ML20054F906 | 14 June 1982 | Testimony of Ps Barry,Ck Seaman & Ranganath Re Preservice & Inservice Insp Program & Reactor Pressure Vessel Integrity.Certificate of Svc Encl | Nondestructive Examination Liquid penetrant |
ML20054F912 | 14 June 1982 | Testimony of Jj Boseman,Rm Crawford,F Hayes,Jj Kreps & Jl Smith Re Implementation of NUREG-0737,Item II.K.3.16 Concerning Reduction of Challenges & Failures of Relief Valves.Schematic of three-stage Pilot Operated Valve Encl | Feedwater Controller Failure Backfit |
ML20054G420 | 17 June 1982 | Transcript of 820617 OL Hearing in Hauppauge,Ny.Pp 4,520-4,656 & 4,748-4,775.Supporting Documentation Encl | Affidavit |
ML20054G662 | 18 June 1982 | Transcript of 820618 Hearing in Hauppauge,Ny.Pp 4,776-4,991 | Safe Shutdown Anticipated operational occurrence Safe Shutdown Earthquake Systematic Assessment of Licensee Performance Earthquake |
ML20054H532 | 22 June 1982 | Transcript of 820622 Hearing in Riverhead,Ny.Pp 4,992-5,166 | Safe Shutdown Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment Earthquake Turbine Missile Fire Watch Scaffolding |
ML20054H607 | 26 May 1982 | Statement to Be Entered in 820526 Hearing Record Opposing Opening of Plant | |
ML20054H886 | 23 June 1982 | Transcript of 820623 OL Hearing in Riverhead,Ny. Pp 5,167-5,339.Supporting Documentation Encl | Safe Shutdown Loop seal Scram Discharge Volume Backfit Failure to Scram |
ML20054J212 | 24 June 1982 | Transcript of 820624 OL Hearing in Riverhead,Ny.Pp 5,340- 5,533.Supporting Documentation Encl | Reactor Vessel Water Level Packing leak |
ML20054J730 | 25 June 1982 | Transcript of 820625 Hearing in Riverhead,Ny.Pp 5,534-5,700 | Safe Shutdown High winds Half scram Internal Flooding Probabilistic Risk Assessment Excess Flow Check Valve Earthquake |
ML20054K302 | 29 June 1982 | Testimony of RB Hubbard Re Suffolk County Contentions 12,13, 14 & 15 on Qa/Qc.Lack of Necessary Detail or Scope of Operating QA Program Precludes Finding That Util Will Meet Regulatory Requirements | Safe Shutdown Stroke time Coatings Nondestructive Examination Condition Adverse to Quality Biofouling Fire Watch Dissimilar Metal Weld Scaffolding |
ML20054K311 | 29 June 1982 | Testimony of Gc Minor Re Suffolk County Contention 16 on Atws.Present Standby Liquid Control Sys Inadequate to Mitigate Range of ATWS Consequences That Could Occur.Sys Should Be Automated & Flow Increased.W/Certificate of Svc | Anticipated operational occurrence Probabilistic Risk Assessment Scram Discharge Volume |
ML20054L542 | 1 July 1982 | Rebuttal Testimony of Jh Conran Re Applicant Testimony on Safety Classification & Analysis of Structures,Sys & Components.Certificate of Svc Encl.Related Correspondence | Safe Shutdown Safe Shutdown Earthquake Hydrostatic Earthquake |
ML20054L584 | 6 July 1982 | Transcript of 820706 Hearing in Riverhead,Ny.Pp 5,701-5,832 | Ultimate heat sink |
ML20054M089 | 7 July 1982 | Transcript of 820707 OL Hearing in Riverhead,Ny.Pp 5,835- 6,033 | Probabilistic Risk Assessment Failure to Scram |
ML20054M252 | 14 June 1982 | Corrections & Additions to Testimony of Ps Barry,Ck Seaman & Ranganath Re Suffolk County Contention 25 & Shoreham Opponents Coalition Contention 19(a).Certificate of Svc Encl | Nondestructive Examination Liquid penetrant |
ML20054M377 | 9 July 1982 | Transcript of 820709 OL Hearing in Riverhead,Ny.Pp 6,238- 6,412.Supporting Documentation Encl | |
ML20055A101 | 13 July 1982 | Transcript of 820713 Hearing in Riverhead,Ny.Pp 6,413-6,605 | Probabilistic Risk Assessment Failure to Scram |
ML20055A283 | 14 July 1982 | Transcript of 820714 OL Hearing in Riverhead,Ny. Pp 6,606-6,823 | Probabilistic Risk Assessment Fuel cladding Backfit |
ML20055A658 | 15 July 1982 | Transcript of 820715 Hearing in Riverhead,Ny.Pp 6,824-7,014 | Non-Destructive Examination Affidavit |
ML20055B060 | 16 July 1982 | Transcript of 820716 Hearing in Riverhead,Ny.Pp 7,015-7,168 | Earthquake Affidavit |
ML20055B454 | 20 July 1982 | Transcript of 820720 Hearing in Riverhead,Ny.Pp 7,169-7,421 | Siren |
ML20055B492 | 19 July 1982 | Page 3 to Rf Alexander Testimony Re Suffolk County & Shoreham Opponents Coalition Contention 12 & County Contentions 13,14 & 15,inadvertently Omitted from Original Testimony | |
ML20055B750 | 21 July 1982 | Transcript of 820721 Hearing in Riverhead,Ny.Pp 7,422-7,681 | High winds Anticipated operational occurrence Probabilistic Risk Assessment Operating Basis Earthquake Design basis earthquake Earthquake Backfit |
ML20058C132 | 22 July 1982 | Transcript of 820722 OL Hearing in Riverhead,Ny.Pp 7,682- 7,904.Supportive Info Encl | |
ML20058G089 | 30 July 1982 | Transcript of 820730 Hearing in Riverhead,Ny.Pp 8,514-8,686 | |
ML20058H722 | 5 August 1982 | Transcript of 820805 Hearing in Riverhead,Ny.Pp 9,134-9,302 | Probabilistic Risk Assessment Scram Discharge Volume Fuel cladding Coast down Weak link Failure to Scram |
ML20058J515 | 10 August 1982 | Testimony of CE Rossi & Jl Mauck on Suffolk County Contention 27 & Shoreham Opponents Coalition Contention 3 Re Instrumentation for post-accident Monitoring.Compliance W/Reg Guide 1.97 Not Yet Determined.Certificate of Svc Encl | Earthquake |
ML20062C616 | 3 August 1982 | Transcript of 820803 Hearing in Riverhead,Ny,Pp 8,687-8,892. Supporting Documentation Encl | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Operator Manual Action Abnormal operational transient Scram Discharge Volume Backfit Power change Locktite Failure to Scram |
ML20062D570 | 4 August 1982 | Transcript of 820804 Hearing in Riverhead,Ny.Pp 8,893-9,133 | |
ML20063M343 | 31 August 1982 | Further Supplemental Testimony of Jj Boseman on Behalf of Applicant Re Polymerization of Safety Relief Valve Lubricants.Supporting Documentation & Certificate of Svc Encl.Related Correspondence | |
ML20065P619 | 12 October 1982 | Testimony of AC Kanen,Jh Johnson,S Cole & KT Erikson on Contentions EP 2B & 5B Re Traffic Congestion Issues | |
ML20065P632 | 12 October 1982 | Testimony of KT Erikson & Cole on Contention EP 5A Re Role Conflict | |
ML20065P640 | 12 October 1982 | Testimony of Gc Minor on Contentions EP 10B & EP 10C Re Radiation Monitoring & EP 14 Re Dose Assessment | Grab sample |
ML20065P644 | 12 October 1982 | Testimony of Fc Finlayson on Contention EP 14 Re Accident Assessment & Dose Assessment Models.Certificate of Svc Encl | Grab sample Probabilistic Risk Assessment |
ML20069G460 | 23 March 1983 | Supplemental Testimony of MW Goldsmith,Rb Hubbard & Gc Minor on Unresolved Safety Issue A-47, Sys Interaction & on Safety Classification.Nrc Progress Toward Resolving A-47 Inadequate.Certificate of Svc Encl.Related Correspondence | Internal Flooding |
ML20069H516 | 30 March 1983 | Proposed Transcript Corrections for Qa/Qc & Environ Qualification Portions of Record | |
ML20072A572 | 18 January 1983 | Testimony of Gc Minor Re Suffolk County Contention 8 & Shoreham Opponents Coalition Contention 19(h) Re Environ Qualification.Decision on Inclusion of Equipment in Environ Qualification Program Not Documented.W/Certificate of Svc | Safe Shutdown |
ML20072A593 | 17 January 1983 | Supplemental Testimony of Ld Johnson Re Torrey Pines Technology Independent Verification.Rept Took Into Account Fact That More than One Discrepancy or Condition May Be Included in Discrepancy Rept.W/Certificate of Svc | |
ML20072A631 | 19 January 1983 | Revised Testimony of RM Kascsak,Jf Etzweiler,Jg Gleason, Rj Najuch,Wr Shosho & Nr Woodward on Suffolk County Contention 8/Shoreham Opponents Coalition Contention 19(h) on Environ Qualifications.Certificate of Svc Encl | Safe Shutdown |
ML20077K474 | 10 January 1983 | Testimony of WE Gunther,Jm Kelly,Ar Muller & W Steiger Re Portions of Suffolk County Contention 13 on IE Insp Rept 50-322/82-34.Certificate of Svc Encl.Related Correspondence | |
ML20079F458 | 16 January 1984 | Amended Direct Testimony of Rc Roberts,Jl Monteith, P Mcguire,Mj Turano & J Michel on Emergency Planning Contentions 65 & 23.H Re Evacuation Time Estimates & Emergency Planning Zone Access Control | Fitness for Duty |
ML20079F480 | 16 January 1984 | Supplemental Direct Testimony of G Jeffers & AR Rossi Re Contentions 25.C & 25.D | |
ML20079F489 | 16 January 1984 | Supplemental Direct Testimony of RW Petrilak on Contentions 25.C & 25.D Re Role Conflict | |
ML20079F491 | 16 January 1984 | Supplemental Direct Testimony of Lj Campo on Emergency Planning Contentions 25.C & 25.D Re Role Conflict Addressed in Rev 3 of Lilco Plan | |
ML20079F496 | 16 January 1984 | Supplemental Direct Testimony of Bw Pigozzi on Contention 65 Re Evacuation Time Estimates | |
ML20079F691 | 16 January 1984 | Supplemental Testimony of Mc Cordaro,Ja Weismantle & Eb Lieberman on Phase II Emergency Planning Contentions 23.D & 65.Certificate of Svc Encl | |
ML20079G448 | 17 January 1984 | Supplemental Direct Testimony of Nj Muto & Jt Smith on Contention 25 Re Role Conflict Addressed in Rev 3 to Lilco Emergency Plan.Certificate of Svc Encl | |
ML20079L796 | 17 February 1983 | Corrected P 8 of RAT Testimony Filed on 830215 | |
ML20079L989 | 22 February 1983 | Supplemental Testimony of Wj Museler,Tt Arrington & J Kelly Re Violations Propounded in IE Insp Rept 50-322/83-02. Certificate of Svc Encl.Related Correspondence |