Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML11202A17829 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, List of Affected Pages
ML11202A17929 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 1.0, IntroductionSafe Shutdown
Tornado Missile
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Turbine Missile
Pressure Boundary Leakage
Backfit
ML11202A18029 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 4.0, Reactor
ML11202A18129 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 5.0, Reactor Coolant System and Connected SystemsShutdown Margin
Weld Overlay
Hydrostatic
Nondestructive Examination
Liquid penetrant
ML11202A18229 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 6.0, Engineered Safety FeaturesSafe Shutdown
Loop seal
Coatings
ML11202A18329 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 8.0, Electrical PowerSafe Shutdown
Earthquake
ML11202A18429 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 9.0, Auxiliary Systems
ML11202A18529 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 10.0, Steam and Power Conversion SystemHydrostatic
ML11202A18629 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 7.0, Instrumentation and ControlsSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Scram Discharge Volume
Feedwater Controller Failure
Earthquake
Fuel cladding
Power change
Coast down
ML11202A18929 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 12.0, Radiation Protection, Beginning Through Table 12A-4(1)High Radiation Area
ML11202A19329 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 13.0, Conduct of Operations TablesHigh Radiation Area
Fire Protection Program
ML11202A19429 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 14.0, Initial Test ProgramShutdown Margin
Hydrostatic
Scram Discharge Volume
ML11202A19529 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 15.0, Accident and Transient Analysis
ML11202A19629 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 16.0, Technical Specifications
ML11202A19729 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 17.0, Quality Assurance
ML11202A19829 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Appendix a
ML11202A20529 June 2011Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification BasesSafe Shutdown
Unanalyzed Condition
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Squib
Qualified Offsite Circuit
Missed surveillance
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Spiral reload
Overtravel
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Coast down
ML14171A36020 June 2014Defueled Safety Analysis Report Update, Revision 7Safe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Zebra Mussel
Emergency Lighting
Process Control Program
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Protection Program
Backfit
Siren
ML17179A50421 June 2017Updated Final Safety Analysis Report (Ufsar), Revision 12 and Fire Protection Report (Fpr), Amendment 21Safe Shutdown
Hydrostatic
Incorporated by reference
Aging Management
Surveillance Frequency Control Program
License Renewal
ML17179A51921 June 2017Revision 12 to Updated Final Safety Analysis Report, List of Effective Pages Pages
ML17179A52021 June 2017Revision 12 to Updated Final Safety Analysis Report, Chapter 01, Introduction and General Description of PlantSafe Shutdown
Tornado Missile
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Turbine Missile
Pressure Boundary Leakage
Backfit
ML17179A52921 June 2017Revision 12 to Updated Final Safety Analysis Report, Chapter 05, Reactor Coolant System and Connected Systems
ML17179A53821 June 2017Revision 12 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemHydrostatic
ML17179A62921 June 2017Revision 12 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
ML17179A63321 June 2017Revision 12 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations
ML17179A63521 June 2017Revision 12 to Updated Final Safety Analysis Report, Chapter 14, Initial Test ProgramShutdown Margin
Hydrostatic
Scram Discharge Volume
ML17179A63921 June 2017Revision 12 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications
ML17179A64121 June 2017Revision 12 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML17179A64221 June 2017Revision 12 to Updated Final Safety Analysis Report, Appendix a, UFSAR Supplement
ML17191A30010 July 2017Final Safety Analysis ReportSafe Shutdown Earthquake
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML17191A30110 July 2017Final Safety Analysis ReportUltimate heat sink
Probabilistic Risk Assessment
Operating Basis Earthquake
Emergency Lighting
Design basis earthquake
Earthquake
Fuel cladding
ML17191A30610 July 2017Updated Final Safety Analysis Report - List of Effective Pages Current Through, Revision 0Ultimate heat sink
Emergency Lighting
ML18079B03621 June 2017Redacted Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 02, Site CharacteristicsSafe Shutdown
Safe Shutdown Earthquake
Earthquake
ML19183A10321 June 2019Attachments a to GSafe Shutdown
Reactor Vessel Water Level
Fire Barrier
Aging Management
Surveillance Frequency Control Program
License Renewal
ML21179A02721 June 20214 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsSafe Shutdown
Shutdown Margin
Weld Overlay
Hydrostatic
Nondestructive Examination
Feedwater Controller Failure
Earthquake
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Unidentified leakage
Unidentified leak
Power Uprate
ML21179A02821 June 20214 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and SystemsSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Incorporated by reference
Finite Element Analysis
Tornado-Generated Missile
Tornado Generated Missile
Abnormal operational transient
Tornado Missile Protection
Surveillance Frequency Control Program
Design basis earthquake
Excess Flow Check Valve
TORMIS
Code Reconciliation
Earthquake
Control of Heavy Loads
Turbine Missile
Liquid penetrant
Through-Wall Leakage
Power change
Power Uprate
ML21179A03121 June 20214 to Final Safety Analysis Report, Chapter 8, Electrical PowerSafe Shutdown
Emergency Lighting
Tornado Missile Protection
Scram Discharge Volume
Earthquake
ML21179A03221 June 20214 to Final Safety Analysis Report, Chapter 9, Auxiliary SystemsSafe Shutdown
Health Physics Network
Shutdown Margin
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Operating Basis Earthquake
Squib
Nuclear Accident Reporting System
Emergency Lighting
Surveillance Frequency Control Program
Earthquake
Control of Heavy Loads
Power-Operated Valves
Power Operated Valves
Biofouling
Accidental discharge
Fire Protection Program
Power change
Operability Assessment
Unidentified leakage
Power Uprate
ML21179A03321 June 20214 to Final Safety Analysis Report, Chapter 4, ReactorShutdown Margin
Reactor Vessel Water Level
Anticipated operational occurrence
Hydrostatic
Minimum Critical Power Ratio
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Overtravel
Fuel cladding
Power change
ML21179A03421 June 20214 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of PlantSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Tornado Missile
Probabilistic Risk Assessment
Coatings
Emergency Lighting
Incorporated by reference
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Backfit
ML21179A03521 June 20214 to Final Safety Analysis Report, Appendix a UFSAR SupplementFire Barrier
Coatings
Nondestructive Examination
Aging Management
Moisture barrier
Biofouling
ML21179A03721 June 20214 to Final Safety Analysis Report, Chapter 6, Engineered Safety FeaturesSafe Shutdown
Reactor Vessel Water Level
Loop seal
Mission time
Stroke time
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Surveillance Frequency Control Program
MELLLA
Hardened vent
Fuel cladding
Recently irradiated fuel
Flow Induced Vibration
Coast down
ML21179A03821 June 20214 to Final Safety Analysis Report, Chapter 7, Instrumentation and ControlsSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Anticipated operational occurrence
Hydrostatic
Squib
Scram Discharge Volume
Feedwater Controller Failure
Earthquake
Fuel cladding
Power change
Coast down
Power Uprate
Failure to Scram
ML21179A03921 June 20214 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Hydrostatic
Feedwater Controller Failure
Fast acting solenoid valve
Turbine Missile
ML21179A04021 June 20214 to Final Safety Analysis Report, Cover and List of Affected Pages
ML21179A04121 June 20214 to Final Safety Analysis Report, Chapter 11, Radioactive Waste ManagementSafe Shutdown
Loop seal
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Tornado Generated Missile
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Code Reconciliation
Fuel cladding
Accidental discharge
ML21179A04321 June 20214 to Final Safety Analysis Report, Chapter 16, Technical Specifications
ML21179A04421 June 20214 to Final Safety Analysis Report, Chapter 15, Accident and Transient AnalysisSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Hydrostatic
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Fuel cladding
Power change
Coast down
Power Uprate
ML21179A04521 June 20214 to Final Safety Analysis Report, Chapter 14, Initial Test ProgramShutdown Margin
Hydrostatic
Scram Discharge Volume
ML21179A04621 June 20214 to Final Safety Analysis Report, Chapter 17, Quality Assurance