Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000000/LER-1975-004, Forwards LER 75-004-00.Conclusions of Investigation Will Be Submitted in 10-day Rept13 January 1975Forwards LER 75-004-00.Conclusions of Investigation Will Be Submitted in 10-day Rept
05000000/LER-1985-035, Forwards LER 85-035-00 Re Physical Security Event5 June 1985Forwards LER 85-035-00 Re Physical Security Event
05000000/LER-1985-078, Forwards Revised LER 85-078-01 Re Physical Security Event22 November 1985Forwards Revised LER 85-078-01 Re Physical Security Event
05000000/LER-1985-083, Forwards LER 85-083-01.Rept Contains Safeguards Info3 October 1986Forwards LER 85-083-01.Rept Contains Safeguards Info
05000000/LER-1986-008, Forwards LER 86-008-0016 October 1986Forwards LER 86-008-00
05000000/LER-1986-018, Forwards LER 86-018-0014 March 1986Forwards LER 86-018-00
05000000/LER-1986-031, Forwards LER 86-031-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)13 June 1986Forwards LER 86-031-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)
05000000/LER-1986-045, Forwards LER 86-045-00 Re Physical Security Event.Rept Withheld (Ref 10CFR73.21)8 September 1986Forwards LER 86-045-00 Re Physical Security Event.Rept Withheld (Ref 10CFR73.21)
05000000/LER-1986-049, Forwards LER 86-049-00 Re Physical Security Event.Encl Withheld (Ref 10CFR73.21)29 September 1986Forwards LER 86-049-00 Re Physical Security Event.Encl Withheld (Ref 10CFR73.21)
05000000/LER-1986-054, Forwards LER 86-054-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)7 October 1986Forwards LER 86-054-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21)
05000000/LER-1986-055, Forwards LER 86-055-00 Re Physical Security Event.Withheld (Ref 10CFR73.21)10 October 1986Forwards LER 86-055-00 Re Physical Security Event.Withheld (Ref 10CFR73.21)
05000348/LER-1978-062, Confirms LER 78-062/01T-0:on 780919 Re Missing Seismic Pipe Restraint on Main Feedwater Line.Lateral Seismic Restraint FW-H49 Being Reinstalled.Investigation Underway.Updated LER Will Follow25 September 1978Confirms LER 78-062/01T-0:on 780919 Re Missing Seismic Pipe Restraint on Main Feedwater Line.Lateral Seismic Restraint FW-H49 Being Reinstalled.Investigation Underway.Updated LER Will Follow
05000348/LER-1978-063, Forwards LER 78-063/03L-012 October 1978Forwards LER 78-063/03L-0
05000348/LER-1978-064, Forwards LER 78-064/03L-010 October 1978Forwards LER 78-064/03L-0
05000348/LER-1978-065, Forwards LER 78-065/03L-011 October 1978Forwards LER 78-065/03L-0
05000348/LER-1978-092, Forwards LER 78-092/03L-024 January 1979Forwards LER 78-092/03L-0
05000348/LER-1979-030, Forwards LER 79-030/03L-014 August 1979Forwards LER 79-030/03L-0
05000348/LER-1980-058, Submits Description of Actions Taken Subsequent to Initial 3-yr Containment post-tensioning Sys Testing & Insp,Per LER 80-058/03L-1.Sys Is Performing Design Function W/Margin of Safety,Therefore No Addl Action Necessary20 July 1982Submits Description of Actions Taken Subsequent to Initial 3-yr Containment post-tensioning Sys Testing & Insp,Per LER 80-058/03L-1.Sys Is Performing Design Function W/Margin of Safety,Therefore No Addl Action Necessary
05000348/LER-1981-019, Forwards LER 81-019/03L-07 May 1981Forwards LER 81-019/03L-0
05000348/LER-1982-018, Forwards LER 82-018/03L-010 May 1982Forwards LER 82-018/03L-0
05000348/LER-1982-021, Forwards LER 82-021/01T-024 May 1982Forwards LER 82-021/01T-0
05000348/LER-1982-026, Forwards LER 82-026/03L-021 June 1982Forwards LER 82-026/03L-0
05000348/LER-1982-030, Forwards LER 82-030/03L-015 July 1982Forwards LER 82-030/03L-0
05000348/LER-1982-032, Forwards LER 82-032/03L-020 July 1982Forwards LER 82-032/03L-0
05000348/LER-1982-040, Forwards LER 82-040/03L-027 August 1982Forwards LER 82-040/03L-0
05000348/LER-1982-046, Forwards LER 82-046/01T-02 September 1982Forwards LER 82-046/01T-0
05000348/LER-1982-053, Forwards LER 82-053/03L-08 October 1982Forwards LER 82-053/03L-0
05000348/LER-1982-057, Forwards LER 82-057/03L-029 October 1982Forwards LER 82-057/03L-0
05000348/LER-1982-061, Forwards LER 82-061/03L-020 January 1983Forwards LER 82-061/03L-0
05000348/LER-1983-002, Forwards LER 83-002/03L-025 February 1983Forwards LER 83-002/03L-0
05000348/LER-1983-005, Forwards LER 83-005/01T-011 February 1983Forwards LER 83-005/01T-0
05000348/LER-1983-006, Forwards LER 83-006/01T-02 March 1983Forwards LER 83-006/01T-0
05000348/LER-1983-007, Forwards LER 83-007/03L-025 February 1983Forwards LER 83-007/03L-0
05000348/LER-1983-008, Forwards LER 83-008/03L-0,83-006/03L-0,83-007/03L-0, 83-008/03L-0 & 83-011/03L-0.W/o LERs 83-006/03L-0, 83-007/03L-0,83-008/03L-0 & 83-011/03L-08 March 1983Forwards LER 83-008/03L-0,83-006/03L-0,83-007/03L-0, 83-008/03L-0 & 83-011/03L-0.W/o LERs 83-006/03L-0, 83-007/03L-0,83-008/03L-0 & 83-011/03L-0
05000348/LER-1983-009, Forwards LER 83-009/03L-04 April 1983Forwards LER 83-009/03L-0
05000348/LER-1983-011, Forwards LER 83-011/03L-021 April 1983Forwards LER 83-011/03L-0
05000348/LER-1983-016, Forwards LER 83-016/03L-02 May 1983Forwards LER 83-016/03L-0
05000348/LER-1983-038, Forwards LERs 83-060/03L-0,83-061/03L-0,83-037/03L-0 & 83-038/03L-0.W/o LER 83-038/03L-04 October 1983Forwards LERs 83-060/03L-0,83-061/03L-0,83-037/03L-0 & 83-038/03L-0.W/o LER 83-038/03L-0
05000348/LER-1983-039, Forwards LER 83-039/03L-0 & Updated LERs 83-024/03X-1 & 83-025/03X-110 August 1983Forwards LER 83-039/03L-0 & Updated LERs 83-024/03X-1 & 83-025/03X-1
05000348/LER-1985-005, Forwards Results of Testing/Insp of 11 Tendon Anchor Heads, Based on Commitment in 850812 LER 85-005-01 to Conduct Addl Tests & Insps on Tendon Anchor Heads Which Failed Due to Hydrogen Stress Cracking.Anchor Heads Acceptable17 January 1986Forwards Results of Testing/Insp of 11 Tendon Anchor Heads, Based on Commitment in 850812 LER 85-005-01 to Conduct Addl Tests & Insps on Tendon Anchor Heads Which Failed Due to Hydrogen Stress Cracking.Anchor Heads Acceptable
05000348/LER-1993-001, Forwards Rev 12A to Updated FSAR for Jm Farley Nuclear Plant,Units 1 & 2.Rev 12A Submitted to Resolve Issue Reported in Voluntary LER 93-001-00,dtd 9307236 June 1995Forwards Rev 12A to Updated FSAR for Jm Farley Nuclear Plant,Units 1 & 2.Rev 12A Submitted to Resolve Issue Reported in Voluntary LER 93-001-00,dtd 930723
05000348/LER-1998-002, Forwards LER 98-002-00 Re SG Tube Leakage Investigation Repair & Evaluation.Commitments Contained in Corrective Action Section of Event Rept,Listed3 September 1998Forwards LER 98-002-00 Re SG Tube Leakage Investigation Repair & Evaluation.Commitments Contained in Corrective Action Section of Event Rept,Listed
05000348/LER-1998-006, Forwards LER 98-006-00,re PRF Sys Suction Damper Outside Design & Licensing Basis.First Paragraph in Corrective Action Section Contains NRC Commitments Associated with LER18 December 1998Forwards LER 98-006-00,re PRF Sys Suction Damper Outside Design & Licensing Basis.First Paragraph in Corrective Action Section Contains NRC Commitments Associated with LER
05000348/LER-1998-007, Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed23 April 1999Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as ListedProbabilistic Risk Assessment
Large early release frequency
05000364/LER-1981-005, Forwards LER 81-005/03L-07 May 1981Forwards LER 81-005/03L-0
05000364/LER-1981-010, Notifies of Typographical Error in Forwarding LER 81-010/03X-1.Ltr Mistakenly Referred to LER 82-043/01X-124 January 1983Notifies of Typographical Error in Forwarding LER 81-010/03X-1.Ltr Mistakenly Referred to LER 82-043/01X-1
05000364/LER-1981-050, Forwards LER 81-050/03L-011 December 1981Forwards LER 81-050/03L-0
05000364/LER-1982-007, Forwards LER 82-007/03L-016 February 1982Forwards LER 82-007/03L-0
05000364/LER-1982-013, Forwards LER 82-013/03L-06 April 1982Forwards LER 82-013/03L-0
05000364/LER-1982-016, Forwards LER 82-016/03L-028 April 1982Forwards LER 82-016/03L-0