Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML12334A47612 December 2011Official Exhibit - NYS000015-00-BD01- Indian Point No. 3 Nuclear Power Plant, Electrical Distribution & Transmission System, Dwg No. 9321-F-33853, Rev 17 (Electrical Drawing) (Feb. 28, 2008) (Dwg 9321-F-33853)
ML12334A47912 December 2011Official Exhibit - NYS000002-00-BD01 - State of New York Statement of Position Contention NYS-8 (NYS-8 Sop.)Safe Shutdown
Aging Management
Main transformer failure
ML12334A48014 March 2011Official Exhibit - NYS000021-00-BD01 - Oecd, Nuclear Energy Agency, Operating Experience Report: Recent Failures of Large Oil-Filled Transformers, NEA/CNRA/R(2001)6 (Mar. 14, 2011) (Nea Report)Safe Shutdown
Earthquake
ML12334A48112 December 2011Official Exhibit - NYS000031-00-BD01 - FPL (L2010-272), Licensee Event Report 2010-003-00, Reactor Trip Due to Fault on 230kV Side of Generator Step-Up Transformer, Turkey Point Unit 3, NRC Docket 50-250 (Nov. 19, 2010) (Turkey Point 3 LERLoop seal
ML12334A48312 December 2011Official Exhibit - NYS000027-00-BD01 - (DTE Energy (NRC-10-0043), Licensee Event Report 2010-001, Automatic Reactor Shutdown Due to Generator Current Transformer Wiring Failure, Fermi 2, NRC License No. NPF-43, NRC Docket No. 50-341 (May 19
ML12334A4849 December 2011Official Exhibit - NYS000044-00-BD01 - Declaration of Assistant Attorney General Lisa M. Burianek (Pft Burianek Decl. NYS-8)Aging Management
ML12334A48520 July 2009Official Exhibit - NYS000025-00-BD01 - Exelon Nuclear, Licensee Event Report 09-001-00, Automatic Reactor Scram Due to Failure of Main Power Transformer Surge Arrestor, LaSalle County Station Unit 1 (Jul. 20, 2009)
ML12334A48612 December 2011Official Exhibit - NYS000033-00-BD01 - Wayne Parry, Nj'S Oyster Creek Must Replace New Transformer, Associated Press (Dec. 10, 2010) (Parry Article)
ML12334A48812 December 2011Official Exhibit - NYS000040-00-BD01 - EN Large Power Transformer Status (Feb. 15, 2007) (Transformer Status)Power change
ML12334A48912 December 2011Official Exhibit - NYS000004-00-BD01 - Curriculum Vitae of Robert C. Degeneff (2011 Degeneff Cv)
ML12334A49218 July 2005Official Exhibit - NYS000041-00-BD01 - E-mail; July 18, 2005 6:26 PM; Subject: IPEC Transformer Review; from: J. Bonner; to: G. Bijoor, T.S. Mccaffrey, V. Andreozzi; CC: R. Penny, J. Bonner, D. Morris (Jul 18, 2005 Email)
ML12334A49412 December 2011Official Exhibit - NYS000012-00-BD01 - NUREG/CR-5753, Aging of Safety Class Transformers in Safety Systems of Nuclear Power Plants (February 1996) (NUREG/CR-5753)Probabilistic Risk Assessment
Main transformer failure
ML12334A49612 December 2011Official Exhibit - NYS000010-00-BD01 - IEEE Standard Dictionary of Electrical and Electronic Terms, IEEE Std 100-1996, 6th Edition (1996), Excerpted: P. 1131 (IEEE Dictionary)
ML12334A49712 December 2011Official Exhibit - NYS000028-00-BD01 - PSEG Nuclear LLC (LR-N10-0320), Licensee Event Report 272/2010-002, Automatic Reactor Trip Due to Main Power Transformer Bushing Failure, Salem Nuclear Generating Station Unit 1 (Sept. 2, 2010)Arc flash
ML12334A49812 December 2011Official Exhibit - NYS000030-00-BD01- Event Notification Report, Watts Bar Unit 1, Manual Reactor Trip Due to Loss of Cooling to the a Phase Main Bank Transformer, Event Number: 46418, Notification Date: 11/14/2010 (Watts Bar 1 LER 46418)
ML12334A49915 October 2008Official Exhibit - NYS000022-00-BD01 - PG&E Letter DCL-08- 089, Licensee Event Report 2-2008-001-00, Reactor Trip Due to Main Electrical Transformer Failure, Diablo Canyon Unit 2, Docket No. 50-323 (Oct. 15, 2008) (Diablo Canyon 2 LER 2-200
ML12334A50125 March 2011Official Exhibit - NYS000037-00-BD01 - Exelon Nuclear (RA11-013), Licensee Event Report 2011-001-00, Automatic Reactor Scram Due to Main Power Transformer C Phase Electrical Fault, LaSalle County Station Unit 1 (Mar. 25, 2011)
ML12334A50312 December 2011Official Exhibit - NYS000035-00-BD01 - Preliminary Notification of Event or Unusual Occurrence (PNO-III-11-012A), Perry Nuclear Power Plant, Docket No. 50-440, License No. NPF-58, Perry Unplanned Shutdown Greater than 72 Hours (Update) (Oct
ML12334A50512 December 2011Official Exhibit - NYS000032-00-BD01 - Entergy (NL-11-005), Licensee Event Report 2010-009-00, Automatic Reactor Trip Due to a Turbine Generator Trip Caused by a Fault of the 21 Main Transformer Phase B High Voltage Bushing, Indian Point UnOffsite Circuit
ML12334A50631 December 2004Official Exhibit - NYS000008-00-BD01 - Harlow, James H., Electric Power Transformer Engineering, CRC Press, (2004), Excerpted: Pp. XI, 2- 1 - 2-2 (2004 Harlow)
ML12334A50712 December 2011Official Exhibit - NYS000009-00-BD01 - Harlow, James H., Electric Power Transformer Engineering, 2nd Edition, CRC Press (2007), Excerpted: Pp. v-vi, 2-1 - 2-2 (2007 Harlow)
ML12334A50812 December 2011Official Exhibit - NYS000017-00-BD01 - IEEE Guide for the Evaluation and Reconditioning of Liquid Immersed Power Transformers (C57.140TM-2006) (April 2007) Excerpted: pp.iv-v, 11-26 (2007 IEEE Report)
ML12334A50912 December 2011Official Exhibit - NYS000016-00-BD01 - Nuclear Power Plant License Renewal; Revisions, 60 Fed. Reg. 22,461 (May 8, 1995) (SOC, 60 Fed. Reg. 22,461)License Renewal
Backfit
ML12334A51030 September 2010Official Exhibit - NYSR00011-00-BD01 - IEEE Standard Terminology for Power and Distribution Transformers, IEEE Std C57.12.80TM-2010 (Sept. 30, 2010), Excerpted: Pp. 39-41 (IEEE Standard Terminology)
ML12334A5119 December 2011Official Exhibit - NYSR00003-00-BD01 - Pre-filed Testimony of Robert C. Degeneff (Degeneff Pft)Aging Management
ML12334A51212 December 2011Official Exhibit - NYSR00005-00-BD01 - Report of Robert C. Degeneff (December 2011) (2011 Degeneff Report)Safe Shutdown
Arc flash
Aging Management
Main transformer failure
Power change
ML12334A51330 September 2010Official Exhibit - NYS000058-00-BD01 - NYISO, 2010 Reliability Needs Assessment Final Report (September 2010) Excerpted: Pp. ES-I 4, 9, 12, 17, C-3, C-4 (2010 NYISO Rna Report)
ML12334A51413 December 2011Official Exhibit - NYS000047-00-BD01 - Pre-filed Testimony of Peter J. Lanzalotta (Lanzalotta Pft)
ML12334A51514 December 2011Official Exhibit - NYS000094-00-BD01 - Empire Generating Co., LLC, Project Timeline as of May 19, 2010 (2010 Empire Project Timeline)
ML12334A51614 December 2011Official Exhibit - NYS000085-00-BD01 - Wind Integration Study - Final Report, Prepared for Xcel Energy and the Minnesota Department of Commerce by Enernex Corporation and Wind Logics, Inc. Sept. 28, 2004) Excerpted: Project Summary
ML12334A51714 December 2011Official Exhibit - NYS000087-00-BD01 - the Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations, Report on Phase 1, Preliminary Overall Reliability Assessment (2004) Excerpted: Pp. ii-iii, vi-ix, 2.
ML12334A51813 December 2011Official Exhibit - NYS000046-00-BD01 - Pre-filed Testimony of David A. Schlissel (Schlissel Pft)License Renewal
ML12334A51927 February 2009Official Exhibit - NYS000053-00-BD01 - Declaration of David A. Schlissel (Feb. 27, 2009)
ML12334A52014 December 2011Official Exhibit - NYS000064-00-BD01 - NYISO, Reliability Summary 2009-2018 Excerpted: Pp. 5-6 (2009-2018 NYISO Reliability Summary)
ML12334A5218 December 2009Official Exhibit - NYS000071-00-BD01 - GE Financial Services, New Jersey'S and New York City'S Electricity Systems Now Talking to Each Other, Thanks to Ge'S Smart Grid Technology & Smart Capital, Press Release (Dec. 8, 2009) (2009 Smart Pre
ML12334A52226 May 2010Official Exhibit - NYS000073-00-BD01 - Cavallo Energy, Cavallo Cross Hudson Management LLC Accepting Open Season Applications for New Transmission Capacity from New Jersey to New York (May 26, 2010) (2010 Cavallo Press Release)
ML12334A52327 May 2010Official Exhibit - NYS000057-00-BD01 - NYISO, 2010 Summer Outlook. (May 27, 2010) (2010 NYISO Summer Outlook)
ML12334A5248 September 2010Official Exhibit - NYS000072-00-BD01 - NYS PSC, Commission Approves Transmission Line to NYS: Power Line Would Improve Reliability, Increase Supply, Press Release (Sept. 8, 2010) (2010 NYS PSC Press Release)
ML12334A52513 December 2011Official Exhibit - NYS000048-00-BD01 - Pre-filed Testimony of Peter A. Bradford (Bradford Pft)Chernobyl
ML12334A52630 September 2010Official Exhibit - NYS000070-00-BD01 - NYISO, Growing Wind: Final Report of the NYISO 2010 Wind Generation Study (September 2010) Excerpted: Pp. i-v (2010 NYISO Growing Wind Report)
ML12334A52721 April 2009Official Exhibit - NYS000075-00-BD01 - NYS PSC, PSC Correspondence, Case No. 06-T- 0650,(Issued Apr. 21, 2009) (April 2009 NYS PSC Correspondence)
ML12334A52814 December 2011Official Exhibit - NYS000083-00-BD01 - NYSERDA, Combined Heat and Power, Market Potential for New York State Final Report 02-12 (October 2002) Excerpted: ES-1-ES-11 (2002 NYSERDA Final Report)
ML12334A52914 December 2011Official Exhibit - NYS000091-00-BD01 - Astoria Repowering Project, Progress Report to Stakeholders and Interested Parties (July 2010) (2010 Astoria Repowering Report)
ML12334A53114 December 2011Official Exhibit - NYS000050-00-BD01 - Curriculum Vitae of David A. Schlissel (2011 Schlissel Cv)
ML12334A53214 December 2011Official Exhibit - NYS000082-00-BD01- New York'S Solar Roadmap; a Plan for Energy Reliability, Security, Environmental Responsibility and Economic Development in New York State (May 2007) Excerpted: Executive Summary (Solar Roadmap)
ML12334A53423 June 2008Official Exhibit - NYS000061-00-BD01 - NYS PSC, Order, Establishing Energy Efficiency Portfolio Standard and Appraising Programs, Case No. 07-M-0548 (Jun. 23, 2008) Excerpted: Pp. 1-3 (June 2008 NYS PSC Order)
ML12334A5351 April 2009Official Exhibit - NYS000078-00-BD01 - Report and Recommendations Concerning the Little Gypsy Unit 3 Repowering Project, Submitted by Entergy Louisiana to the Louisiana Public Service Commission (Apr. 1, 2009)
ML12334A53614 December 2011Official Exhibit - NYS000093-00-BD01 - NYPA, NYPA to Cease Operations of Queens Power Plant on January 31st Press Release (Jan. 29, 2010) (2010 NYPA Press Release)
ML12334A53714 December 2011Official Exhibit - NYS000067-00-BD01 - Governor David a Paterson, Our Time to Lead: State of the State Address (2009) (2009 Paterson Address)
ML12334A53816 July 2010Official Exhibit - NYS000074-00-BD01 - London Economics International, LLC, Projected Energy Market, Capacity Market and Emissions Impact Analysis of the Champlain-Hudson Power Express Transmission Project for New York (7/16/2011) Excerpted