90-Day Inservice Inspection Report for Interval 3, Period 1, Outage 1 (B2R13)
ML072120474
Person / Time
Site: Byron Constellation icon.png
Issue date: 07/31/2007
From: Hoots D M
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
1.10.0101, BYRON 2007-0055
Download: ML072120474 (1)


Text

Exek,n.ExeTon eerat~on Conipany, LLC~vwwex&oncorp.corn NJ'n:l e ar Br-n-5tatir~-i 4450 NLO th Gern~a n Church Road Byron, L 01010-9794 July 31, 2007 LTR: BYRON 2007-0055 FILE: 1.10.0101 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Unit 2 Facility Operating License No.NPF-66 NRC Docket No.SIN 50-455

SUBJECT:

Byron Station Unit 2 90-Day lnservice Inspection Report for Interval 3, Period 1, Outage 1 (B2R13)The subject 90-day lnservice Inspection Report for the Byron Station Unit 2, Refueling Outage Thirteen (i.e., B2R13)is being submitted pursuant to the requirements of Article IWA-6000,"Records and Reports"of Section Xl,"Rules for Inservice Inspection of Nuclear Power Plant Components,"

of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code 2001 Edition through the 2003 Addenda.The report covers the inservice inspections conducted prior to and during the Unit 2 Spring 2007 refueling outage.If there are any questions regarding this matter, please contact W.Grundmann, Regulatory Assurance Manager, at (815)406-2800.Respectfully, David M.Hoots Site Vice President Byron Nuclear Generating Station DMH/RGM,TLH/rah

Attachment:

B2R1 3 Inservice Inspection Summary Report-Spring 2007 Outage