Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
L-05-080, Exhibit D (Part 4): Excerpt from the Beaver Valley and Perry 2005 License Transfer Application13 June 2011Exhibit D (Part 4): Excerpt from the Beaver Valley and Perry 2005 License Transfer Application
L-08-229, Responses to a Request for Additional Information in Support of License Amendment Request No. 07-0051 August 2008Responses to a Request for Additional Information in Support of License Amendment Request No. 07-005High winds
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
L-09-028, Response to Request for Additional Information the 2008 Steam Generator Tube Inspection Report20 February 2009Response to Request for Additional Information the 2008 Steam Generator Tube Inspection Report
L-14-147, ODCM: Index, Matrix and History of ODCM Changes20 March 2013ODCM: Index, Matrix and History of ODCM ChangesTime of Discovery
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
Power Uprate
L-16-092, Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 622 April 2016Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 6Incorporated by reference
Earthquake
Stolen
L-20-191, Energy Harbor - Enclosed May 2020 NPDES Discharge Monitoring Report, Beaver Valley Power Station & Supplemental Monitoring Data for Outfall 001 (Dissolved Oxygen)24 June 2020Energy Harbor - Enclosed May 2020 NPDES Discharge Monitoring Report, Beaver Valley Power Station & Supplemental Monitoring Data for Outfall 001 (Dissolved Oxygen)Grab sample
ML02267042223 September 2002Summary of Telecon Regarding Steam Generator Inspection ResultsHydrostatic
ML02277042926 September 2002Draft Response to 2nd RAI for Beaver Valley, Unit 2 Fresh Fuel Rack Study
ML03252142920 August 2003Westinghouse - Nuclear Safety Advisory Letter NSAL-03-6, High Net Heat Input, Dated 08/20/2003
ML0403405964 March 2002Corrective Action for Item 1 of CR 02-00921, Engineering Will Evaluate the Need to Include the Local Flow Indicators in the Fire Protection Safe Shutdown Report and Initiate Fpssr Changes as RequiredSafe Shutdown
Boric Acid
Fire Protection Program
ML04034060217 August 2002Corrective Action of CR 02-00921, Due Date Extension
ML04034060527 August 2002Corrective Action of CR 02-00921, Due Date Extension
ML04034060922 May 2003Corrective Action of CR 02-00921, Due Date Extension
ML04034061423 May 2003Corrective Action of CR 02-00921, Due Date Extension
ML04034062014 May 2003Corrective Action of CR 02-00921, Due Date ExtensionSafe Shutdown
ML04034063614 May 2003Corrective Action of CR 02-00921, Due Date ExtensionSafe Shutdown
ML0403406388 March 2002Investigation Summary of CR 02-00921
ML04034064519 June 2003Corrective Action of CR 02-00921, Design Engineering Will Coordinate a Review of Time Limits for Critical Actions with Operations Personnel and as a Part of the Site Latent Issue Review Program Validate Associated Fire Protection Time Criti
ML04041049220 February 2004Order EA-03-009 Service List
ML0505404649 February 2004Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants
ML05054046910 February 2004Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004Safe Shutdown
Fire Barrier
Condition Adverse to Quality
Significance Determination Process
Fire Protection Program
ML05354028816 December 2005Issuance of Conforming Amendments for Bv, Units 1 and 2; Perry, Unit 1 and Davis-Besse, Unit 1 Transfer of Ownership Interests to Fengenco - Amendment No. 13 to Indemnity Agreement B73
ML06116036725 April 2006Fenco Security Working Hours and Fatigue; Procedure No. NOP-LP-1005, Rev 0Fitness for Duty
ML06116037924 February 2005NRC Telecon Listing
ML06116048222 March 2005NRC Inspection Report 2005-04 Meeting Attendees
ML06116055324 March 2005NRC Inspection Report 2005-004 Meeting Attendees
ML0626503121 September 2006Liquid Radiation Release Lessons Learned Task Force Final Report (Enclosure)Boric Acid
Offsite Dose Calculation Manual
Coatings
Condition Adverse to Quality
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Chernobyl
Accidental discharge
ML06347059914 December 2006Plant Service List
ML07123073125 April 2007Attendance Roster from Annual Assessment Public Meeting
ML07263011414 September 2007/ P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170
ML07263031914 September 2007P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List
ML07267050118 September 2007EPU I&C Questions
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07352027717 December 2007Ohio Natural Heritage Data Request for Beaver Valley Power Station License Renewal
ML08046039913 February 2008Power Reactor Inattentive Officer Findings 2004-PresentSignificance Determination Process
ML08088015725 March 2008Beaver Valley Annual Assessment, Sign-in Sheets
ML09092025231 March 2009Public Meeting Sign-in Sheet, 3/31/2009
ML09110088515 April 2009Independent Spent Fuel Storage Installation Inspection Document Request
ML09293050024 October 2009Response to Citizen Power Issues
ML10091031531 March 2010Sign-in Sheet for FENOC Meeting 3-31-10
ML10133035213 May 2010Attendance Signing Sheet for Annual Assessment Meeting 5-4-2010
ML10193046025 March 2010List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants
ML1106207253 March 2011ISI Notification of Inspection and Request for InformationNondestructive Examination
ML11123056428 April 2011Aam Attendance List, April 28, 2011
ML11175021922 June 2011NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011)Condition Adverse to Quality
Significance Determination Process
ML11271003328 September 2011ROP Tabletop Examples and ResultsTime of Discovery
Mission time
Significance Determination Process
ML11322035521 November 20112010 DFS Report Analysis for Perry Nuclear Power Plant - Supercedes
ML12056A05212 March 2012Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML12164A79911 June 2012Attachment 2 to L-12-184, Response to NRC Request for Additional Information Regarding 10 CFR 50.46, 30-Day Report (Non-proprietary Version)
ML12230A23115 August 2012Attachment 2 - L-12-287, Response to NRC Request for Additional Information Regarding 10 CFR 50.46, 30-Day Report