Issue date | Title | Topic | |
---|---|---|---|
L-05-080, Exhibit D (Part 4): Excerpt from the Beaver Valley and Perry 2005 License Transfer Application | 13 June 2011 | Exhibit D (Part 4): Excerpt from the Beaver Valley and Perry 2005 License Transfer Application | |
L-08-229, Responses to a Request for Additional Information in Support of License Amendment Request No. 07-005 | 1 August 2008 | Responses to a Request for Additional Information in Support of License Amendment Request No. 07-005 | High winds Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program |
L-09-028, Response to Request for Additional Information the 2008 Steam Generator Tube Inspection Report | 20 February 2009 | Response to Request for Additional Information the 2008 Steam Generator Tube Inspection Report | |
L-14-147, ODCM: Index, Matrix and History of ODCM Changes | 20 March 2013 | ODCM: Index, Matrix and History of ODCM Changes | Time of Discovery Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change Power Uprate |
L-16-092, Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 6 | 22 April 2016 | Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 6 | Incorporated by reference Earthquake Stolen |
L-20-191, Energy Harbor - Enclosed May 2020 NPDES Discharge Monitoring Report, Beaver Valley Power Station & Supplemental Monitoring Data for Outfall 001 (Dissolved Oxygen) | 24 June 2020 | Energy Harbor - Enclosed May 2020 NPDES Discharge Monitoring Report, Beaver Valley Power Station & Supplemental Monitoring Data for Outfall 001 (Dissolved Oxygen) | Grab sample |
ML022670422 | 23 September 2002 | Summary of Telecon Regarding Steam Generator Inspection Results | Hydrostatic |
ML022770429 | 26 September 2002 | Draft Response to 2nd RAI for Beaver Valley, Unit 2 Fresh Fuel Rack Study | |
ML032521429 | 20 August 2003 | Westinghouse - Nuclear Safety Advisory Letter NSAL-03-6, High Net Heat Input, Dated 08/20/2003 | |
ML040340596 | 4 March 2002 | Corrective Action for Item 1 of CR 02-00921, Engineering Will Evaluate the Need to Include the Local Flow Indicators in the Fire Protection Safe Shutdown Report and Initiate Fpssr Changes as Required | Safe Shutdown Boric Acid Fire Protection Program |
ML040340602 | 17 August 2002 | Corrective Action of CR 02-00921, Due Date Extension | |
ML040340605 | 27 August 2002 | Corrective Action of CR 02-00921, Due Date Extension | |
ML040340609 | 22 May 2003 | Corrective Action of CR 02-00921, Due Date Extension | |
ML040340614 | 23 May 2003 | Corrective Action of CR 02-00921, Due Date Extension | |
ML040340620 | 14 May 2003 | Corrective Action of CR 02-00921, Due Date Extension | Safe Shutdown |
ML040340636 | 14 May 2003 | Corrective Action of CR 02-00921, Due Date Extension | Safe Shutdown |
ML040340638 | 8 March 2002 | Investigation Summary of CR 02-00921 | |
ML040340645 | 19 June 2003 | Corrective Action of CR 02-00921, Design Engineering Will Coordinate a Review of Time Limits for Critical Actions with Operations Personnel and as a Part of the Site Latent Issue Review Program Validate Associated Fire Protection Time Criti | |
ML040410492 | 20 February 2004 | Order EA-03-009 Service List | |
ML050540464 | 9 February 2004 | Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants | |
ML050540469 | 10 February 2004 | Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004 | Safe Shutdown Fire Barrier Condition Adverse to Quality Significance Determination Process Fire Protection Program |
ML053540288 | 16 December 2005 | Issuance of Conforming Amendments for Bv, Units 1 and 2; Perry, Unit 1 and Davis-Besse, Unit 1 Transfer of Ownership Interests to Fengenco - Amendment No. 13 to Indemnity Agreement B73 | |
ML061160367 | 25 April 2006 | Fenco Security Working Hours and Fatigue; Procedure No. NOP-LP-1005, Rev 0 | Fitness for Duty |
ML061160379 | 24 February 2005 | NRC Telecon Listing | |
ML061160482 | 22 March 2005 | NRC Inspection Report 2005-04 Meeting Attendees | |
ML061160553 | 24 March 2005 | NRC Inspection Report 2005-004 Meeting Attendees | |
ML062650312 | 1 September 2006 | Liquid Radiation Release Lessons Learned Task Force Final Report (Enclosure) | Boric Acid Offsite Dose Calculation Manual Coatings Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl Accidental discharge |
ML063470599 | 14 December 2006 | Plant Service List | |
ML071230731 | 25 April 2007 | Attendance Roster from Annual Assessment Public Meeting | |
ML072630114 | 14 September 2007 | / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 | |
ML072630319 | 14 September 2007 | P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List | |
ML072670501 | 18 September 2007 | EPU I&C Questions | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML073520277 | 17 December 2007 | Ohio Natural Heritage Data Request for Beaver Valley Power Station License Renewal | |
ML080460399 | 13 February 2008 | Power Reactor Inattentive Officer Findings 2004-Present | Significance Determination Process |
ML080880157 | 25 March 2008 | Beaver Valley Annual Assessment, Sign-in Sheets | |
ML090920252 | 31 March 2009 | Public Meeting Sign-in Sheet, 3/31/2009 | |
ML091100885 | 15 April 2009 | Independent Spent Fuel Storage Installation Inspection Document Request | |
ML092930500 | 24 October 2009 | Response to Citizen Power Issues | |
ML100910315 | 31 March 2010 | Sign-in Sheet for FENOC Meeting 3-31-10 | |
ML101330352 | 13 May 2010 | Attendance Signing Sheet for Annual Assessment Meeting 5-4-2010 | |
ML101930460 | 25 March 2010 | List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants | |
ML110620725 | 3 March 2011 | ISI Notification of Inspection and Request for Information | Nondestructive Examination |
ML111230564 | 28 April 2011 | Aam Attendance List, April 28, 2011 | |
ML111750219 | 22 June 2011 | NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011) | Condition Adverse to Quality Significance Determination Process |
ML112710033 | 28 September 2011 | ROP Tabletop Examples and Results | Time of Discovery Mission time Significance Determination Process |
ML113220355 | 21 November 2011 | 2010 DFS Report Analysis for Perry Nuclear Power Plant - Supercedes | |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML12164A799 | 11 June 2012 | Attachment 2 to L-12-184, Response to NRC Request for Additional Information Regarding 10 CFR 50.46, 30-Day Report (Non-proprietary Version) | |
ML12230A231 | 15 August 2012 | Attachment 2 - L-12-287, Response to NRC Request for Additional Information Regarding 10 CFR 50.46, 30-Day Report |