Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
BYRON 2005-0132, Inservice Inspection Program Relief Request I3R-018 November 2005Inservice Inspection Program Relief Request I3R-01Incorporated by reference
CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D5 June 2015Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, DivisionLiquid penetrant
JAFP-02-0194, Proposed Revision of Relief Request VRR-06 for In-Service Testing Program30 September 2002Proposed Revision of Relief Request VRR-06 for In-Service Testing ProgramStroke time
Power-Operated Valves
JAFP-03-0111, Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds Pursuant to 10 CFR 50.55a (g)(6)(i)4 August 2003Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds Pursuant to 10 CFR 50.55a (g)(6)(i)
JAFP-05-0105, Request for Approval of Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii)9 July 2005Request for Approval of Relief Request No. RR-38, Proposed Alternative to Perform a Temporary Non-Code Repair in Accordance with 10 CFR 50.55a(a)(3)(ii)Safe Shutdown
Temporary Modification
Abnormal operational transient
JAFP-11-0112, Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP3 October 2011Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP
JAFP-15-0122, Withdrawal of Application for Alternative Examination Requirements for James A. FitzPatrick Nuclear Power Plant Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-24120 November 2015Withdrawal of Application for Alternative Examination Requirements for James A. FitzPatrick Nuclear Power Plant Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241
JAFP-18-0052, Proposed Alternative to Utilize Code Case N-87930 May 2018Proposed Alternative to Utilize Code Case N-879Nondestructive Examination
JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-88030 May 2018Proposed Alternative to Utilize Code Cases N-878 and N-880Nondestructive Examination
JAFP-18-0076, End of Interval Relief Request Associated with the Fourth Ten-Year Lnservice Inspection (ISI) Interval26 July 2018End of Interval Relief Request Associated with the Fourth Ten-Year Lnservice Inspection (ISI) IntervalNon-Destructive Examination
VT-2
JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds15 February 2019Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping WeldsDissimilar Metal Weld
JPN-02-010, Relief Request RR-28, Revision 1 for the Third 10-Year Inservice Inspection Interval Program Plan8 May 2002Relief Request RR-28, Revision 1 for the Third 10-Year Inservice Inspection Interval Program PlanHigh Radiation Area
Weld Overlay
Hydrostatic
Liquid penetrant
JPN-02-011, Request for Relief RR-29, Third 10-Year Inservice Inspection Interval Program Plan8 May 2002Request for Relief RR-29, Third 10-Year Inservice Inspection Interval Program PlanWeld Overlay
JPN-03-020, Indian Point Nuclear Generating Station, Units 2 & 3, Pilgrim Nuclear Power Station, Vermont Yankee Nuclear Power Station, Relief, Relief Request to Use ASME Code Case N-60011 August 2003Indian Point Nuclear Generating Station, Units 2 & 3, Pilgrim Nuclear Power Station, Vermont Yankee Nuclear Power Station, Relief, Relief Request to Use ASME Code Case N-600
ML01129047931 May 2001Inservice Inspection Relief Request ISI-12VT-2
ML02007038119 February 2002Evaluation of Relief Request PR-2 Associated with the Second 10-Year Interval Inservice Testing Program for Pumps and Valves for Byron Station, Units 1 and 2Ultimate heat sink
ML02015014014 February 2002Evaluation of Relief Request RR-12, Table RR-12-7, Underwater Welding (Tac Nos. MB1018 and MB1019)
ML02025026514 February 2002Evaluation of Relief Request RR-04 - ASME Class 1, 2, 3 Snubbers Visual Examination and Functional Testing (TAC Nos. MB1018 and MB1019)
ML02035015320 February 2002Relief Request, Units 1 and 2, Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping Welds (Tac. Nos. MB0506 and MB0507)Probabilistic Risk Assessment
Large early release frequency
ML0203800536 March 2002Relief Requests CIP 6111 and 4207Incorporated by reference
ML02042001521 February 2002Relief Request CR-37, Inservice Inspection Program Relief Regarding Examination of Pressure Retaining Welds in Piping Subject to Appendix Viii, Supplement 11Weld Overlay
Incorporated by reference
ML0205004021 May 2002Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code to Use the 1998 Edition of Subsections IWE of the ASME Code, Section XI for Containment Inspections (Tac No. MB2946)Coatings
Incorporated by reference
Moisture barrier
Dissimilar Metal Weld
ML02086047915 March 2002Request for Relief, Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Class 1 & 2 PipingInternal Flooding
Nondestructive Examination
VT-2
Scram Discharge Volume
Large early release frequency
ML0208701612 May 2002Evaluation of Relief Requests RR-05, RR-07, RR-12, Tables RR-12-5 and RR-12-9 and RR-13, Tables RR-13-8 (TAC Nos. MB1018 and MB1019)Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Through-Wall Leak
ML02100069016 May 2002Request for Relief No. PR-12 Associated with the Third 10 - Year Interval Inservice Testing Program for Pumps and Valves at Calvert Cliffs Nuclear Power Plant, Units 1 and 2. (TAC Nos. MB3782 and MB3783)
ML0210607752 May 2002Evaluation of Relief Request RR-12, Table RR-12-6, Rotation of Snubbers and Relief Valves (TAC Nos. MB1018 and MB1019)
ML02198001329 July 2002Code Relief, Relief Request RV-13 to Delay Sr/V Setpoint Testing
ML0225902034 October 2002Relief Request, PR-22 for Third 10-year Inservice Inspection Interval (MB4030, MB4031)Incorporated by reference
ML0230500678 November 2002Units 1 & 2, Relief Request for Alternative Testing of Containment Sump Suction Valves 1/2SI8811A/B
ML02318049614 November 2002Relief, Request for Relief No. RR-28 for the Third 10-Year Inservice Inspection Interval Program Plan for the FitzPatrick Power PlantNon-Destructive Examination
Weld Overlay
Through Wall Leak
ML02336039320 November 2002Request for Relief from ASME Code Section XI, Appendix Viii, Supplement 11, Inservice Inspection RequirementsWeld Overlay
Dissimilar Metal Weld
ML03037074328 February 2003Byron, Units 1 & 2, Relief Request, Alternative Testing of Containment Sump Suction Valves for the Second Ten-Year Inservice Testing IntervalStroke time
Enforcement Discretion
ML03042026410 February 2003R. E. Ginna Nuclear Power Plant, Relief, Inservice Testing Program Relief Request PR-2, MB7232Incorporated by reference
ML0306204913 March 2003Relief, American Society of Mechanical Engineers Boiler and Pressure Vessel Code - Relief for Risk-Informed Inservice Inspection of Piping, MB4633 and MB4634Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Dissimilar Metal Weld
ML0306502551 April 2003Relief Request Review, Third 10-Year Pump and Valve Inservice Testing Program, Revision of Relief Request VRR-04Incorporated by reference
ML0311300295 May 2003Relief from Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Concerning Check Valve Inservice Testing Program, MB4804 & MB4805Probabilistic Risk Assessment
Incorporated by reference
ML0312200276 May 2003Authorization of Alternative, Inservice Inspection (ISI) Relief Request ISI-23B, TAC MB5732Weld Overlay
Nondestructive Examination
Incorporated by reference
ML0312500188 May 2003Relief, Inservice Testing Program Relief Regarding Main Steam Power Operated Relief Valves, MB8713
ML03126011523 June 2003Relief Request Review, American Society of Mechanical Engineers Boiler and Pressure Vessel Code-Relief for Qualification Requirements for Dissimilar Metal Piping WeldsNondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML0314205209 January 2003Enclosure - R.E. Ginna, Inservice Testing Program Relief Request PR-2Incorporated by reference
ML03142081828 May 2003Relief Request RV-30E, Inservice Testing Program Relief Regarding Main Steam Electronic Relief Valves and Safety/Relief Valves
ML03150051127 June 2003Safety Evaluation of Relief Request 2207 for the Second Ten-Year Pump and Valve Inservice Testing ProgramIncorporated by reference
ML0316110031 July 2003Relief Request, CR-25 for Third 10-Year Inservice Inspection IntervalVT-2
Incorporated by reference
Liquid penetrant
Through-Wall Leak
ML03192014824 July 2003Relief Request, Witholding Information from Public Disclosure,
ML0323205485 September 2003Request for Relief from Selected Aspects of ASME Code.Incorporated by reference
ML0323704804 September 2003Relief Request, Fourth 10-Year Inservice Inspection IntervalWeld Overlay
Hydrostatic
VT-2
Incorporated by reference
Dissimilar Metal Weld
ML03241002216 September 2003Relief Request, Relief from ASME Section XI Requirements for Control Rod Drive Mechanism Canopy Seal Welds, TAC No MB8494, MB8495, MB8492, and MB8493Weld Overlay
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
ML0325502459 September 2003ASME Section XI Relief Request to Use Alternative Techniques for Examining Dissimilar Metal WeldsDissimilar Metal Weld
ML0327308692 October 2003Relief Request for Fourth 10-Year Inservice Testing Interval, MB8741, MB8742, MB8743, MB8744, MB8745, and MB8746Stroke time
ML03296032220 October 2003Submittal of Relief Request VR-4 Related to the Requirements of 10CFR50.55a(f), Inservice Testing Requirements.Incorporated by reference
Cold shutdown justification