ML21179A043
From kanterella
Jump to navigation
Jump to search
ML21179A043 | |
Person / Time | |
---|---|
Site: | Dresden |
Issue date: | 06/21/2021 |
From: | Exelon Generation Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML21179A042 | List:
|
References | |
RS-21-066 | |
Download: ML21179A043 (2) | |
Similar Documents at Dresden | |
---|---|
Category:Technical Specifications
MONTHYEARML24136A1322024-07-30030 July 2024
[Table view]Transmittal Letter for Renewed License ML24138A0572024-06-26026 June 2024 – Issuance of Amendment Nos. 285 and 278 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23032A3602023-03-22022 March 2023 Issuance of Amendment Nos. 279 and 272 New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies RS-22-065, License Amendment Request Regarding Transition to GNF3 Fuel2022-08-18018 August 2022 License Amendment Request Regarding Transition to GNF3 Fuel ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Va ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21179A0432021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 16, Technical Specifications ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems ML18137A2712018-06-29029 June 2018 Issuance of Amendments Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies (Cac. Nos. MF9687 and MF9688; EPID L-2017-LLA-0228) (RS-17-060) RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML17238A1222017-08-26026 August 2017 Transmittal of Previously Omitted Proposed Technical Specification Page 3.1-2, and Figures 2.1.1, 3.3.1, 3.3.2, 3.5.1, 3.6.1 ML17180A1212017-06-21021 June 2017 Technical Specification Bases RS-17-082, Dresden Nuclear Power Station, Units 2 & 3, Technical Specification Bases2017-06-21021 June 2017 Dresden Nuclear Power Station, Units 2 & 3, Technical Specification Bases ML17151A8002017-05-31031 May 2017 Amendment No. 82, Section 1.1 Safety Limit Bases ML16111A1042016-05-11011 May 2016 Issuance of Amendments to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core SLs (CAC Nos. MF6640-MF6644) ML15343A1262016-04-29029 April 2016 Issuance of Amendments to Amend Facility Operating License Nos. DPR-19 and DPR-25 to Revise Technical Specifications to Support Use of a New Nuclear Criticality Safety Analysis Methodology RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings2016-02-0303 February 2016 County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings ML15324A4392015-12-17017 December 2015 Issuance of Amendments (CAC Nos. MF5471-MF5476) ML15183A3512015-08-0505 August 2015 Issuance of Amendments Concerning Adding Topical References to Technical Specifications (TAC Nos. MF3359, MF3363, MF3361, and MF3362)(RS-13-288) ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML14323A5222015-04-0808 April 2015 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training ML14085A5322014-07-21021 July 2014 Issuance of Amendments Adoption of TSTF-522 Ventilation System Surveillance Requirements RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.2013-12-19019 December 2013 Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2013-09-0303 September 2013 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process ML0925101522009-10-20020 October 2009 License Amendments, Modify the Technical Specifications to Risk-informed Requirements Regarding Selected Required Action End States as Provided in Technical Specification Task Force (TSTF) Change Traveler TSTF-423, Revision 0 RS-09-036, Request for License Amendment to Technical Specification (TS) 3.4.5, RCS Leakage Detection Instrumentation, TS 5.6.5, Core Operating Limits Report (Color), and Renewed Facility Operating License2009-04-0707 April 2009 Request for License Amendment to Technical Specification (TS) 3.4.5, RCS Leakage Detection Instrumentation, TS 5.6.5, Core Operating Limits Report (Color), and Renewed Facility Operating License ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 ML0824015232008-08-22022 August 2008 Tech Spec Pages for Emergency Amendment 221 Regarding Drywell Floor Drain Sump Monitoring System ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0821301362008-07-25025 July 2008 Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Tech Spec Pages for Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0828300312008-07-22022 July 2008 License Amendment, Modify Technical Specification Requirements Related to Turbine Condenser Vacuum - Low Scram Instrumentation Setpoint.-TS Page ML0821105462008-07-22022 July 2008 Technical Specifications, Modifcations Related to Turbine Condenser Vacuum - Low Scram Instrumentation Setpoint RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.2008-04-21021 April 2008 Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. ML0805903732008-03-20020 March 2008 Technical Specifications 5.5, Programs and Manuals, Pages 5 .5-12 Through 5 .5-14, Dresden Units 2 and 3, to CR Habitability Amendment ML0808604742008-03-20020 March 2008 Technical Specifications, Amendment No. 233 and 218 for Dresden and Quad Cities - TS Pages to Dresden/Quad CR Habitability Amendment, 3.7 Plant Systems and 5.5 Programs and Manuals ML0805904092008-03-20020 March 2008 Technical Specifications 3.7, Plant Systems, Pages 3 .7 .4-1 Through 3 .7 .4-3, Dresden Units 2 and 3, to CR Habitability Amendment ML0805903992008-03-20020 March 2008 Technical Specifications 3.7, Plant Systems, Pages 3 .7 .4-1 Through 3 .7 .4-3, Quad Cities Units 1 and 2, to CR Habitability Amendment ML0805903842008-03-20020 March 2008 Technical Specifications 5.5, Programs and Manuals, Pages 5 .5-12 Through 5 .5-14, Dresden Units 2 and 3, to CR Habitability Amendment RS-08-012, Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications2008-02-28028 February 2008 Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications ML0733310942007-11-19019 November 2007 Tech Specs for Amendments to Provide Consistency with Quality Assurance Topical Report ML0731104572007-11-0606 November 2007 Technical Specifications Pages for Amendments 224 and 216 Regarding Safety Limit Minimum Critical Power Ratio RS-07-118, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process2007-10-0909 October 2007 Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process RS-07-078, Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators2007-07-19019 July 2007 Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0717303032007-06-21021 June 2007 Dresden. Units 2 and 3 - Tech Spec Page for Amendments 223 and 215 to Increase the Dresden Safety Valve As-Found Setpoint Tolerance from 1 Percent to 3 Percent 2024-07-30 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24122C6302024-05-0707 May 2024
[Table view]UFSAR Chapter 12, Radiation Protection Redacted ML24122C6292024-05-0707 May 2024 UFSAR Chapter 02, Site Characteristics Redacted ML23180A0342023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23180A0362023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23180A0372023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23180A0252023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23180A0202023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23180A0272023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23180A0302023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML23180A0212023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems ML23180A0312023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML23180A0392023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23180A0322023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML23180A0332023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Appendix a Supplement ML23180A0292023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power ML23180A0382023-06-21021 June 2023 5 to Updated Final Safety Analysis Report - List of Affected Pages ML23180A0192023-06-21021 June 2023 5 to Updated Final Safety Analysis Report and Amendment 24 to Fire Protection Report ML23180A0262023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 15, Accident and Transient Analysis ML23180A0352023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23180A0282023-06-21021 June 2023 5 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML21196A0082021-07-15015 July 2021 Redacted - Dresden, Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML21179A0472021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 13, Conduct of Operations ML21179A0462021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML21179A0452021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 14, Initial Test Program ML21179A0432021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 16, Technical Specifications ML21179A0442021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 15, Accident and Transient Analysis ML21179A0412021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML21179A0402021-06-21021 June 2021 4 to Final Safety Analysis Report, Cover and List of Affected Pages ML21179A0392021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML21179A0382021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML21179A0372021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML21179A0352021-06-21021 June 2021 4 to Final Safety Analysis Report, Appendix a UFSAR Supplement ML21179A0342021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML21179A0332021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 4, Reactor ML21179A0322021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML21179A0312021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 8, Electrical Power ML21179A0282021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML21179A0272021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems RS-19-067, Redacted - Dresden Nuclear Power Station, Units 1, 2 and 3, Updated Final Safety Analysis Report, Chapter 12, Figures2019-06-21021 June 2019 Redacted - Dresden Nuclear Power Station, Units 1, 2 and 3, Updated Final Safety Analysis Report, Chapter 12, Figures ML19183A1032019-06-21021 June 2019 Attachments a to G ML17191A3012017-07-10010 July 2017 Final Safety Analysis Report ML17191A3062017-07-10010 July 2017 Updated Final Safety Analysis Report - List of Effective Pages Current Through, Revision 0 ML17191A3002017-07-10010 July 2017 Final Safety Analysis Report ML17179A5042017-06-21021 June 2017 Updated Final Safety Analysis Report (Ufsar), Revision 12 and Fire Protection Report (Fpr), Amendment 21 ML18079B0362017-06-21021 June 2017 Redacted Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 02, Site Characteristics ML17179A6422017-06-21021 June 2017 Revision 12 to Updated Final Safety Analysis Report, Appendix a, UFSAR Supplement ML17179A6412017-06-21021 June 2017 Revision 12 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML17179A6392017-06-21021 June 2017 Revision 12 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML17179A6352017-06-21021 June 2017 Revision 12 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML17179A6332017-06-21021 June 2017 Revision 12 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations 2024-05-07 |
Text
DRESDEN UFSAR 16.0 TECHNICAL SPECIFICATIONS TABLE OF CONTENTS Page 16.0 TECHNICAL SPECIFICATIONS 16.0-1 16-i
DRESDEN - UFSAR 16.0 TECHNICAL SPECIFICATIONS The Technical Specifications for Dresden Station Units 2 and 3 were issued by the NRC as Appendix A of Operating Licenses DPR-19 and DPR-25. In accordance with 10 CFR 50.90 and 10 CFR 50.92, the Technical Specifications are maintained and modified by license amendments.
16.0-1
Retrieved from "https://kanterella.com/w/index.php?title=ML21179A043&oldid=3415077"