Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
JAFP-11-0112, Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP3 October 2011Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP
ML0412701906 May 20045/6/04, Columbia Generating Station - American Society of Mechanical Engineers Boiler and Pressure Vessel Code - Relief for Qualification Requirements for Dissimilar Metal Piping WeldsIncorporated by reference
Dissimilar Metal Weld
ML05087034817 May 20055/17/05 -J. Parrish, Ltr Columbia Gs - American Society of Mechanical Engineers Inservice Inspection Program Relief Requests 21SI-29 and 21SI-30, Subsequent ASME Section XI Edition and Addenda for Pressure TestingHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
ML05089011515 April 2005Relief, American Society of Mechanical Engineers Inservice Inspection Program Relief Requests 2ISI-31, Subsequent ASME Section XI Edition and Addenda for Pressure Testing (Tac No. MC5851)Nondestructive Examination
VT-2
Incorporated by reference
ML05104055614 April 2005Columbia Generating Station - American Society of Mechanical Engineers Inservice Inspection Program Second 10-Year Interval Request for Relief 2ISI-028VT-2
Incorporated by reference
ML0513100911 June 2005Columbia Generating Station (CGS) - Safety Evaluation for CGS on Relief Request for Alternative to Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds in Accordance with BWRVIP-05Incorporated by reference
ML0705105218 March 2007Relief Request Nos. 3ISI-03 and 3ISI-04 for Third 10-Year Inservice Inspection IntervalNondestructive Examination
ML07059017516 March 2007Request for Relief No. 3ISI-07 for the Third 10-year Inservice Inspection Interval ProgramIncorporated by reference
ML07060011123 March 2007Relief, Request for Relief Nos. RP04, RP05, RP07, RV03, RV04, and RV05 for the Third 10-year Interval Inservice Testing ProgramStroke time
Incorporated by reference
ML07065066119 March 2007Relief Request No. 3ISI-05 for the Third 10-Year Inservice Inspection Interval Hold Time Prior to VT-2 Examination of Standby Liquid Control SystemHydrostatic
VT-2
ML07073059922 March 2007Relief Request No. 3ISI-06 for the Third 10-Year Inservice Inspection Interval Synchronization of Interval for Class Mc Components and Their SupportsIncorporated by reference
ML07101034415 May 2007Request for Relief Nos. RP01, RP03, RP06, RV01 and RV02 for the Third 10-year Inservice Testing Program IntervalUltimate heat sink
Stroke time
Incorporated by reference
ML07333000118 December 2007Request for Relief No. 2ISI-32-1 Through 2ISI-32-20 for the Second 10-Year Inservice Inspection Program Interval and Withdrawal of 2ISI-32-21Incorporated by reference
Dissimilar Metal Weld
ML0829504829 October 2008Inservice Inspection Program Request 3ISI-09
ML1017400759 June 2010Request for Relief from ASME OM Code Test Interval for a Class 2 Pressure Relief Valve
ML1101101723 February 2011Relief Request Nos. 3ISI-10, Use of Updated Method for RPV Weld Inspection, and 3ISI-11, Use of Requirements of BWRVIP-75-A, for the Third 10-Year Inservice Inspection ProgramNon-Destructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML13098A06410 April 2013Memorandum to File, Verbal Authorization on 4/6/2013 of Relief Request ISI3-13, Temporary Non-Code Repair of Reactor Water Cleanup System Piping to Prevent Reactor Shutdown Until Start of Refueling Outage 21Nondestructive Examination
VT-2
ML13191A0549 August 2013Relief Request 3ISI-12, Use of Code Case N-795, Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement ActivitiesHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
ML14337A4499 December 2014Relief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the Fourth 10-Year Inservice Testing Interval (TAC MF3847-MF3849, MF3851-MF3858)Ultimate heat sink
Stroke time
Incorporated by reference
Grace period
ML15030A2329 February 2015Correction to 10 CFR 50.55a Citation and Administrative Changes - Relief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the 4th 10-Year Inservice Testing IntervalIncorporated by reference
ML15036A22013 February 2015Relief Request 3ISI-14 - Use of Code Case N-702 for Nozzle-Vessel Weld and Inner Radius Exams for the Third 10-Year Inservice Inspection IntervalIncorporated by reference
ML15357A35023 December 2015Email, Verbal Authorization of Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI IntervalIncorporated by reference
ML16175A46024 June 2016Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI IntervalIncorporated by reference
ML16292A8723 November 2016Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections Requiring Repair Due to Vibration Fatigue, Fourth 10-Year Inservice Inspection IntervalWeld Overlay
Liquid penetrant
ML16295A21231 October 2016Relief Request 4ISI-02, Use of Code Case N-795 Following Repair/Replacement Activities, Fourth 10-Year Inservice Inspection IntervalHydrostatic
VT-2
Incorporated by reference
Through-Wall Leak
ML17018A08224 January 2017Relief Request for Alternative 4ISI-05 Applicable to the Fourth 10-Year Inservice Inspection Program IntervalTemporary Modification
VT-2
Incorporated by reference
Foreign Material Exclusion
Through-Wall Leak
Through Wall Leak
ML17046A50716 February 2017Relief Request for Alternative 4ISI-07 Applicable to the Fourth 10-Year Inservice Inspection Program IntervalVT-2
ML17318A04220 November 2017Relief Request No. 3ISI-17 from the Requirements of the ASME Code, Section XI for the Third 10-Year Inservice Inspection Interval (CAC No. MF8923; EPID L-2016 LLR-0005)Incorporated by reference
Dissimilar Metal Weld
ML20282A73227 October 2020Proposed Alternative Request No. 4ISI-08 Applicable to the Fourth Inservice Inspection IntervalForeign Material Exclusion