Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
JAFP-11-0112, Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP | 3 October 2011 | Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP | |
ML041270190 | 6 May 2004 | 5/6/04, Columbia Generating Station - American Society of Mechanical Engineers Boiler and Pressure Vessel Code - Relief for Qualification Requirements for Dissimilar Metal Piping Welds | Incorporated by reference Dissimilar Metal Weld |
ML050870348 | 17 May 2005 | 5/17/05 -J. Parrish, Ltr Columbia Gs - American Society of Mechanical Engineers Inservice Inspection Program Relief Requests 21SI-29 and 21SI-30, Subsequent ASME Section XI Edition and Addenda for Pressure Testing | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
ML050890115 | 15 April 2005 | Relief, American Society of Mechanical Engineers Inservice Inspection Program Relief Requests 2ISI-31, Subsequent ASME Section XI Edition and Addenda for Pressure Testing (Tac No. MC5851) | Nondestructive Examination VT-2 Incorporated by reference |
ML051040556 | 14 April 2005 | Columbia Generating Station - American Society of Mechanical Engineers Inservice Inspection Program Second 10-Year Interval Request for Relief 2ISI-028 | VT-2 Incorporated by reference |
ML051310091 | 1 June 2005 | Columbia Generating Station (CGS) - Safety Evaluation for CGS on Relief Request for Alternative to Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds in Accordance with BWRVIP-05 | Incorporated by reference |
ML070510521 | 8 March 2007 | Relief Request Nos. 3ISI-03 and 3ISI-04 for Third 10-Year Inservice Inspection Interval | Nondestructive Examination |
ML070590175 | 16 March 2007 | Request for Relief No. 3ISI-07 for the Third 10-year Inservice Inspection Interval Program | Incorporated by reference |
ML070600111 | 23 March 2007 | Relief, Request for Relief Nos. RP04, RP05, RP07, RV03, RV04, and RV05 for the Third 10-year Interval Inservice Testing Program | Stroke time Incorporated by reference |
ML070650661 | 19 March 2007 | Relief Request No. 3ISI-05 for the Third 10-Year Inservice Inspection Interval Hold Time Prior to VT-2 Examination of Standby Liquid Control System | Hydrostatic VT-2 |
ML070730599 | 22 March 2007 | Relief Request No. 3ISI-06 for the Third 10-Year Inservice Inspection Interval Synchronization of Interval for Class Mc Components and Their Supports | Incorporated by reference |
ML071010344 | 15 May 2007 | Request for Relief Nos. RP01, RP03, RP06, RV01 and RV02 for the Third 10-year Inservice Testing Program Interval | Ultimate heat sink Stroke time Incorporated by reference |
ML073330001 | 18 December 2007 | Request for Relief No. 2ISI-32-1 Through 2ISI-32-20 for the Second 10-Year Inservice Inspection Program Interval and Withdrawal of 2ISI-32-21 | Incorporated by reference Dissimilar Metal Weld |
ML082950482 | 9 October 2008 | Inservice Inspection Program Request 3ISI-09 | |
ML101740075 | 9 June 2010 | Request for Relief from ASME OM Code Test Interval for a Class 2 Pressure Relief Valve | |
ML110110172 | 3 February 2011 | Relief Request Nos. 3ISI-10, Use of Updated Method for RPV Weld Inspection, and 3ISI-11, Use of Requirements of BWRVIP-75-A, for the Third 10-Year Inservice Inspection Program | Non-Destructive Examination Incorporated by reference Dissimilar Metal Weld |
ML13098A064 | 10 April 2013 | Memorandum to File, Verbal Authorization on 4/6/2013 of Relief Request ISI3-13, Temporary Non-Code Repair of Reactor Water Cleanup System Piping to Prevent Reactor Shutdown Until Start of Refueling Outage 21 | Nondestructive Examination VT-2 |
ML13191A054 | 9 August 2013 | Relief Request 3ISI-12, Use of Code Case N-795, Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement Activities | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
ML14337A449 | 9 December 2014 | Relief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the Fourth 10-Year Inservice Testing Interval (TAC MF3847-MF3849, MF3851-MF3858) | Ultimate heat sink Stroke time Incorporated by reference Grace period |
ML15030A232 | 9 February 2015 | Correction to 10 CFR 50.55a Citation and Administrative Changes - Relief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the 4th 10-Year Inservice Testing Interval | Incorporated by reference |
ML15036A220 | 13 February 2015 | Relief Request 3ISI-14 - Use of Code Case N-702 for Nozzle-Vessel Weld and Inner Radius Exams for the Third 10-Year Inservice Inspection Interval | Incorporated by reference |
ML15357A350 | 23 December 2015 | Email, Verbal Authorization of Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval | Incorporated by reference |
ML16175A460 | 24 June 2016 | Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval | Incorporated by reference |
ML16292A872 | 3 November 2016 | Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections Requiring Repair Due to Vibration Fatigue, Fourth 10-Year Inservice Inspection Interval | Weld Overlay Liquid penetrant |
ML16295A212 | 31 October 2016 | Relief Request 4ISI-02, Use of Code Case N-795 Following Repair/Replacement Activities, Fourth 10-Year Inservice Inspection Interval | Hydrostatic VT-2 Incorporated by reference Through-Wall Leak |
ML17018A082 | 24 January 2017 | Relief Request for Alternative 4ISI-05 Applicable to the Fourth 10-Year Inservice Inspection Program Interval | Temporary Modification VT-2 Incorporated by reference Foreign Material Exclusion Through-Wall Leak Through Wall Leak |
ML17046A507 | 16 February 2017 | Relief Request for Alternative 4ISI-07 Applicable to the Fourth 10-Year Inservice Inspection Program Interval | VT-2 |
ML17318A042 | 20 November 2017 | Relief Request No. 3ISI-17 from the Requirements of the ASME Code, Section XI for the Third 10-Year Inservice Inspection Interval (CAC No. MF8923; EPID L-2016 LLR-0005) | Incorporated by reference Dissimilar Metal Weld |
ML20282A732 | 27 October 2020 | Proposed Alternative Request No. 4ISI-08 Applicable to the Fourth Inservice Inspection Interval | Foreign Material Exclusion |