC GHill (2)
WBeckner ACRS CBixler, RI TBoyce JWermiel cc: Plant Service list
CALVERT CLIFFS NUCLEAR POWER PLANT, INC.
DOCKET NO. 50-317 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 260 Renewed License No. DPR-53
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Calvert Cliffs Nuclear Power Plant, Inc. (the licensee) dated December 13, 2002, as supplemented September 25, 2003 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.2. of Renewed Facility Operating License No. DPR-53 is hereby amended to read as follows:
- 2. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 260, are hereby incorporated into the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA by D. Skay/
Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: December 3, 2003
CALVERT CLIFFS NUCLEAR POWER PLANT, INC.
DOCKET NO. 50-318 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 237 Renewed License No. DPR-69
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Calvert Cliffs Nuclear Power Plant, Inc. (the licensee) dated December 13, 2002, as supplemented September 25, 2003 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.2. of Renewed Facility Operating License No. DPR-69 is hereby amended to read as follows:
- 2. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 237, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA by D. Skay/
Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: December 3, 2003
ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO. 260 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-53 AMENDMENT NO. 237 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-69 DOCKET NOS. 50-317 AND 50-318 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Pages Insert Pages 3.5.2-1 3.5.2-1 3.5.2-2 3.5.2-2
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 260 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-53 AND AMENDMENT NO. 237 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-69 CALVERT CLIFFS NUCLEAR POWER PLANT, INC.
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-317 AND 50-318
1.0 INTRODUCTION
By letter dated December 13, 2002, as supplemented September 25, 2003, Calvert Cliffs Nuclear Power Plant, Inc. (CCNPPI or the licensee) submitted a request for changes to the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Technical Specifications (TSs). The requested changes would change the TSs by removing the requirement to have the charging pumps operable when thermal power is greater than 80% of rated thermal power. The change would also remove Surveillance Requirement (SR) 3.5.2.4 for verifying the required charging pump flow rate. The proposed change also removes from the TS the requirement for injecting boron and coolant into the reactor above 80-percent power or above a reactor coolant pressure of 1700 psi. By letter dated September 2, 2003, the licensee submitted additional information to address the removal of the requirement for injecting boron and reactor coolant at high reactor power and pressure. The proposed change to TS 3.5.2 does not modify any other charging pump requirements in the Technical Requirements Manual (e.g., requirements of charging pump availability for boration and cooldown remain in effect). The September 25, 2003, supplemental letter provided clarifying information that did not enlarge the scope of the amendment as noticed in the original Federal Register notice or change the initial proposed no significant hazards consideration determination.
The proposed change to the TS 3.5.2, ECCS [emergency core cooling system] - Operating, is based on the reanalysis of a small-break (SB) loss-of-coolant acccident (LOCA) using a new small-break LOCA methodology. The Nuclear Regulatory Commission (NRC) staff approved the small-break LOCA methodology. The methodology and the results of this reanalysis are documented in CENPD-137, Supplement 2-P-A, Calculative Methods for the ABB CE Small Break LOCA Evaluation Model, April 1998. The licensee performed a reanalysis of SBLOCA using the new methodology and the results of the new reanalysis conformed to the ECCS acceptance criteria of 10 CFR 50.46(b). This proposed change will allow maintenance of charging pumps at power and will provide operational flexibility to the licensee while maintaining
safety. The proposed change will not affect boration and cooling requirements of charging pumps in lower modes of operation and these requirements will remain in the TSs.
2.0 REGULATORY EVALUATION
The Commissions regulatory requirements related to the content of TSs are set forth in 10 CFR 50.36 which ensures that the TS specified limiting conditions for operations are consistent with assumed values of the initial conditions in the licensees safety analyses. In accordance with the 10 CFR 50.36, the NRC staff and the Nuclear Sub System Supplier Owners groups developed improved standard technical specifications (ISTS) which meet 10 CFR 50.36(c)(2)(ii) and 10 CFR 50.36(c)(3) requirements. The licensee is using the guidance from the staff-approved NUREG-1432, Revision 1, and the guidance from NUREG-800, Standard Review Plan as appropriate for their plant. The CENPD-137, Supplement 2-P-A, the reanalysis of SBLOCA results showed that without charging pump flow credit, the acceptance criteria of 10 CFR 50.46 and 10 CFR Part 50 Appendix K are met.
3.0 TECHNICAL EVALUATION
The function of the ECCS is to provide core cooling and negative reactivity to ensure that the reactor core is protected during design-basis accidents including LOCAs, anticipated transient without scram, and Steam Generator Tube Rupture. The original SBLOCA analysis required charging pump flow credit to meet 10 CFR 50.46 criteria when the plant rated thermal power (RTP) is above 80% during Modes 1 and 2 operation. At or below 80% RTP, there was a corresponding decrease in decay heat such that the injection of water from one charging pump was not required to achieve acceptable results in the SBLOCA analyses.
The licensee performed the new SBLOCA ECCS performance analysis using Westinghouse SBLOCA evaluation model for Combustion Engineering designed pressurized-water reactors.
The new evaluation model meets the acceptance criteria of 10 CFR Part 50 Appendix K.
The new SBLOCA analysis incorporated several changes to plant parameters used in the previous analyses. There was no credit accounted for the charging pump flow in the new analysis. The new SBLOCA analysis explicitly modeled the replacement steam generators with up to 10% tube plugging and increased the reactor coolant system flow rate to 370,000 gpm in contrast to 340,000 gpm which was used in the current analysis. The current SBLOCA analysis modeled the original steam generators with up to approximately 30% tube plugging per steam generator with reduced RCS flow rate. This is a significant change in plant parameter which has improved core heat transfer. The staff reviewed and approved the new ECCS evaluation model and the findings are listed in CENPD-137, Supplement 2-P-A, Calculative Methods for the ABB CE Small Break LOCA Evaluation Model, April 1998. The licensee performed a reanalysis of SBLOCA using the new methodology and the results of the new reanalysis conformed to the ECCS acceptance criteria of 10 CFR 50.46(b) (Reference 1). The new SBLOCA analysis is applicable to Calvert Cliffs Unit 1 Cycle 16 which has a replacement steam generator. It would be applicable to Calvert Cliffs Unit 2 in their upcoming Cycle 15 with a replacement steam generator.
The licensee provided additional information to demonstrate that the charging pumps are not required to mitigate the consequences of a steam generator tube rupture (SGTR). The
licensee only credited the high-pressure safety injection pumps in the safety analysis to maintain coolant inventory and satisfy boration requirements during an SGTR.
The licensee confirmed that CCNPP design conforms to the requirements of 10 CFR 50.62, Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear plower plants. 10 CFR 50.62(c)(2) requires the scram system must be designed to perform its function in a reliable manner. Since the CCNPP probablistic risk assessment analysis demonstrates that the charging pumps are necessary to prevent core damage during ATWS, the charging pumps are enveloped by the requirements of 10 CFR 50.62. Since the requirements of 10 CFR 50.62 are equivalent to the charging pump TSs requirements, the charging pump TSs are redundant and may be removed from the CCNPP TSs.
Since the charging pumps are not an input assumption for any design basis accident analysis with a new ECCS evaluation model, it meets the 10 CFR 50.36(c)(2)(ii) requirement.
Therefore, the current requirements of charging pump and its SR 3.5.2.4 in TS 3.5.2, ECCS -
Operating, will be removed during Modes 1 and 2 operation. However, the other charging pumps requirements of boration and cooling will remain in TS during Modes 3 and 4 operation.
This proposal will facilitate the charging pump maintenance during power and will provide operational flexibility to the licensee while maintaining safety.
In summary, the NRC staff has determined that the licensee proposed change of TS 3.5.2, ECCS - Operating, is acceptable because it meets the current regulations of 10 CFR 50.36, 10 CFR 50.46, 10 CFR 50.62, and 10 CFR Part 50 Appendix K criteria.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Maryland State official was notified of the proposed issuance of the amendments. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes surveillance requirements. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (68 FR 7812). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above that (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the
Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
7.0 REFERENCE
- 1. Letter from Mr. C. H. Cruse, CCNPPI to NRC Document Control Desk, dated May 9, 2002, 10 CFR 50.46 30-day Report for changes to the Calvert Cliffs Nuclear Power Plant Emergency Core Cooling System Performance Analysis.
Principal Contributor: K. Desai Date: December 3, 2003