ML11202A178 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, List of Affected Pages | |
ML11202A179 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 1.0, Introduction | Safe Shutdown Tornado Missile Probabilistic Risk Assessment Coatings Incorporated by reference Turbine Missile Pressure Boundary Leakage Backfit |
ML11202A180 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 4.0, Reactor | |
ML11202A181 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 5.0, Reactor Coolant System and Connected Systems | Shutdown Margin Weld Overlay Hydrostatic Nondestructive Examination Liquid penetrant |
ML11202A182 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 6.0, Engineered Safety Features | Safe Shutdown Loop seal Coatings |
ML11202A183 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 8.0, Electrical Power | Safe Shutdown Earthquake |
ML11202A184 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 9.0, Auxiliary Systems | |
ML11202A185 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 10.0, Steam and Power Conversion System | Hydrostatic |
ML11202A186 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 7.0, Instrumentation and Controls | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Scram Discharge Volume Feedwater Controller Failure Earthquake Fuel cladding Power change Coast down |
ML11202A189 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 12.0, Radiation Protection, Beginning Through Table 12A-4(1) | High Radiation Area |
ML11202A193 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 13.0, Conduct of Operations Tables | High Radiation Area Fire Protection Program |
ML11202A194 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 14.0, Initial Test Program | Shutdown Margin Hydrostatic Scram Discharge Volume |
ML11202A195 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 15.0, Accident and Transient Analysis | |
ML11202A196 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 16.0, Technical Specifications | |
ML11202A197 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 17.0, Quality Assurance | |
ML11202A198 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Appendix a | |
ML11202A205 | 29 June 2011 | Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification Bases | Safe Shutdown Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Squib Qualified Offsite Circuit Missed surveillance Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Spiral reload Overtravel Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Power change Coast down |
ML14171A360 | 20 June 2014 | Defueled Safety Analysis Report Update, Revision 7 | Safe Shutdown Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Zebra Mussel Emergency Lighting Process Control Program Earthquake Control of Heavy Loads Fuel cladding Fire Protection Program Backfit Siren |
ML17179A504 | 21 June 2017 | Updated Final Safety Analysis Report (Ufsar), Revision 12 and Fire Protection Report (Fpr), Amendment 21 | Safe Shutdown Hydrostatic Incorporated by reference Aging Management Surveillance Frequency Control Program License Renewal |
ML17179A519 | 21 June 2017 | Revision 12 to Updated Final Safety Analysis Report, List of Effective Pages Pages | |
ML17179A520 | 21 June 2017 | Revision 12 to Updated Final Safety Analysis Report, Chapter 01, Introduction and General Description of Plant | Safe Shutdown Tornado Missile Probabilistic Risk Assessment Coatings Incorporated by reference Turbine Missile Pressure Boundary Leakage Backfit |
ML17179A529 | 21 June 2017 | Revision 12 to Updated Final Safety Analysis Report, Chapter 05, Reactor Coolant System and Connected Systems | |
ML17179A538 | 21 June 2017 | Revision 12 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Hydrostatic |
ML17179A629 | 21 June 2017 | Revision 12 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | |
ML17179A633 | 21 June 2017 | Revision 12 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | |
ML17179A635 | 21 June 2017 | Revision 12 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program | Shutdown Margin Hydrostatic Scram Discharge Volume |
ML17179A639 | 21 June 2017 | Revision 12 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications | |
ML17179A641 | 21 June 2017 | Revision 12 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | |
ML17179A642 | 21 June 2017 | Revision 12 to Updated Final Safety Analysis Report, Appendix a, UFSAR Supplement | |
ML17191A300 | 10 July 2017 | Final Safety Analysis Report | Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML17191A301 | 10 July 2017 | Final Safety Analysis Report | Ultimate heat sink Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting Design basis earthquake Earthquake Fuel cladding |
ML17191A306 | 10 July 2017 | Updated Final Safety Analysis Report - List of Effective Pages Current Through, Revision 0 | Ultimate heat sink Emergency Lighting |
ML18079B036 | 21 June 2017 | Redacted Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 02, Site Characteristics | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML19183A103 | 21 June 2019 | Attachments a to G | Safe Shutdown Reactor Vessel Water Level Fire Barrier Aging Management Surveillance Frequency Control Program License Renewal |
ML21179A027 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Safe Shutdown Shutdown Margin Weld Overlay Hydrostatic Nondestructive Examination Feedwater Controller Failure Earthquake Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Unidentified leakage Unidentified leak Power Uprate |
ML21179A028 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Incorporated by reference Finite Element Analysis Tornado-Generated Missile Tornado Generated Missile Abnormal operational transient Tornado Missile Protection Surveillance Frequency Control Program Design basis earthquake Excess Flow Check Valve TORMIS Code Reconciliation Earthquake Control of Heavy Loads Turbine Missile Liquid penetrant Through-Wall Leakage Power change Power Uprate |
ML21179A031 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 8, Electrical Power | Safe Shutdown Emergency Lighting Tornado Missile Protection Scram Discharge Volume Earthquake |
ML21179A032 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown Health Physics Network Shutdown Margin Ultimate heat sink Grab sample Fire Barrier Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Operating Basis Earthquake Squib Nuclear Accident Reporting System Emergency Lighting Surveillance Frequency Control Program Earthquake Control of Heavy Loads Power-Operated Valves Power Operated Valves Biofouling Accidental discharge Fire Protection Program Power change Operability Assessment Unidentified leakage Power Uprate |
ML21179A033 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 4, Reactor | Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Hydrostatic Minimum Critical Power Ratio Scram Discharge Volume Feedwater Controller Failure MELLLA Overtravel Fuel cladding Power change |
ML21179A034 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Tornado Missile Probabilistic Risk Assessment Coatings Emergency Lighting Incorporated by reference Earthquake Turbine Missile Fuel cladding Pressure Boundary Leakage Backfit |
ML21179A035 | 21 June 2021 | 4 to Final Safety Analysis Report, Appendix a UFSAR Supplement | Fire Barrier Coatings Nondestructive Examination Aging Management Moisture barrier Biofouling |
ML21179A037 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features | Safe Shutdown Reactor Vessel Water Level Loop seal Mission time Stroke time Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Surveillance Frequency Control Program MELLLA Hardened vent Fuel cladding Recently irradiated fuel Flow Induced Vibration Coast down |
ML21179A038 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Hydrostatic Squib Scram Discharge Volume Feedwater Controller Failure Earthquake Fuel cladding Power change Coast down Power Uprate Failure to Scram |
ML21179A039 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Stroke time Anticipated operational occurrence Hydrostatic Feedwater Controller Failure Fast acting solenoid valve Turbine Missile |
ML21179A040 | 21 June 2021 | 4 to Final Safety Analysis Report, Cover and List of Affected Pages | |
ML21179A041 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Safe Shutdown Loop seal Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Tornado Generated Missile Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Code Reconciliation Fuel cladding Accidental discharge |
ML21179A043 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 16, Technical Specifications | |
ML21179A044 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 15, Accident and Transient Analysis | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Stroke time Anticipated operational occurrence Hydrostatic Scram Discharge Volume Feedwater Controller Failure MELLLA Fuel cladding Power change Coast down Power Uprate |
ML21179A045 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 14, Initial Test Program | Shutdown Margin Hydrostatic Scram Discharge Volume |
ML21179A046 | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 17, Quality Assurance | |