Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action | 20 April 1999 | Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action | |
IA-84-515, Discusses Design Verification Program & Potential for Programmatic Deficiencies,Discussed During 821020 Commission Meeting.Expanded Program Will Determine If QA Deficiencies Identified in Design Activities Also Exist for Const | 9 November 1982 | Discusses Design Verification Program & Potential for Programmatic Deficiencies,Discussed During 821020 Commission Meeting.Expanded Program Will Determine If QA Deficiencies Identified in Design Activities Also Exist for Const | |
IA-84-741, Forwards Inputs to Sser 24,including Staff Evaluation of 840202 Petition Filed by Govt Accountability Project Inst for Policy Studies & Updated Info on Allegations 39 & 45. SALP Input Encl | 10 July 1984 | Forwards Inputs to Sser 24,including Staff Evaluation of 840202 Petition Filed by Govt Accountability Project Inst for Policy Studies & Updated Info on Allegations 39 & 45. SALP Input Encl | Affidavit |
IA-84-743, Lists Addl Actions to Be Taken to Assure Continuity in Review & Resolution of Allegations Re Design of Small Bore Piping | 9 February 1984 | Lists Addl Actions to Be Taken to Assure Continuity in Review & Resolution of Allegations Re Design of Small Bore Piping | |
IA-84-776, Summarizes Aslab 840906 Decision Affirming Board 820831 Initial Decision Authorizing Full Power License for Unit 1. Board 840910 Order Requests Parties Views for Further Action on Unit 2 & 840906 Order Denies Reopening Seismic Issues | 13 September 1984 | Summarizes Aslab 840906 Decision Affirming Board 820831 Initial Decision Authorizing Full Power License for Unit 1. Board 840910 Order Requests Parties Views for Further Action on Unit 2 & 840906 Order Denies Reopening Seismic Issues | |
IA-84-885, Advises That Commissioners Roberts & Zech Do Not Believe ACRS Technical Review Required Prior to Restart Decision.No Comments Offered by Commissioner Bernthal.Comments Encl.W/O Encl | 16 November 1984 | Advises That Commissioners Roberts & Zech Do Not Believe ACRS Technical Review Required Prior to Restart Decision.No Comments Offered by Commissioner Bernthal.Comments Encl.W/O Encl | |
IA-84-940, Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility | 11 December 1984 | Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility | |
IA-84-942, Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl | 19 November 1984 | Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl | |
IA-85-007, Notifies That as Long as Facility Is in Cold Shutdown,Plant Is in Compliance W/Regulations on Keeping Releases ALARA | 16 November 1981 | Notifies That as Long as Facility Is in Cold Shutdown,Plant Is in Compliance W/Regulations on Keeping Releases ALARA | |
IA-85-261, Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility | 3 March 1978 | Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility | |
IA-85-362, Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions | 21 February 1985 | Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions | |
IA-85-452, Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance | 9 July 1984 | Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance | |
IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities | 31 December 1980 | Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities | Boric Acid Systematic Assessment of Licensee Performance |
IA-85-544, Forwards Util 830311 Ltr Confirming Need for Improvement & Commitment to Specific Corrective Actions Made During 830309 Emergency Conference Call.Region V Concurs in Deferral of Full Power License Meeting for 30 Days | 15 March 1983 | Forwards Util 830311 Ltr Confirming Need for Improvement & Commitment to Specific Corrective Actions Made During 830309 Emergency Conference Call.Region V Concurs in Deferral of Full Power License Meeting for 30 Days | |
IA-85-562, Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted | 20 February 1985 | Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted | |
IA-85-563, Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning | 2 May 1985 | Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning | Safe Shutdown Earthquake Earthquake |
IA-85-602, Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl | 26 April 1982 | Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl | |
IA-85-665, Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active Zones | 25 February 1964 | Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active Zones | Earthquake |
IA-85-668, Partially Withheld Notice of Board Meeting 85-10 | 12 April 1985 | Partially Withheld Notice of Board Meeting 85-10 | |
IA-86-151, Forwards First Page of Transcript of Vh Tennyson 830325 Interview.Transcript Should Be Withheld from Distribution Outside NRC Until Investigation Completed | 15 April 1983 | Forwards First Page of Transcript of Vh Tennyson 830325 Interview.Transcript Should Be Withheld from Distribution Outside NRC Until Investigation Completed | |
IA-86-197, Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V | 22 August 1985 | Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V | |
IA-86-585, Summarizes Areas to Be Inspected Per Hosgni Mods.List Tentative & Will Be Modified as Necessary Pending Completion of Licensee Sys Reviews.W/One Oversize Figure | 20 December 1977 | Summarizes Areas to Be Inspected Per Hosgni Mods.List Tentative & Will Be Modified as Necessary Pending Completion of Licensee Sys Reviews.W/One Oversize Figure | Safe Shutdown Earthquake Nondestructive Examination Temporary Modification Earthquake Backfit |
IA-86-656, Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested | 8 March 1982 | Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested | |
IA-86-744, Submits Daily Highlight.On 860930,util Commenced Unloading Spent Fuel from Unit 1 Into Original Racks,Reinstalled Into Unit 1 Pool.On 861001,fuel Assembly Element in Reactor Vessel Tipped Into Unloaded Assemblies.No Fuel Damage | 3 October 1986 | Submits Daily Highlight.On 860930,util Commenced Unloading Spent Fuel from Unit 1 Into Original Racks,Reinstalled Into Unit 1 Pool.On 861001,fuel Assembly Element in Reactor Vessel Tipped Into Unloaded Assemblies.No Fuel Damage | |
IA-86-793, Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets | 22 September 1986 | Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets | |
IA-87-111, Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public Safety | 19 October 1972 | Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public Safety | Safe Shutdown |
IA-87-121, Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code | 24 June 1982 | Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code | |
IA-87-214, Discusses ACRS 92nd Meeting on 671207-09.ACRS Completed Review of PG&E Application for Const of Nuclear Unit at Diablo Canyon Site.Facility Can Be Constructed W/O Risk to Public Health & Safety | 20 December 1967 | Discusses ACRS 92nd Meeting on 671207-09.ACRS Completed Review of PG&E Application for Const of Nuclear Unit at Diablo Canyon Site.Facility Can Be Constructed W/O Risk to Public Health & Safety | Earthquake |
IA-87-244, Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by Utils | 14 July 1983 | Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by Utils | Internal Flooding Backfit Overspeed trip |
IA-87-413, Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit Interviews | 24 February 1987 | Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit Interviews | High Radiation Area |
IA-87-449, Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il | 10 July 1987 | Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il | |
IA-87-535, Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct | 23 January 1986 | Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct | |
IA-87-714, Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl | 18 May 1987 | Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl | Probabilistic Risk Assessment |
IA-87-830, Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o Encl | 19 November 1986 | Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o Encl | Systematic Assessment of Licensee Performance |
IA-88-114, Forwards List of Plant Open Items Resulting from ACRS Subcommittee 750218 & 19 Meetings & List of Actions Requested from Review Branches for Used in Preparing SER Suppl Prior to Next ACRS Meeting | 24 March 1975 | Forwards List of Plant Open Items Resulting from ACRS Subcommittee 750218 & 19 Meetings & List of Actions Requested from Review Branches for Used in Preparing SER Suppl Prior to Next ACRS Meeting | Safe Shutdown Finite Element Analysis Design basis earthquake Earthquake |
IA-88-129, Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR | 21 March 1988 | Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR | |
IA-88-156, Forwards 700917-18 Feeder Insp Rept | 13 October 1970 | Forwards 700917-18 Feeder Insp Rept | |
IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl | 9 March 1988 | Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl | Stroke time |
IA-88-184, Discusses Questions Raised by ASLB During Malibu Hearing Re Seismic Design & Quotes Statements from Draft Usc&Gs Rept. Draft Minutes of ACRS 99th Meeting on 680711-13 in Washington,Dc Encl | 28 September 1965 | Discusses Questions Raised by ASLB During Malibu Hearing Re Seismic Design & Quotes Statements from Draft Usc&Gs Rept. Draft Minutes of ACRS 99th Meeting on 680711-13 in Washington,Dc Encl | Boric Acid High winds Hydrostatic Finite Element Analysis Earthquake Fuel cladding |
IA-88-356, Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl | 4 May 1987 | Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl | |
IA-88-497, Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl | 24 June 1988 | Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl | |
IA-89-226, Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 | 16 September 1987 | Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 | |
IA-97-177, Discusses Potential 10CFR21 Reportable Concern from Crane Valves on Weak Link Analyses,Per .Considers Action Taken by Crane to Be Reasonable in Alerting Nuclear Utils to Updated Weak Link Calculations for MOVs Used in Plants | 7 April 1997 | Discusses Potential 10CFR21 Reportable Concern from Crane Valves on Weak Link Analyses,Per .Considers Action Taken by Crane to Be Reasonable in Alerting Nuclear Utils to Updated Weak Link Calculations for MOVs Used in Plants | Weak link |
IA-97-315, Submits Latest Info on 4 Kittens Contaminated W/Radiation at Plant,Unit 1 as of 960206 | 7 February 1996 | Submits Latest Info on 4 Kittens Contaminated W/Radiation at Plant,Unit 1 as of 960206 | |
IR 05000117/2004015 | 25 July 1985 | Updates Operating Experience for Plant for 850415-0715. Review Updates Encl 850129 & 0426 Reviews for 841026-850117 & 850117-0415,respectively | |
IR 05000206/1983023 | 5 July 1984 | Discuss Actions Taken as Result of La Times 831023 Article Re Possession & Use of Drugs at Plant.Completed Bechtel Power Corp Investigation & Security Insp Repts 50-206/83-23, 50-361/83-38 & 50-362/83-36 Close Required Actions | |
IR 05000206/1985012 | 30 April 1985 | Discusses Unresolved Item Identified in Insp Rept 50-206/85-12 Re Performance of as-found Analysis for Type a Containment Integrated Leak Rate Test.Nrc Position Should Be Clarified Before Notice of Violation Issued | |
IR 05000225/2003005 | 13 February 1985 | Confirms Plans to Conduct Plant Operations & Surveillance Insp at Site on 850225-0305.Insp Team Listed | |
IR 05000275/1984007 | 21 June 1984 | Forwards Special Insp Rept 50-275/84-07 Re Performance of Plant Operating Crews,Conducted by Region V,Lll & Eg&G Idaho,Inc.Performance Above Average Compared to Similar Licensed Facilities | |
IR 05000275/1985036 | 30 December 1985 | Requests NRR Assume Lead Responsibility for Evaluation & Resolution of Unresolved Item 50-275/85-36-04 Re Fire Dampers | Safe Shutdown Fire Barrier Emergency Lighting Continuous fire watch Fire Watch Hourly Fire Watch |