Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
BYRON 2002-0135, Day Inservice Inspection Report for Interval 2, Period 2, Outage 1 (B2R10)3 January 2002Day Inservice Inspection Report for Interval 2, Period 2, Outage 1 (B2R10)
BYRON 2002-5008, Steam Generator Inservice Inspection Summary Report13 June 2002Steam Generator Inservice Inspection Summary ReportNondestructive Examination
BYRON 2004-0004, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12)12 January 2004Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12)Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
Moisture barrier
Pressure Boundary Leakage
BYRON 2004-0077, Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11)2 July 2004Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11)Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
Moisture barrier
Pressure Boundary Leakage
BYRON 2005-0073, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 120 June 2005Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 1Boric Acid
Nondestructive Examination
VT-2
Pressure Boundary Leakage
BYRON 2006-0018, Transmittal of Corrected Page 1 of 1 of the Outage Inspection Summary Containment Structure31 January 2006Transmittal of Corrected Page 1 of 1 of the Outage Inspection Summary Containment Structure
BYRON 2006-0027, Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection Interval14 February 2006Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection IntervalBoric Acid
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Finite Element Analysis
Moisture barrier
Liquid penetrant
Through-Wall Leakage
Dissimilar Metal Weld
BYRON 2007-0006, Inservice Inspection Program Second Interval Relief Requests I2R-21, I2R-22, I2R-23, I2R-25 and I2R-5312 January 2007Inservice Inspection Program Second Interval Relief Requests I2R-21, I2R-22, I2R-23, I2R-25 and I2R-53VT-2
Dissimilar Metal Weld
Scaffolding
BYRON 2007-0055, B2R13, Spring 2007 Outage, Inservice Inspection Summary Report, for Inspection Activities from October 12, 2005 to May 3, 2007, Section 5.0 (Continued) Form NIS-2: Repairs/Modifications Through End10 July 2007B2R13, Spring 2007 Outage, Inservice Inspection Summary Report, for Inspection Activities from October 12, 2005 to May 3, 2007, Section 5.0 (Continued) Form NIS-2: Repairs/Modifications Through EndHydrostatic
BYRON 2007-0056, Steam Generator Inservice Inspection Summary Report for Refueling Outage 1331 July 2007Steam Generator Inservice Inspection Summary Report for Refueling Outage 13Nondestructive Examination
BYRON 2008-0063, Steam Generator Inservice Inspection Summary Report for Refueling Outage 1530 June 2008Steam Generator Inservice Inspection Summary Report for Refueling Outage 15Nondestructive Examination
BYRON 2008-0067, Day Inservice Inspection Report for Interval 3, Period 1, Outage 2 (B1R15)11 July 2008Day Inservice Inspection Report for Interval 3, Period 1, Outage 2 (B1R15)Boric Acid
Nondestructive Examination
VT-2
BYRON 2009-0003, Steam Generator Inservice Inspection Summary Report for Refueling Outage 1420 January 2009Steam Generator Inservice Inspection Summary Report for Refueling Outage 14Nondestructive Examination
BYRON 2009-0005, Inservice Inspection Report for Interval 3, Period 1, (B2R14), Section 5.0 Through End22 January 2009Inservice Inspection Report for Interval 3, Period 1, (B2R14), Section 5.0 Through EndHydrostatic
BYRON 2010-0041, Steam Generator - Inservice Inspection Summary Report for Refueling Outage 1523 July 2010Steam Generator - Inservice Inspection Summary Report for Refueling Outage 15Time of Discovery
Hydrostatic
Nondestructive Examination
BYRON 2010-0042, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15)3 August 2010Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15)Boric Acid
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
BYRON 2011-0103, Day Inservice Inspection Report for Interval 3, Period 2, (B1R17)21 July 2011Day Inservice Inspection Report for Interval 3, Period 2, (B1R17)Boric Acid
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
EVT-1
BYRON 2012-0001, Steam Generator Inservice Inspection Summary Report for Refueling Outage 164 January 2012Steam Generator Inservice Inspection Summary Report for Refueling Outage 16
BYRON 2013-0100, Day Inservice Inspection Report for Interval 3, Period 3, (B2R17)29 July 2013Day Inservice Inspection Report for Interval 3, Period 3, (B2R17)Boric Acid
Packing leak
Hydrostatic
Anchor Darling
Nondestructive Examination
VT-2
BYRON 2014-0078, Day Inservice Inspection Report for Interval 3, Period 3, (B1R19)24 June 2014Day Inservice Inspection Report for Interval 3, Period 3, (B1R19)Boric Acid
Nondestructive Examination
VT-2
Moisture barrier
Liquid penetrant
BYRON 2015-0009, 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18)21 January 201590-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18)Boric Acid
Nondestructive Examination
Liquid penetrant
BYRON 2015-0152, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20)29 December 2015Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20)Boric Acid
Nondestructive Examination
Moisture barrier
Liquid penetrant
BYRON 2016-0011, Steam Generator Tube Inspection Report for Refueling Outage 205 February 2016Steam Generator Tube Inspection Report for Refueling Outage 20Nondestructive Examination
BYRON 2016-0076, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19)11 August 2016Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19)Boric Acid
Nondestructive Examination
BYRON 2017-0048, Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (BYR21)15 June 2017Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (BYR21)Boric Acid
Weld Overlay
Nondestructive Examination
Moisture barrier
Liquid penetrant
BYRON 2018-0002, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (B2R20)18 January 2018Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (B2R20)Boric Acid
Nondestructive Examination
Moisture barrier
BYRON 2018-0027, Steam Generator Tube Inspection Report for Refueling Outage 205 April 2018Steam Generator Tube Inspection Report for Refueling Outage 20Nondestructive Examination
BYRON 2018-0130, Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22)20 December 2018Transmittal of 90-Day Lnservice Inspection Report for Interval 4, Period 1, (B1R22)
BYRON 2020-0053, Steam Generator Tube Inspection Report for Refueling Outage 2310 September 2020Steam Generator Tube Inspection Report for Refueling Outage 23Nondestructive Examination
BYRON 2021-0001, Day Inservice Inspection Report for Interval 4, Period 2, (B2R22)13 January 2021Day Inservice Inspection Report for Interval 4, Period 2, (B2R22)
BYRON 2022-0045, Day Inservice Inspection Report for Interval 4, Period 2, (B2R23)15 July 2022Day Inservice Inspection Report for Interval 4, Period 2, (B2R23)
BYRON 2023-0002, Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements6 April 2023Unit 2, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting RequirementsNondestructive Examination
BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)16 November 2023Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)
ML05172048920 June 2005Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 2Hydrostatic
ML05172049120 June 2005Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 3Hydrostatic
VT-2
ML05172049720 June 2005Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 4Hydrostatic
Anchor Darling
VT-2
ML05172050020 June 2005Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 5Hydrostatic
VT-2
ML05180072729 June 2005Re Notification of NRC Inspection and Request for InformationBoric Acid
Nondestructive Examination
VT-2
ML06177026622 June 2006Inservice Testing Program Plan for the Third Ten Year Interval. Cover to Attachment 6Safe Shutdown
Boric Acid
Stroke time
Cold shutdown justification
Power-Operated Valves
Scaffolding
ML0617702671 July 2006Inservice Testing Program for the Third Ten Year Interval. Attachment 7 to Attachment 14Safe Shutdown
Boric Acid
Stroke time
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
ML0617702701 July 2006Inservice Testing Program Plan for the Third Ten Year Interval. Component Cooling Water Table
ML0617702761 July 2006Inservice Testing Program Plan for the Third Ten Year Interval. Reactor Coolant Table
ML0701806095 January 2007Inservice Inspection Summary Report for Inspection Activities from March 26, 2005 to October 16, 2006Boric Acid
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Pressure Boundary Leakage
ML07024062024 January 2007Withdrawal of Requests for Relief from ASME Section Xi for Third Inservice Inspection Interval
ML07212047431 July 200790-Day Inservice Inspection Report for Interval 3, Period 1, Outage 1 (B2R13)
ML07212048410 July 2007B2R13, Spring 2007 Outage, Inservice Inspection Summary Report, for Inspection Activities from October 12, 2005 to May 3, 2007, Cover Through Section 3.0 Page 1 of 8Boric Acid
Weld Overlay
Nondestructive Examination
VT-2
EVT-1
ML07212049710 July 2007B2R13, Spring 2007 Outage, Inservice Inspection Summary Report, for Inspection Activities from October 12, 2005 to May 3, 2007, Section 3.0 Page 2 of 8 Through Section 4.0 Form NIS-1: Preservice and Inservice Examinations
ML07212050510 July 2007B2R13, Spring 2007 Outage, Inservice Inspection Summary Report, for Inspection Activities from October 12, 2005 to May 3, 2007, Section 5.0 Form NIS-2: Repairs/Modifications
ML07212051010 July 2007B2R13, Spring 2007 Outage, Inservice Inspection Summary Report, for Inspection Activities from October 12, 2005 to May 3, 2007, Section 5.0 (Continued) Form NIS-2: Repairs/ModificationsWeld Overlay
Hydrostatic
ML0721205247 June 2007Steam Generator Eddy Current Inspection Report Refueling Outage 13, April 2007Nondestructive Examination