Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
LIC-93-0068, Provides Clarification of Util Position on Listed Points Delineated in in Response to GL 87-0211 February 1993Gates W
OMAHA PUBLIC POWER DISTRICT
Provides Clarification of Util Position on Listed Points Delineated in in Response to GL 87-02Other
LIC-93-0248, Documents Change in Commitment Made in 930211 Response to Generic Ltr 87-02 Re Usar,App F in-structure Response Spectra & Alternate Seismic Criteria & Methodology,W/Regard to Resolution of USI A-4624 September 1993Gates W
OMAHA PUBLIC POWER DISTRICT
Documents Change in Commitment Made in 930211 Response to Generic Ltr 87-02 Re Usar,App F in-structure Response Spectra & Alternate Seismic Criteria & Methodology,W/Regard to Resolution of USI A-46Other
LIC-95-0181, Forwards Fort Calhoun Station Seismic Evaluation Rept, Summarizing Results of USI A-46 Review,In Response to GL 87-0228 September 1995OMAHA PUBLIC POWER DISTRICT
Tira Patterson
Forwards Fort Calhoun Station Seismic Evaluation Rept, Summarizing Results of USI A-46 Review,In Response to GL 87-02Other
LIC-96-0098, Informs That Sight Glasses on DG Fuel Oil Day Tanks Will Be Replaced by Sept 1996,based on Revised DG Outage Schedule10 July 1996OMAHA PUBLIC POWER DISTRICT
Tira Patterson
Informs That Sight Glasses on DG Fuel Oil Day Tanks Will Be Replaced by Sept 1996,based on Revised DG Outage ScheduleOther
LIC-96-0121, Responds to RAI Re Resolution of USI A-4623 August 1996OMAHA PUBLIC POWER DISTRICT
Tira Patterson
Responds to RAI Re Resolution of USI A-46Other
LIC-97-0105, Responds to Supplemental RAI Re Resolution of Unresolved Safety Issue A-46.Requested Response Will Require Rev of 4 Calculations Performed by Two Separate Vendors.Revised Schedule Was Discussed W/Nrr Project Manager on 970618 & 1920 June 1997OMAHA PUBLIC POWER DISTRICT
Gambhir S
Responds to Supplemental RAI Re Resolution of Unresolved Safety Issue A-46.Requested Response Will Require Rev of 4 Calculations Performed by Two Separate Vendors.Revised Schedule Was Discussed W/Nrr Project Manager on 970618 & 19Supplement
LIC-97-0122, Forwards Response to Supplemental RAI Re Resolution of USI A-46 for Fcs.Rev 1 to Calculation FC06313 & Rev 1 to Calculation FC06314,also Encl4 August 1997OMAHA PUBLIC POWER DISTRICT
Gambhir S
Forwards Response to Supplemental RAI Re Resolution of USI A-46 for Fcs.Rev 1 to Calculation FC06313 & Rev 1 to Calculation FC06314,also EnclSupplement
LIC-97-0162, Informs of Extension of Commitment to Replace Relays Which Do Not Meet Seismic Qualification on FCS Edgs.Util Plans to Complete DG Relay Replacement No Later than 9712311 October 1997OMAHA PUBLIC POWER DISTRICT
Gambhir S
Informs of Extension of Commitment to Replace Relays Which Do Not Meet Seismic Qualification on FCS Edgs.Util Plans to Complete DG Relay Replacement No Later than 971231Other
ML20056F17710 August 1993Steven Bloom
Office of Nuclear Reactor Regulation
Requests That Util Provide Comparison Between Criteria in App F of USAR & Ascm to Show That Ascm Meets Median Centered DefinitionOther
ML20057G22418 October 1993Steven Bloom
Office of Nuclear Reactor Regulation
Informs That NRC Reviewed Comparison Between Criteria in App F of USAR & Alternate Seismic Criteria & Methodology & Concurs W/Util ConclusionOther
ML20059H0712 November 1993Steven Bloom
Office of Nuclear Reactor Regulation
Informs That Util 920921 Response to Suppl 1 to GL 87-02, Acceptable & Ack Util Confirming That NRC Interpretation Described in Correct in That Util Intends to Use Entire GIP-2,including SQUG CommitmentsOther
ML20128D42330 November 1992Steven Bloom
Office of Nuclear Reactor Regulation
Forwards Safety Evaluation Re Evaluation of 120-day Response to Suppl 1 to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactor, Uresolved Safety Issue A-46Approval
ML20133N79210 January 1997OMAHA PUBLIC POWER DISTRICT
Gambhir S
Submits Correction of Extension of Commitment for Generic Implementation Procedure (GIP-2) Re Outlier Resolution (Unresolved Safety Issue A-46,TAC M69447)Other
ML20140D1425 June 1997Wharton L
NRC (Affiliation Not Assigned)
Forwards Supplemental RAI Re Resolution of Unresolved Safety Issue A-46.Written Response Requested to Be Provided within 30 Days of Receipt of LtrRAI
ML20236V48230 July 1998Wharton L
NRC (Affiliation Not Assigned)
Forwards SER of Util Response to GL 87-02,which Established USI A-46 Program for Fort Calhoun Station,Unit 1.Staff Concludes That USI A-46 Implementation Program Met Purpose & Intent of Criteria in GIP-2Approval