Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18003B098 | 31 March 1985 | Control Room Design Review Summary Rept for Shearon Harris Nuclear Power Plant,Unit 1. | Boric Acid Emergency Lighting Earthquake Backfit |
ML18003B124 | 31 December 1984 | Electrical Separation Analysis. | Fire Barrier Coatings |
ML18004A347 | 23 July 1986 | Chatham County Emergency Response Plan:Unanswered Questions. | Chernobyl |
ML18004B827 | 31 January 1987 | Criticality Analysis of Shearon Harris Fuel Racks. | |
ML18005A418 | 31 March 1988 | Metallurigical Evaluation of EDG Bases from Cp&L,Shearon Harris Nuclear Station. | |
ML18005A640 | 31 July 1988 | Revised Shearon Harris Nuclear Power Plant Emergency Response Facility Info Sys Verification & Validation Final Rept. | |
ML18005A852 | 30 November 1988 | Criticality Analysis of Shearon Harris Spent Fuel Racks W/ Ifba Fuel. | |
ML18010A854 | 9 October 1992 | Flow Calibration Rept Carolina Power & Light Harris Plant. | |
ML18010A952 | 30 November 1992 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Nondestructive Examination Liquid penetrant |
ML18010B084 | 5 May 1993 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Safe Shutdown Boric Acid Shutdown Margin Loop seal Stroke time Temporary Modification Stress corrosion cracking Liquid penetrant Overspeed trip |
ML18011A904 | 3 March 1995 | Shnpp Operator Training Simulator Certification Quadrennial Rept. | Boric Acid Shutdown Margin Stroke time Emergency Lighting Overspeed trip |
ML18016A263 | 30 June 1997 | 1997 Automated Inservice Exam of RPV & Adjacent Piping Welds at Shearon Harris Nuclear Plant,Unit 1, Vol 1,final Rept W/Apps | Nondestructive Examination |
ML18016A771 | 26 May 1998 | Non-proprietary Rev 2 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris Spent Fuel Pools 'C' & 'D'. | High Radiation Area Ultimate heat sink Non-Destructive Examination Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Water rod |
ML18016A853 | 18 February 1999 | Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP 'C' & 'D'. | High Radiation Area Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Depleted uranium Water rod |
ML18016A866 | 31 March 1999 | Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept. | Boric Acid Shutdown Margin Emergency Lighting Overspeed trip |
ML18016A894 | 5 April 1999 | Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760 | |
ML18016A937 | 30 June 1998 | Technical Rept on Matl Identification of Spent Fuel Piping Welds at Hnp. | |
ML18017A477 | 30 April 1975 | Large Scale Triaxial Shear & Permeability Tests. Forwards Results of 15 Inch Diameter Consolidated Undrained Triaxial Shear Test,Grain Size Analyses & 14 Inch Diameter Constant Head Permeability Tests | |
ML18017A479 | 21 December 1978 | Random Rockfill Matl Test VR-24-4-1. Contains Results of Test Fill VR-24-4-1 Which Includes Large Volume in-place Density Test & Grain Size Distribution Tests | |
ML18017A480 | 20 December 1978 | Random Rockfill Matl Test VR-24-4-2. Contains Results of Test Fill VR-24-4-2 Which Includes 2 Large Volume in-place Density Tests & Grain Size Distribution Tests | |
ML18017A893 | 28 February 1999 | Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant. | Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Chernobyl Fuel cladding Power Uprate |
ML18017A898 | 12 May 1999 | Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines. | |
ML18017B061 | 18 April 1980 | Archaeological Survey of Proposed CP&L Harris-Harnett Substation & 2.4 Miles of Harris-Harnett 500 Kv Transmission Line. | |
ML18017B270 | 27 October 1980 | Plant,Main Dam Spillway Faults J1 & J2. | |
ML18017B292 | 30 November 1980 | Constr Milestones & Activities Updated to 801130 | |
ML18017B429 | 31 July 1981 | Revised Mgt Capability Rept. | Safe Shutdown Nondestructive Examination Safeguards Contingency Plan Backfit Power change Overexposure |
ML18017B448 | 3 September 1981 | Financial Info Supporting Application for Amend to CPPR-158, CPPR-159,CPPR-160,CPPR-161 & OL Application,& Amend to Licenses DPR-71 & DPR-62 to Add Nc Municipal Power Agency Number 3 as co-owner of Facilities | |
ML18018A436 | 16 September 1982 | Revised Human Factors Design Evaluation Rept for Shearon Harris Unit 1 Control Room. | Emergency Lighting |
ML18018A483 | 31 January 1983 | Rept on Proposed Neuse Fault. | Earthquake |
ML18018A652 | 4 August 1983 | Revised Mgt Capability Rept. | Hot Short Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Grab sample Fire Barrier Safe Shutdown Earthquake Post Accident Monitoring Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Exemption Request Earthquake Biofouling Fire Protection Program Scaffolding Backfit Power change Overexposure |
ML18018A720 | 31 October 1981 | Final Geologic Rept on Foundation Conditions,Power Plant, Dams & Related Structures, Vols 1-3 | |
ML18018B413 | 14 October 1983 | Nonproprietary Table of Control Rod Drive Mechanism (CRDM) 400 Series Stainless Steel Items. | |
ML18018B429 | 30 September 1983 | Analysis of Habitability of Shearon Harris Nuclear Power Plant Emergency Operations Facility. | |
ML18018B430 | 30 September 1983 | Analysis of Habitability of Shearon Harris Nuclear Power Plant Technical Support Ctr. | |
ML18018B434 | 28 October 1983 | Responses to Requests for Addl Info Re Draft SER Open Items 372,63,30,172 & 213 | Shutdown Margin Operating Basis Earthquake Turbine Missile Flow Induced Vibration Overspeed trip |
ML18018B510 | 30 September 1983 | Safety Analysis of Shearon Harris Safety Parameter Display Sys. | Boric Acid |
ML18018B541 | 10 January 1984 | Revised Mgt Capability Rept. | Shutdown Margin Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Earthquake Biofouling Overexposure |
ML18018B632 | 28 March 1984 | Audit Rept, Human Factors Engineering Detailed Control Room Design Review In-Progress Audit. | Backfit |
ML18018B694 | 30 April 1984 | Rept on Operability of Pressurizer Safety Relief Valves, PORVs & Electrical Motor Operated Block Valves. | Loop seal Stroke time Operability Determination |
ML18018B762 | 31 August 1984 | Rev 7 to Functional Capability of ASME Class 1 Auxiliary Piping Sys. | Finite Element Analysis |
ML18018B851 | 17 December 1984 | Emergency Diesel Generator Equipment. | Safe Shutdown Eddy Current Testing Liquid penetrant |
ML18018B852 | 30 November 1984 | Vols 1-4 of Tdi Diesel Generator Design Review & Quality Revalidation Rept. | |
ML18018B895 | 11 February 1985 | Seismic & Dynamic Qualification of Mechanical & Electrical Equipment,Master List, Vols 1 & 2 | |
ML18018B898 | 13 February 1985 | Elimination of Arbitrary Intermediate Break Points in Main Feedwater Sys. | Safe Shutdown Stress corrosion cracking Flow Induced Vibration |
ML18019A256 | 2 July 1985 | Containment Purge & Vent Valve Operability Review. | |
ML18019A380 | 30 September 1985 | Crdr Final Summary Rept. | Boric Acid Emergency Lighting Earthquake Backfit |
ML18019A383 | 11 September 1985 | Environ Qualification of Mechanical Equipment. | Boric Acid B.5.b |
ML18019A455 | 25 October 1985 | Containment Recirculation Sump Evaluation. | Loop seal |
ML18019A559 | 4 November 1985 | Predicted Behavior of Containment Bldg During Structural Integrity Test. | |
ML18019A793 | 28 April 1986 | Rev 1 to Shearon Harris Nuclear Power Plant Crdr Final Summary Rept. | Hot Short Safe Shutdown Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Post Accident Monitoring Coatings Emergency Lighting Earthquake Fire Protection Program Scaffolding Backfit |