Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000485/1985071 | 17 June 1986 | Ack Receipt of 851204 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/85-71 | |
IR 05000485/1996024 | 5 March 1997 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/96-24 | Operability Determination |
ML17244A353 | 25 January 1979 | Responds to 781221 Ltr Requesting Verification of Data Submitted by Util.Forwards Comments & Addl Info Re Isolation of Low Pressure Sys from Reactor Coolant Sys | Safe Shutdown |
ML17244A516 | 8 May 1979 | Submits Revised Attachment A,B & C to 780728 Submittal Amending Tech Specs for Charcoal Filter Testing & Iodine Removal Equipment Operability | |
ML17244A543 | 16 April 1979 | Confirms 790416 Telcon to W Raymond Reporting LER-79-09, Boric Acid Storage Tanks Out of Spec for Vol & Weight of Boric Acid.Orderly Load Reduction & Batching Operations Commenced;Tanks within Specs | Boric Acid |
ML17244A569 | 20 June 1979 | Requests Notification of Date for Meeting W/Nrc to Discuss Computer Models Which Reflect Upper Plenum Injection of ECCS | |
ML17249A179 | 8 October 1979 | Responds to 790808 Ltr Re Adequacy of Station Electric Distribution Sys Voltages.Submits Sys Model & Acceptance Criteria for Use W/Proprietary Code PTI-PSS/E to Verify Offsite Power Capability.Final Rept Submitted in 60 Days | |
ML17249A455 | 2 January 1980 | Supplements 791212 Ltr Listing Six Suits Against Util. Seventh,Ew Garrett Vs Util,Received | |
ML17249A911 | 30 April 1980 | Forwards Response to IE Bulletin 80-04. Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Auxiliary Feedwater Flow Becomes Dominant Factor in Determining Duration & Magnitude of Steam Flow Transient | Safe Shutdown Boric Acid Shutdown Margin |
ML17250A332 | 12 June 1980 | Comments on 800506 Presentation to NRC Commissioners Re Status of SEP & Description of Difficulty as Lack of Aggression by Licensees.Nrc Has Not Provided Guidelines. Issues W/Higher Priorities Have Arisen | Safe Shutdown |
ML17250A716 | 29 October 1980 | Informs of Changes in Organizational Structure Per FE Drake Retirement as Board Chairman & Chief Executive Officer. Corporate Organization Chart,Effective 801001,encl | |
ML17258A186 | 22 September 1981 | Forwards Endorsements 73 & 74 to ANI Policy NF-170 | |
ML17258A737 | 14 January 1981 | Forwards Public Version of Upgraded Evacuation Time Estimates for Facilities in Response to NRC 801209 Ltr | |
ML17258A795 | 10 February 1981 | Forwards Summary of Actual Cash Flow for 1980,projected Cash Flow for 1981 & Financial Statement for 3 & 12 Months Ended 801231.Info Supports Util Guarantee to Pay Retrospective Premiums Required by Secondary Financial Protection Sys | |
ML18037A193 | 25 August 1979 | Requests Reopening of Antitrust Investigation Re CP Application.Util Refusal to Supply Power to Massena,Ny Is Coercive Attempt to Restrain Free Trade | Coatings |
ML18037A379 | 27 May 1982 | Forwards Annual Financial Repts 1981 for Niagara Mohawk Power Corp,Ny State Electric & Gas Corp,Lilco,Rochester Gas & Electric Corp & Central Hudson Gas & Electric Corp | |
ML19209A394 | 10 September 1979 | Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies, Re safety-related Application,Mfg & Overall Dimensions | |
ML19209A516 | 28 September 1979 | Forwards First Deficiency Rept Re Qualification of Control Sys.Next Rept Will Be Submitted in Approx Three Months | |
ML19209C220 | 2 October 1979 | Forwards Snupps FSAR to Be Incorporated Into Applications for OLs | |
ML19210C133 | 7 November 1979 | Confirms That Snupps FSAR Should Be Considered Tendered by Util.Snupps FSAR Will Be Incorporated by Formal Amend to License Application | |
ML19211A424 | 1 November 1979 | Submits Generic Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Seismic Analysis Input Info Conforms to Actual as-built Configuration of safety-related Sys | |
ML19211D275 | 14 January 1980 | Discusses NRC Delay in Review of FSAR & OL Application. Review Schedule Should Be Established Promptly | |
ML19224C524 | 29 May 1979 | Responds to IE Bulletin 79-07 Re Seismic Stress Analysis of safety-related Piping.All Analyses Properly Performed & Methods Specified in Bulletin Not Used | |
ML19224D293 | 18 May 1979 | Responds to IE Bulletin 79-04.Component Cooling & Essential Svc Water Sys,Reactor Coolant,Auxiliary Feedwater,Feedwater, Compresed Air & Auxiliary Turbines Sys Will Use 3.4 or 6-inch Velan Swing Check Valves | |
ML19224D356 | 17 May 1979 | Confirms 790629 Deadline for Response to IE Bulletins 78-12,78-12A & 78-12B | |
ML19225B247 | 18 July 1979 | Requests Substitution of Hh Voigt for Ae Upton on NRC 790713 Distribution List | |
ML19241B472 | 18 May 1979 | Responds to IE Bulletin 79-03.Submits Ref Listing of Youngstown SA-312 Type 304 Welded Piping Spools Which Was Inadvertently Omitted in 790510 Response | |
ML19242B114 | 29 June 1979 | Responds to IE Bulletins 78-12,12A & 12B.C-E Submitted Rept Containing Info Requested Re Atypical Weld Matl in Reactor Pressure Vessel Welds.Westinghouse Will Inventory Archive Surveillance Weldment Matl to Be Used for Verification | |
ML19247B050 | 15 June 1979 | Responds to IE Bulletin 79-09.GE Type AK-2 Circuit Breakers Not Used or Planned for Use in Design of safety-related Sys | |
ML19247B296 | 5 July 1979 | Forwards Rept on Pipe-Support Base Plate Designs Using Concrete Expansion Anchor Bolts, in Response to IE Bulletin 79-02.Response Is Result of Review Design & Installation Practices & Procedures for Anchor Bolts | |
ML19249A065 | 24 July 1979 | Responds to IE Bulletin 79-11.No Westinghouse Type DB-50 or 75 Circuit Breakers Included in Any safety-related Applications | |
ML19249E878 | 16 July 1979 | Requests Revocation of Approval of Lowered Stds for Concrete Base Mats & Enlistment of Unbiased Private Specialist to Analyze Mats | |
ML19250A645 | 28 September 1979 | Notifies That Licensee Informed NRC on 790830 of Potential Deficiency Re Qualification of Control Sys Which Was Later Subj of IE Info Notice 79-22.Suppl Rept Will Be Issued in About 90 Days | |
ML19253C596 | 26 October 1979 | Responds to IE Bulletin 79-23 Re Potential Failure of Emergency Diesel Generator Field Exciter Transformer.Problem Not Applicable to Snupps Diesel Generators | |
ML19253C798 | 15 October 1979 | Forwards Interim Deficiency Rept Re Qualification of Control Sys.Supplemental Rept in Approx Three Months | |
ML19253C936 | 6 December 1979 | Notifies of Corrective Action for Potential Deficiency Re Engineered Safety Features Actuation Sys.Test Sequence to Detect Failure Will Be Incorporated Into Appropriate Procedures | |
ML19254F206 | 1 November 1979 | Requests NRC Concurrence on Usage of ASME Section III Code Case N-240, Hydrostatic Testing of Open-Ended Piping, Section Iii,Div 1. | Hydrostatic |
ML19256A382 | 15 December 1978 | Forwards Order Defining Scope of Rehearing on Public Need Dtd 781205 by State of Ny Board on Electric Generation Siting & Environ.Provides That Record Developed in State Hearings Will Be Basis for Determining Need for Power | |
ML19257B887 | 4 January 1980 | Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Such Relays Have Been Identified.Will Advise Further in Two Wks | |
ML19259C049 | 1 June 1979 | Requests NRC Concurrence Re Use of ASME Section III Code Case N-242,Matls Certification. | |
ML19260C948 | 29 November 1979 | Forwards Final Deficiency Rept Re Gulf & Western Preassembly Formations | |
ML19260D562 | 5 February 1980 | Forwards Supplemental Deficiency Rept Re Qualification of Control Sys | |
ML19260E056 | 30 January 1980 | Notifies of Ny State Board on Electric Generation Siting & Environ 800123 Decision to Rescind Prior Approval of Const & Operation of Facility.No Date Set for Formal Opinion. Certificate of Svc Encl | |
ML19261D792 | 19 June 1979 | Requests Timely Notification of Any OL Proceedings within Jurisdiction of Mo Public Svc Commission,To Facilitate State Participation | |
ML19262B567 | 20 December 1979 | Responds to NRC 791018 Request for Addl Info Re Snupps Fire Protection Sys.Detailed Responses to Requests Will Be Included in FSAR Revision.Clarification of Sys Description Will Show Design in Compliance W/Nrc Requirements | |
ML19262B583 | 14 December 1979 | Discusses Potential Deficiency,Per 791116 Telcon to Nrc. Westinghouse Review Reveals That Dropped Rod Safety Analysis Deficiency May Affect Four Addl Loop Plants.Further Info Will Be Provided by FSAR Revision | |
ML19262C424 | 3 January 1980 | Responds to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Expansion Anchors in Concrete Block Walls Not Used.Util 790705 Response Need Not Be Modified or Amended | |
ML19268C032 | 5 October 1979 | Responds to IE Bulletin 79-03 Followup Rept.Data Developed on Generic Basis & Considered Applicable to All Snupps Units.Fabrication & Installation of Youngstown Pipe Spools Will Proceed W/All Matl Analyzed Prior to Use | |
ML19269E306 | 10 May 1979 | Responds to IE Bulletin 79-03.To Date,There Have Been No Pipe Spools of Any Type Fabricated for or Shipped to Facilities | |
ML19270F961 | 1 March 1979 | Withdraws Requested Partial Exemption from 10CFR21.Revised Regulations Providing Exemptions for Commercial Grade Items Make Request Unnecessary |