Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML032721604 | 25 September 2003 | Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.3-7 Through 2.3-15 | Ultimate heat sink |
ML032730610 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Figures B-1-12 Through Figure B-2-2 | Earthquake |
ML032730613 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Figures 2.1-20 Through Plate 1 | Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake |
ML032730615 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.1-3 Through 2.4-1 | |
ML032730616 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-2 Through 2.4-11 | |
ML032730617 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-12 Through 2.4-19 | Ultimate heat sink |
ML032730618 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-20 Through 2.5-5 | |
ML032730619 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.5-6 Through Chapter 3, Table 3.3-33 | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Earthquake Deep Dose Equivalent Fuel cladding |
ML070920204 | 31 January 2005 | Cps/Usar, Chapter 4, Reactor, Revision 11 | Shutdown Margin Anticipated operational occurrence Hydrostatic Nondestructive Examination Finite Element Analysis Scram Discharge Volume MELLLA Fuel cladding Power change Coast down |
ML070920206 | 31 January 2005 | Cps/Usar, Chapter 5, Reactor Coolant System and Connected System, Revision 11 | Reactor Vessel Water Level Packing leak Non-Destructive Examination Grab sample Stroke time Safe Shutdown Earthquake Weld Overlay Hydrostatic Nondestructive Examination VT-2 Abnormal operational transient Flow Accelerated Corrosion Stress corrosion cracking Earthquake Power-Operated Valves Fuel cladding Liquid penetrant Pressure boundary leak Coast down Unidentified leakage Unidentified leak Power Uprate Overspeed trip Subsequent actuation Water hammer |
ML070930225 | 31 January 2005 | Cps/Usar, Chapter 6, Engineered Safety Features, Revision 11 | Safe Shutdown High winds Reactor Vessel Water Level Stroke time Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Emergency Lighting Foreign Material Exclusion Power-Operated Valves Fuel cladding Liquid penetrant Scaffolding |
ML070930228 | 31 January 2005 | Cps/Usar, Chapter 7, Instrumentation and Control Systems, Revision 11 | |
ML070930229 | 31 January 2005 | Cps/Usar, Chapter 8, Electric Power, Revision 11 | Hot Short Safe Shutdown Fire Barrier Slow transfer Safe Shutdown Earthquake Emergency Lighting Scram Discharge Volume |
ML070930236 | 31 January 2005 | Cps/Usar, Chapter 10, Steam and Power Conversion System, Revision 11 | Safe Shutdown Ultimate heat sink Grab sample Hydrostatic Abnormal operational transient Fast acting solenoid valve |
ML070930245 | 31 January 2005 | Cps/Usar, Chapter 12, Radiation Protection, Revision 11 | High Radiation Area Grab sample Locked High Radiation Area Scram Discharge Volume |
ML070930253 | 31 January 2005 | Cps/Usar, Chapter 13, Conduct of Operations, Revision 11 | Safe Shutdown Fitness for Duty Offsite Dose Calculation Manual Probabilistic Risk Assessment Process Control Program Operability Determination Earthquake Fire Protection Program Power change |
ML070930254 | 31 January 2005 | Cps/Usar, Chapter 14, Initial Test Program, Revision 11 | Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Hydrostatic Emergency Lighting Scram Discharge Volume Power change Flow Induced Vibration |
ML070930259 | 31 January 2005 | Cps/Usar, Chapter 15, Accident Analyses, Revision 11 | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Operator Manual Action Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Spiral reload Earthquake Fuel cladding Power change Flow Induced Vibration |
ML070930359 | 31 January 2005 | Cps/Usar, Appendix C, Computer Programs, Revision 11 | Finite Element Analysis Earthquake |
ML070930360 | 31 January 2005 | Cps/Usar, Appendix D, Requirements Resulting from TMI-2 Accident, Revision 11 | Reactor Vessel Water Level Grab sample Probabilistic Risk Assessment Fuel cladding |
ML070930361 | 31 January 2005 | Cps/Usar, Fire Protection Evaluation Report, Revision 11 | Safe Shutdown Ultimate heat sink Fire Barrier Coatings Emergency Lighting Fire Protection Program Fire Watch Early Warning Fire Detection Scaffolding Backfit |
ML070930362 | 31 January 2005 | USAR, Figure 1 Through Figure 22 | |
ML070930364 | 31 January 2005 | Cps/Usar, Appendix F, Fire Protection Safe Shutdown Analysis, Revision 11 | Hot Short Safe Shutdown Fire Barrier Safe Shutdown Earthquake Scram Discharge Volume Fire Protection Program |
ML13016A332 | 10 January 2013 | Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30 | |
ML16305A311 | 31 October 2016 | Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 111 | |
ML16305A312 | 31 October 2016 | Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 111 | |
ML16306A077 | 31 October 2016 | Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 111 | Hydrostatic |
ML16306A078 | 31 October 2016 | Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111 | |
ML16306A079 | 31 October 2016 | Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111 | |
ML16306A080 | 31 October 2016 | Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111 | |
ML16306A081 | 31 October 2016 | Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111 | |
ML16306A083 | 31 October 2016 | Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111 | |
ML17354A205 | 20 December 2017 | Revision 19 to Updated Safety Analysis Report, Chapter 3, Figure 3.6-1 Through Figure 3.11-16, Part 5 of 5 (Redacted) | |
ML22111A198 | 31 March 2022 | 2 to Updated Safety Analysis Report, Chapter 3, Figures Part 2 of 5 | |
ML22111A199 | 31 March 2022 | 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 3 of 5 | |
ML22111A200 | 31 March 2022 | 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 4 of 5 | |
ML22111A222 | 31 March 2022 | 2 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 | |
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30 | 10 January 2013 | Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30 | |
RS-13-157, Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) | 3 July 2013 | Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) | Spent Fuel Pool Instrumentation |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111 | 31 October 2016 | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111 | |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 111 | 31 October 2016 | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 111 | |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 111 | 31 October 2016 | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 111 | |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 111 | 31 October 2016 | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 111 | Hydrostatic |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111 | 31 October 2016 | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111 | |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111 | 31 October 2016 | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111 | |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111 | 31 October 2016 | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111 | |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111 | 31 October 2016 | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111 |