Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18017A8981999-05-12012 May 1999 Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines. ML18016A8941999-04-0505 April 1999 Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760 ML18016A8661999-03-31031 March 1999 Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept. ML18017A8931999-02-28028 February 1999 Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant. ML18016A8531999-02-18018 February 1999 Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP 'C' & 'D'. ML18016A9371998-06-30030 June 1998 Technical Rept on Matl Identification of Spent Fuel Piping Welds at Hnp. ML18016A7711998-05-26026 May 1998 Non-proprietary Rev 2 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris Spent Fuel Pools 'C' & 'D'. ML18016A2631997-06-30030 June 1997 1997 Automated Inservice Exam of RPV & Adjacent Piping Welds at Shearon Harris Nuclear Plant,Unit 1, Vol 1,final Rept W/Apps ML20217Q2751997-06-30030 June 1997 CP&L Fitness for Duty Program Performance Data for Period 970101-0630 ML18022A9621995-06-30030 June 1995 NPP IPEEE Final Rept. ML18011A9041995-03-0303 March 1995 Shnpp Operator Training Simulator Certification Quadrennial Rept. ML18010B0841993-05-0505 May 1993 NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. ML18010A9521992-11-30030 November 1992 NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. ML18010A8541992-10-0909 October 1992 Flow Calibration Rept Carolina Power & Light Harris Plant. ML18005A8521988-11-30030 November 1988 Criticality Analysis of Shearon Harris Spent Fuel Racks W/ Ifba Fuel. ML18005A6401988-07-31031 July 1988 Revised Shearon Harris Nuclear Power Plant Emergency Response Facility Info Sys Verification & Validation Final Rept. ML18022A6941988-05-31031 May 1988 SPDS Dynamic Operational/Human Factors Evaluation, Final Rept ML18005A4181988-03-31031 March 1988 Metallurigical Evaluation of EDG Bases from Cp&L,Shearon Harris Nuclear Station. ML18004B8271987-01-31031 January 1987 Criticality Analysis of Shearon Harris Fuel Racks. ML18004A3471986-07-23023 July 1986 Chatham County Emergency Response Plan:Unanswered Questions. ML18019B0461986-06-13013 June 1986 Rev 1 to Analysis for Location of Battery RM SA & SB Eyewash Station & Shower. ML18019B0081986-04-30030 April 1986 Rev 2 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. ML20203N4171986-04-30030 April 1986 Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications ML18019A7931986-04-28028 April 1986 Rev 1 to Shearon Harris Nuclear Power Plant Crdr Final Summary Rept. ML18019A5591985-11-0404 November 1985 Predicted Behavior of Containment Bldg During Structural Integrity Test. ML18019A4551985-10-25025 October 1985 Containment Recirculation Sump Evaluation. ML18019A3801985-09-30030 September 1985 Crdr Final Summary Rept. ML18019A3831985-09-11011 September 1985 Environ Qualification of Mechanical Equipment. ML18019A2561985-07-0202 July 1985 Containment Purge & Vent Valve Operability Review. ML20205B1311985-04-17017 April 1985 Technical Evaluation Rept of Spds,Shearon Harris Nuclear Power Plant ML18003B0981985-03-31031 March 1985 Control Room Design Review Summary Rept for Shearon Harris Nuclear Power Plant,Unit 1. ML18018B8981985-02-13013 February 1985 Elimination of Arbitrary Intermediate Break Points in Main Feedwater Sys. ML18018B8951985-02-11011 February 1985 Seismic & Dynamic Qualification of Mechanical & Electrical Equipment,Master List, Vols 1 & 2 ML18003B1241984-12-31031 December 1984 Electrical Separation Analysis. ML18018B8511984-12-17017 December 1984 Emergency Diesel Generator Equipment. ML18018B8521984-11-30030 November 1984 Vols 1-4 of Tdi Diesel Generator Design Review & Quality Revalidation Rept. ML20134G1621984-11-0909 November 1984 Revised Rept of Results of Interviews Conducted W/Cp&L Personnel Re Selected Aspects of Affidavit Submitted by Former CP&L Employee C Van Vo ML18018B7621984-08-31031 August 1984 Rev 7 to Functional Capability of ASME Class 1 Auxiliary Piping Sys. ML18018B6941984-04-30030 April 1984 Rept on Operability of Pressurizer Safety Relief Valves, PORVs & Electrical Motor Operated Block Valves. ML18018B6321984-03-28028 March 1984 Audit Rept, Human Factors Engineering Detailed Control Room Design Review In-Progress Audit. ML18018B5411984-01-10010 January 1984 Revised Mgt Capability Rept. ML18018B4341983-10-28028 October 1983 Responses to Requests for Addl Info Re Draft SER Open Items 372,63,30,172 & 213 ML18018B4131983-10-14014 October 1983 Nonproprietary Table of Control Rod Drive Mechanism (CRDM) 400 Series Stainless Steel Items. ML18018B4291983-09-30030 September 1983 Analysis of Habitability of Shearon Harris Nuclear Power Plant Emergency Operations Facility. ML18018B5101983-09-30030 September 1983 Safety Analysis of Shearon Harris Safety Parameter Display Sys. ML18018B4301983-09-30030 September 1983 Analysis of Habitability of Shearon Harris Nuclear Power Plant Technical Support Ctr. ML18018A6521983-08-0404 August 1983 Revised Mgt Capability Rept. ML18018A4831983-01-31031 January 1983 Rept on Proposed Neuse Fault. 1999-09-30
[Table view] Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18017A9151999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr ML18017A8621999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr ML18017A8361999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr ML18016B0151999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Shearon Harris Npp. with 990713 Ltr ML18016A9851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990614 Ltr ML18016A9581999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr ML18016A9101999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr ML18016A8551999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr ML18016A8041999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With 990211 Ltr ML18016A7801998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with 990113 Ltr ML18016A7671998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr ML18016A7201998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr ML18016A6201998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr ML18016A5881998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With 980914 Ltr ML18016A5071998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant.W/980811 Ltr ML18016A4861998-06-30030 June 1998 Monthly Operating Rept for June 1998 for SHNPP.W/980715 Ltr ML18016A4521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr ML18022B0521998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Shearon Harris Nuclear Power Plant.W/980514 Ltr ML18016A3901998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for SHNPP.W/980414 Ltr ML18016A3511998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for SHNPP.W/980313 Ltr ML18016A3181998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Shearon Harris Nuclear Power Plant.W/980212 Ltr ML18016A2851997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Shearon Harris Nuclear Plant,Unit 1.W/980114 Ltr ML18016A2651997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Shearon Harris Nuclear Power Plant.W/971216 Ltr ML18016A2291997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Shearon Harris Nuclear Power Plant.W/971114 Ltr ML18016A2121997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Shearon Harris Nuclear Power Plant,Unit 1.W/971014 Ltr ML18016A1871997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Shearon Harris Nuclear Plant.W/970911 Ltr ML18012A8591997-07-31031 July 1997 Monthly Operating Rept for July 1997 for SHNPP.W/970813 Ltr ML18012A8321997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Shearon Harris Nuclear Power Plant.W/970711 Ltr ML18012A8131997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Shearon Harris NPP, Unit 1.W/970616 Ltr ML18012A7821997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Shearon Harris Nuclear Power Plant.W/970514 Ltr ML18012A6181997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Harris Nuclear Plant,Unit 1.W/970415 Ltr ML18012A5821997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Shearon Harris Nuclear Power Plant.W/970312 Ltr PY-CEI-NRR-2150, Monthly Operating Rept for Feb 1997 for Pnpp1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pnpp ML18012A5141997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Shearon Harris Nuclear Power Plant.W/970214 Ltr ML18012A4651996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Shearon Harris Nuclear Power Plant.W/970110 Ltr ML18012A4431996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Shearon Harris Nuclear Power Plant.W/961211 Ltr ML18012A4291996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Shearon Harris Nuclear Power Plant.W/961113 Ltr ML18012A4001996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Shearon Harris Nuclear Power Plant.W/961014 Ltr ML18012A3601996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Shearon Harris Nuclear Power Plant.W/960911 Ltr ML18012A3321996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Shearon Harris Nuclear Power Plant.W/960812 Ltr ML18012A2951996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Shearon Harris Nuclear Power Plant Unit 1.W/960711 Ltr ML18012A2731996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Shearon Harris Nuclear Power Plant.W/960614 Ltr ML18012A2441996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Harris Nuclear Plant.W/960513 Ltr ML18012A2091996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Harris Nuclear Plant.W/960410 Ltr ML18012A1711996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Harris Nuclear Plant.W/960311 Ltr ML18012A1271996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Shearon Harris Nuclear Power Plant.W/960209 Ltr ML18011B0971995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for SHNPP.W/960110 Ltr ML18011B0821995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Shearon Harris Nuclear Power Plant.W/951213 Ltr ML18011B0491995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Shearon Harris Nuclear Power Plant.W/951109 Ltr ML18011B0261995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Harris Nuclear Plant.W/951012 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18017A9181999-10-0808 October 1999 LER 99-008-00:on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With 991008 Ltr ML18017A9151999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18017A8671999-09-10010 September 1999 LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr ML18017A8621999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr ML18016B0481999-08-0404 August 1999 LER 99-006-01:on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised ML18017A8361999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr ML18016B0151999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Shearon Harris Npp. with 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18016A9801999-06-0404 June 1999 LER 99-006-00:on 981124,failed to Comply with TS 4.0.4 & TS 3/4.6.3, Civ. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Will Be Revised.With 990604 Ltr ML18016A9851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990614 Ltr ML18017A8981999-05-12012 May 1999 Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines. ML18016A9581999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML18016A9111999-04-12012 April 1999 LER 99-005-00:on 990313,plant Exceeded ESFAS TS 3.3.2,Action 21.Caused by Inadequate Procedure Rev Preparation.Licensee Revised Applicable Maint Surveillance Test Procedure (MST-10072) to Identify TS Required Actions.With 990412 Ltr ML18016A8971999-04-0808 April 1999 LER 99-004-00:on 990312,unit Trip Was Noted.Caused by Degraded Condition of SG Water Level Flow Control Valve. Replaced Positioners on All Three FW Regulating Valves.With 990408 Ltr ML18016A8941999-04-0505 April 1999 Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760 ML18016A9101999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr ML18016A8661999-03-31031 March 1999 Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept. ML18017A8931999-02-28028 February 1999 Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant. ML18016A8551999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with 990312 Ltr ML18016A8261999-02-22022 February 1999 LER 99-003-00:on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With 990222 Ltr ML18016A8531999-02-18018 February 1999 Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP 'C' & 'D'. ML18016A8111999-02-12012 February 1999 LER 99-002-00:on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With 990212 Ltr ML18016A7971999-02-0505 February 1999 LER 99-001-00:on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With 990205 Ltr ML18022B0631999-02-0404 February 1999 Rev 0 to Nuclear NDE Manual. with 28 Oversize Uncodable Drawings of Alternative Plan Scope & 4 Oversize Codable Drawings ML20202J1161999-02-0101 February 1999 SER Accepting Relief Requests Associated with Second 10-year Interval Inservice Testing Program ML18016A8041999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With 990211 Ltr ML18016A7941999-01-29029 January 1999 LER 98-004-01:on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor ML18016A7801998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Shearon Harris Npp. with 990113 Ltr ML18016A7671998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr ML18016A9731998-11-28028 November 1998 Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With 990527 Ltr ML18016A8351998-11-28028 November 1998 ISI Summary 8th Refueling Outage for Shearon Harris Power Plant,Unit 1. ML18016A7411998-11-25025 November 1998 Rev 1 to Shnpp Cycle 9 Colr. ML18016A7211998-11-17017 November 1998 LER 98-007-00:on 981023,turbine Control Anomaly Caused Manual Rt.Caused by Failure to Incorporate Verbal Vendor Guidance in Operating Procedures.Addl Vendor Guidance Will Be Verified & Added to Procedures.With 981117 Ltr ML18016A7071998-11-0303 November 1998 Rev 0 to Harris Unit 1 Cycle 9 Colr. ML18016A7201998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr ML20154F8701998-10-0606 October 1998 Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves ML18016A6201998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr ML18016A5971998-09-21021 September 1998 Rev 1 to Harris Unit 1 Cycle 8 Colr. ML18016A5881998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With 980914 Ltr ML18016A5071998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant.W/980811 Ltr ML18016A9431998-07-0707 July 1998 Rev 1 to QAP Manual. ML18016A4841998-07-0707 July 1998 LER 97-002-01:on 970207,determined That Cold Weather Conditions Resulted in Mfiv Being Potentially Inoperable During Period 970117-20.Caused by Inadequate Design of HVAC Sys.Implemented Mods to Steam Tunnel HVAC Sys ML18016A9371998-06-30030 June 1998 Technical Rept on Matl Identification of Spent Fuel Piping Welds at Hnp. ML18016A4861998-06-30030 June 1998 Monthly Operating Rept for June 1998 for SHNPP.W/980715 Ltr ML18016A4701998-06-30030 June 1998 LER 97-021-03:on 980210,discovered That SFP Water Level Had Not Been Verified Greater than 23 Feet Above BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements. Will Submit TS Change Request to Revise TS 3.9.1.11 ML18016A4491998-06-0808 June 1998 LER 98-006-00:on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling each.W/980608 Ltr ML18016A4521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant.W/980612 Ltr ML18016A7711998-05-26026 May 1998 Non-proprietary Rev 2 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris Spent Fuel Pools 'C' & 'D'. 1999-09-30
[Table view] |
Text
Sheet lof 3 Docket No;.
Status Date ~11 30 80 PWR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 1 Schedule Dates Percent Actual I-J Numbers Start ~Com lets ~Com lets 'om letiou Data 0 7805 2 1 84 4184 0 7810 5 1 82 5 1 84 0 7520 2180" 10182 0 7730 3 1 82 12183 7730 7815 12 1 83 1 1 84 0 7405 4 1 79 10183 48 0 7820 5 1 84 0 7410 2182 0 7415 12 1 83 0 7420 7 1 80 12 1 83 0 7475 2 1 84 0 7735 6 1 81 4184 0 7425 2 1 84 0 7740 6 1 81 4 1 84 0 7430 2 1 84 0 7745 '4184 0 7435 2 1 84 0 7750 4 1 84 0 7440 2 1 84 0 7755 4 1'84 0 7155 9 28 79 8182 50 7155 7445 7803 7305 7305 7825 1 1 2 7310 7455 1 82 7205 7510 3 1
~2
- 7060 7150 1 27 78 15 7 'L~
- 7150 7160 8 15 78 111 8 ~10
- Indicates Major Milestones x Indicates Change in Date TOTAL PROJECT CONSTRUCTION COMPLETION PERCENTAGE 36.9%
Sheet 2 of 3 Docket No.
Status Date ~11 30 80 PWR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 1 Schedule Dates Percent Actual I-J Numbers Start ~Com late ~Com 1ete Com 1ettoo Date
- 7200 7200 7300 ll 1 78 12/1/79 82 25 12 1 4 1 80
- 7515 7700 12 15 83 2 1 84
- 7950 7990 6 1 84 3 1 85 7524 7525 6 1 83 1 1 84 7628 7630 2184 5 1 84 7529 7530 6183 1184 7623 7625 2 1 84 5184 7459 7460 6 1 83 1 1 84 7638 7640 2 1 84 5/1 84 7534 7535 6 1 83 1 1 84 7643 7645 2 1 84 5184 7080 7170 1 1 81 12 1 Sl 7446 7540 4 1 83 1 1 84 7648 7650 2184 5 1/84 7544 7545 6 1 83 1/1/84 7658 7660 2 1 84 5/1/84 7055 7056 12 1/78 9/1/81 75 7056 7085 ll/1/Sl 11/1/82 7301 7302 6/1/83 10/15/83 7464 7465 6/1/83 1 1/84 7663 7665 2/1/84 5 84 7090 7105 1/1/81 10 183 7105 7680 10/1/83 84
- Indicates Major Milestones x Indicates Change in Date
/
Sheet 3 of Docket No.
Status Date ~11 30 00 PWR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 1 Schedule Dates Percent Actual I-J Numbers Start ~Com lets ~Com lets 'Com letloa Date 7633 7635 2184 5 1 84 0 7560 6183 1 1 84 7653 7655 '2 1'84'2 5 1 84 7351 7360 1 80 5 1 83 0 7365 4 1 80 6 1'81 7564 7565 '6/1 83 1 1 84 0 7280 9/1 80 12 1 82 0 7449 5 1 80 8 1 82 0 7570 6/1/83 1 1 84 7245 7325 6/1/80 12 1 82 7574 7575 6/1/83 1 1/84 7025 7230 2/1/78 5179 68 7230 7335 8/1/80 12 1/82 7674 7675 6/1/8 3 1/1 84 7255 7340 8/1/80 12/1/82 0 7685 1 1/84 7125 7350 5/1/81 12/1/82 '2 0 7670 10/15 83 0 7315 '1/1/82 5/1/82 0 7590 10 15/83'1 7030 7345 5/1/82 1/82 0 7690 10 15 83 0 7115 2/20/78 10182 7115 7470 3/1/80 11 1 83 7035 7235 6/1/78 3179 72 7235 7240 3/1/79 6 1 81 7240 7355 6/1/80 12/1 83 7040 7110 2/1/78 3/1 83 63 7110 7505 N/S 6/1/83 7505 7895 6/1/83 5/1/84 7045 7111 4 20/78 9/1/79 84 7111 7112 1/80 1/15/83 7111 7113 7 1 80 4 1 82 x Indicates Change in Date
Sheet 1 of 3 Docket No~
Statue Date '~l'1 30/80 PWR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 2 Schedule Dates Percent Actual I-J Numbers Start ~Cam late 0 7805 3 1 84 5 1 87 0 7810 N S 5 1 87 0 7520 4 1 81 12 1 82 0 7730 N S 12 1 86 7730 7815 12 1 86 1 1 87 0 7405 10 1" 84 2 1 87 0 7820 5 1 87 0 7410 4 1 85 12 1 85 0 7415 3184 2 1 87 0 7420 6 1 84 2 1 87 0 7475 4 1 84 2 1 87 0 7735 6 1 82 4 1 87 0 7425 8 1 84 2 1 87 0 7740 N S 4 1 87 0 7430 1185 2 1 87 0 7745 "N S' 4 1'87 0 7435 S 2 1 87 0 7750 N S 4 1 87 0 7440 N S 12 1 86 0 7755 4 1 87 0 7155 9/28 79 7 1 82 7155 7445 7 1 82 3186 7803 7305 9/1/84 5185 7305 7825 5/1/85 1 1 86 7310 7455 4/1/84 11 1/86 7205 7510 10/1/83 1 1 87
- 0 7005 1/4/74 1/21/74 100 1 24 74
- 7005 7015 1/24/74 10/15/74 100 10 15 74
- 7015 7050 10/15/74 3/1/76 100 3176
~7050
- 7150 7060 7150 7160 3/1/76 1/27/78 2/1/80 6/1/81'0 1/27/78 2/1/80 100 88 1/27/78
- Indicates Ma)or Milestones x Indicates Change in Date TOTAL PROJECT CONSTRUCTION COMPLETION PERCENTAGE 3.7%
Sheet 2 of 3 Dot%at
'Data 11/130 Ho'tatoa 80','VR CONSTPQCTION MILESTONES AHD ACTIVITIES POR
~+0,15 ~IT 2 Schedule Dates Percent hctua1 I-J Ã "bers Sea. t Cote1ete ~Co 1 ate Coo letio" Date
<<7300 7450 9/1/83 8/1/8 6
- 7450 7500 8/1/8 6 ll/1/86
<<7500 7515 11/1/66 12/15/86
<<7800 7950 4187 6 1 87
<<7950 7990 6 1 87 3 1 88 7524 7525 6 1 86 1 1 87 7628 7630 2 1 87 5187 7529 7530 6 1 86 1 1 67 7623 7625 2187 5/1 87 7459 7460 6186 1/1/87 7638 7640 2 1 87 5/1/87 7534 7535 6 1 66 1 1 87 7643 7645 2 1 87 5 1 87 7080 7170 3 1 64 2/1 86 7446 7540 5186 8/1/86 7648 7650 2/1 87 5/1/87 7544 7545 6/1/86 1/1/87 7658 7660 2/1/87 5/1/8 7 7055 7056 6/1/8 1 3/1/85 7056 7085 3/1/85 1/1/86 7301 7302 8/1/8 6 12 15/66 7464 7465 6/1/8 6 1/1/87 7663 7665 2 1/87 5 87 7090 7105 3 1 65 7105 7680 10 1 1187
<< Indicates Ywgor YZIestones x Indicates Change in Date
Sheet 3 of Dotket No.
Status Date ~11 30 80 PWR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 2 Schedule Dates Percent Actual I-J Numbers Steat ~Coe lets 7633 7635 2/1/87 5/1/87 0 7560 7653 7655 7351 7360 0 7365 7564 7565 0 7280 0 7449 0 7570 7245 7325 7574 7575 7025 7230 7230 7335 6 4 7674 7675 1 8 7255 7340 10183 218 0 7685 6 1 86 7125 7350 10 183 2 1 0 7670 N S 121 6 0 7315 4185 0 7590 N S 12 1 7030 7345 0 7690 N S 0 7115 2 2 7115 7470 3 1 82 7035 7235 '41 2 7235 7240 7240 7355 7040 7110 2 1 8 7110 7505 318 7505 7895 618 7045 7111 420 8 7111 7112 5 1 80 1158 x Indicates Change in Date
Sheet 1 of 3 Do&et tto.
statue Date 1~1/30 80 i PRR CONSTRUCTION MILESTOKES AND ACTIVITIES FOR HARRIS UNIT 3 Schedu1e Dates Percent Actual I-J Numbers Start Como1ete ~Com late "
Comp1ettoo Date 0 7805 7/1/78 5/1/93 0 7810 5/1/93 0 7520 2/1/8 6 12/1/9 2 0 7730 N/S 7730 7815 5/1/93 0 7405 2/1/86 2/1/9 3 0 7820 N/S 0 7410 2/ /88 l2/1/93 0 7415 7/1/86 2/1/93 0 7420 2/1/86 2/1/93 0 7475 86 2/1/93 0 "7735 4/ /93 0 7425 87 2 1/93 0 7740 6/1/80 4/1/93 0 7430 /88 2/1/93 0 7745 /1/93 0 7435 /93
~ 0 7750 /9 0 7440 /9 0 7755 0 7155 3/1/91 7191 7155 7445 7/1/91 3 1/92 7803 7305 1/1/90 9/1/90 7305 7825 9/1/90 3/1/91 7310 7455 9/1/89 3/1/91 7205 7510 2/1/89 1/1/93
%0 7005 1/24/74 47005 7015 100 10/15/74
~- *7150 7160 8/1/86 11/1/86
- Indicates Ma)or Milestones x Indicates Change in Date TOTAL PROJECT CONSTRUCTION COMPLETION PERCENTAGE Less Than 1%
~ ~ ~ ~
Sheet 2 of 3 Docket Hok Statue Date 1~1 30/80-i PVR CONSTRUC'XIOH MLESTOhES hhD hCTZVITIES POR RC~ZZS UhIT 3 Schedu1e Dates Percent hctua1 I-J K hers Start Co=elate ~Co= late Co"oletion Date
+7300 7450
+7450 7500
~7950 7990 6 1 93 3194 7524 7525 1 2 1 1 93 7628 7630 2 1 3 1 93 7529 7530 6 1 92 1 1 93 7623 7625 2 1 93 5 1 93 7459 7460 6 1 92 1 1 93 7638 7640 2 1 93 5 1 93 7534 7535 6 1 92 1 1 93 7643 7645 2193 5193 7080 7170 10 1 90 3191 7446 7540 5192 1 1 93 7648 7650 2193 5193 7544 7545 6 1 92 1 1 93 7658 7660 2193 5/1 93 7055 7056 2 1 85 3/1/67 7056 7085 11/1 86 7/1/90 7301 7302 8 1/92 12/15/9 2 7464 7465 6/1/9 2 1/1/9 3 7663 7665 2/1/93 5/1/9 3 7090 7105 3/1/91 10/1/9 2 7105 7680 10/1/92 1/1/93
- Indicates Ya)or YXlestones x Indicates Chanse in Date
L Sheet 3 of 3 Docket No.
Status Date ~11 el~0 PWR CONSTRUCTION MILESTONES AND ACTIVITIES FOR HARRIS UNIT 3 Schedule Dates Percent Actual I-J Numbers Start ~Com late 7633 7635 2/1 93 5 1 93 0 7560 6/1 93 7653 7655 92'/1/03 5 1 93 7351 7360 6/1/90 6192 0 7365 4/1/90 8191 7564 7565 6/1/92 1/1 93 0 7280 2/1/89 2 1 92 0 7449 4 1 80 0 7570 7245 7325 11 1 90 2 1 7574 7575 6 1 92 93 7025 7230 2187 90 7230 7335 11 1 90 2 1 92 7674 7675 6192 93 7255 7340 11 1 90 2 1 92 0 7685 93 7125 7350 11190 2 1 92 0 7670 12 1 92 0 7315 4191 8 1 91 0 7590 12 1 92 7030 7345 5 1 91 91 0 7690 12 1 0 7115 2 20 78 4 1 7115 7470 4 1 80 8 1 82 7035 7235 4 1 88 8 1 89 7235 7240 8 1 89 7240 7355 11 1 91 2 1 93 7040 7110 2178 3 1 83 7110 7505 3 1 83 6 1 86 7505 7895 6 1 86 92 7045 7111 420 78 5 1 80 7111 7112 5/1/80 1 15 83 x Indicates Change in Date
I l
k
Sheet 1 of 3 Docket Ho.
Status Date ~ll 3~0 80 PttlR CONSTRUCTION MILESTOhES AND ACTIVITIES FOR
'HA."eRIS UNIT 4 f
I I
Schedule Dates
~ t Percent Actual I-J Numbeis aa State Cooolete ~Coo pete 'oooletioo Date 0 7805 0 7810 0 7520 2 1 0 7730 an 7730 7815 12 l 0 7405 1 1 87 / 0 0 7820 a
p 7410 118 0 7415 6 1 87 0 7420 1187 0 7475 7187 0 7735 0 7425 0 7740 0 7430 0 7745 0 7435
,0 7750 0 7440 0 7755 0 7155 7 1 88 7155 7445 7 1 89 7803 7305 1188 1 8 7305 7825 9188 5190 7310 7455 8 1 87 11 1 90 7205 7510 12/1 86 1 1 91 Ap 7005
- 7060 7150 1/27/78 11 1 84
- Indicates Ma)or Ydlestones x Indicates Change in Date TOTAL PROJECT CONSTRUCTION CO<iPLETION PERCENTAGE Less Than 18
Sheet 2 of 3 I Docket Noe Statoa Date~!/30/80, R'R COHSTRUCTIOE KQZSTOhES hhD hCTIVETTES FOR EPZRIS UKIT 4 Schedu1e Dates Percent hctua1 E-3 Nv.=bers State Co ale-te ~Co= lett 'otoletfoo Date
+7160 7200 2185 4187 47200 7300 4187 8 1 87
+7300 7450 8 1/87 8190
~7450 7500 8190 11 1 90
+7500 7515 11/1/90 12 15 90
. 47515 7700 12/1S/90 2/1 91
~7950 7990 7524 7525 1 90 I 1 91 7628 7630 2 1 91 7529 7530 6 1 91 1 1 91 7623 7625 2 1 91 5 1 91 7459 7460 6 1 90 1191 7638 7640 2 1 91 5 1 91 7534 7535 6190 1 1 91 7643 7645 2191 5191 7080 7170 7185 12 1 86 7446 7648 7540 7650 3 1 90 2 1 91 ll 1 90 5 1 91 7544 7545 6190 1 1 91 7658 7660 2/1/91 5/1 91 7055 7056 2 1/85 3/1/89 7056 7085 3/1/89 1/1/91 7301 7302 8/1/90 12/15/90 7464 7465 6/1/90 1/1/91 7663 7665 2/1/91 5/1/91 7090 7105 I/1/89 10/1/90 7105 7680 10/1/90 1/1/91
- Indicates Ns)or M,lestones x Indicates Change fn Da te
Sheet 3 of Docket No.
Status Date ~11 30 00 PWR CONSTRUCTION MILESTONES AND ACTIVITIES FOR
'HARRIS UNIT 4 Schedule Dates Percent Actual I-J Numbers Start ~Com lets 'Com late 7633 7635 2 1'91 5191 0 7560 1 1'91 7653 7655 2/1/91' 5191 7351 7360 5/1 84 5 1 87 0 7365 2 1/90 7564 7565 2/1/85'/1/90 1191 0 7280 '/1/87 2 1/90 0 7449 4/1/80 8/1 82 0 7570 1/1/91 7245 7325 8/1/88 2/1/90 7574 7575 6/1/90 1/1/91 7025 7230 7/1/85'/1/88 8/1/88 7230 7335 2/1/90 7674 7675 6/1/90 1/1/91 7255 7340 8 1'88 2 1 90 0 7685 1 1 91 7125 7350 8188 2190" 0 7670 12 1'0 0 7315 2 1 86 8 1 89 0 7590 12'1 90 7030 7345 '1 1 88' 3'1 89 0 7690 12 1 87 0 7115 20 78 3 1 80 42 7115 7470 '3 1 80 1 82 7035 7235 '1'1 86 1 1 88 7235 7240 1 1 88 6190 7240 7355 6190 2191 7040 7110 2178 121 78 7110 7505 121 78 6 1 82 7505 7895 6 1 82 5 1 91 7045 7111 4 20 78 5 1 80 7111 7112 5 1 80 1 15 83 x Indicates Change in Date
0