ML040340638
| ML040340638 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/08/2002 |
| From: | Hawley C FirstEnergy Nuclear Operating Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2003-0358, NOP-LP-2001-06 CR 02-00921 | |
| Download: ML040340638 (1) | |
Text
INVESTIGATION
SUMMARY
CR Number:
NOP-LP-2001-06 02-00921 Category I Eval: CF Assigned Organization: 0030 Quality Followup Req'd: O Yes PI No or Fix l g
ngtig'ons OM R
ii ZJi Hordware'/Degade d C6ndlilon iequired?,.or i Acceptance of the CR Investigation signifies acceptance of the following Items, as applicable:
Originator Identification Date Corrective Actions (listed below)
(listed below, if any)
(listed below, if any)
Cause Analysis Generic Implications 10 CFR 21 Decision Checklist Acceptance of Investigation:
Date:
Quality Approval:
Date:
Hawley, C 318/2002 Closure Comments:
none Quality Comments:
CORRECTIVE ACTIONS Resp CA Sched CA Cause Org.
Accept Due Completed Number:
Type:
Type:
Code:
Codes:
CA Acceptance:
Date:
Date:
Date:
1 1
A T RA j B02 0030 Manoleras, M for Hawley l
3/8/02 9/1/2002 8/28/2002 2 u A
RA B02 L0030 Manoleras, M for Hawley 3/8/02 11/29/200 11125/2002
_---2 3
A RA B02 0030 Manoleras, M for Hawley l
3/8/02 911/2002 8/28/2002 4
A RA B02 0030 Manoleras, M for Hawley 3/8/02 2/2012003 2/12/2003 5
A RA B01 0030 DEVINE, J 8/29/02 2/25/2003 2/20/2003 6
A RA B01 0030 Frederick, K for Manoleras 11/26/02 7/2212003 7
A RA B01 0030 Frederick, K for Manoleras 11/26102 9/30/2003 8
A RA B04 0030 Frederick, K for Manoleras 11126/02 5/23/2003 2/12/2003 9
A RA B04 0030 Frederick, K for Manoleras 11/26102 5/23/2003 5/22/2003 10 A
RA B02 0051 Eberle, C for Drew 2/20/03 7/8/2003 11 A
RA B02 0051 Schaffner, F for Drew 2/13/03 5/7/2003 5/7/2003 12 A
RA B02 0051 Eberle, C for Drew
[
2120103 7/8/2003 Page 1 of 1