ML040340645

From kanterella
Jump to navigation Jump to search
Corrective Action of CR 02-00921, Design Engineering Will Coordinate a Review of Time Limits for Critical Actions with Operations Personnel and as a Part of the Site Latent Issue Review Program Validate Associated Fire Protection Time Criti
ML040340645
Person / Time
Site: Beaver Valley
Issue date: 06/19/2003
From: Kahl H
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0358, NOP-LP-2001-05 CR 02-00921
Download: ML040340645 (1)


Text

CORRECTIVE ACTION CR Number:

NOP-LP-2001-05 02-00921 CR Category: Action Type: Schedule Type: CA Number:

CF ( G) Engineening Evaluation ( A) Normal Work Management 13 Corrective Actl on Type: lCause Code: Resp Org:

0 (RA) Remedial Action (1B04) Design analysis 0030 R

Description:

I Design Engineering will coordinate a review.of time limits for critical actions with operations G personnel and as a part of the site Latent issue review program validate associated fire protection I time critical actions. This CA iswriten to provide further clarification of the intent of corrective action N 02-00921-06.

A T 7 0

R C Completed By. Organization: Date: Phone: Attachments:

KAHL, H l 0030 6/19/2003 5064 If a Refueling Outage Is required, Other Tracking # Corre tive Action Due Date:

ACC- Enter the Refueling Outage number: BEA. l N/A 8/30/2003 EPT Approval: (Enter Name and Sign) Section: D MANOLERAS, M 0030 6/19/2003 QUAL Quality Organization Approval: Date:

iTY I Response:

M P

E E

M E

N T

I Corrective Action Implementation Date:

N Li Signature Indicates Corrective Action complete:

G Completed By: Date:

ri Signature Indicates verification for SCAD CRs:

0 Verified By: Date:

R l Enter Name and Sign:

e_ Implementing Organization Approval: Date:

Comments:

UE AR LI I F T I YE R Approval: Date:

Page 1 of 1