B12661, Proposed Tech Specs,Allowing Positive Moderator Temp Coefficient at Reactor Power Levels Less than 100% to Support Cycle 2 Reload | 30 September 1987 | Proposed Tech Specs,Allowing Positive Moderator Temp Coefficient at Reactor Power Levels Less than 100% to Support Cycle 2 Reload | Boric Acid Shutdown Margin |
B12670, Proposed Tech Specs,Revising Tech Spec 3.7.A.3, to Delete Permission to Perform Open Vessel Reactivity Tests | 18 December 1987 | Proposed Tech Specs,Revising Tech Spec 3.7.A.3, to Delete Permission to Perform Open Vessel Reactivity Tests | |
B12686, Proposed Tech Specs,Deleting Instrument Error Analysis Criteria Applicable to manual-type Integrated Leak Rate Test Data acquisition-reduction Processing | 28 December 1987 | Proposed Tech Specs,Deleting Instrument Error Analysis Criteria Applicable to manual-type Integrated Leak Rate Test Data acquisition-reduction Processing | |
B12692, Proposed Tech Spec Pages 3/4 4-8,3/4 9-1,3/4 9-1a,5-5 & B 3/4 9-1,changing Requirements for Cycle 2 Operation.Safety Evaluation Encl | 30 September 1987 | Proposed Tech Spec Pages 3/4 4-8,3/4 9-1,3/4 9-1a,5-5 & B 3/4 9-1,changing Requirements for Cycle 2 Operation.Safety Evaluation Encl | Shutdown Margin |
B12699, Proposed Tech Spec Pages 3/4 8-1 & 3/4 8-6 Re Radioactive Liquid/Gaseous Effluent Instrumentation | 25 July 1989 | Proposed Tech Spec Pages 3/4 8-1 & 3/4 8-6 Re Radioactive Liquid/Gaseous Effluent Instrumentation | |
B12724, Revised Inservice Insp Testing Program. W/12 Oversize Drawings | 31 October 1987 | Revised Inservice Insp Testing Program. W/12 Oversize Drawings | Boric Acid High Radiation Area Stroke time Power Operated Valves |
B12727, Proposed Tech Spec 3.12 Adding Operability Requirements on Offsite & Onsite Power Sources W/Limiting Conditions for Operation & Time Requirements for Corrective Actions | 17 November 1987 | Proposed Tech Spec 3.12 Adding Operability Requirements on Offsite & Onsite Power Sources W/Limiting Conditions for Operation & Time Requirements for Corrective Actions | Offsite Circuit |
B12738, Proposed Tech Specs,Eliminating Control Bldg Ventilation Chlorine Detectors | 4 December 1987 | Proposed Tech Specs,Eliminating Control Bldg Ventilation Chlorine Detectors | |
B12784, Proposed Tech Specs,Revising Integrated Leak Rate Test | 5 January 1988 | Proposed Tech Specs,Revising Integrated Leak Rate Test | |
B12792, Proposed Tech Specs Re RCS Leakage Detection Sys | 5 February 1988 | Proposed Tech Specs Re RCS Leakage Detection Sys | Grab sample |
B12813, Proposed Tech Specs Re Halon 1301 Sys & Fire Detection Equipment | 9 February 1988 | Proposed Tech Specs Re Halon 1301 Sys & Fire Detection Equipment | Continuous fire watch |
B12814, Proposed Tech Specs,Revising Voltage for Primary Side of Emergency Station Svcs Transformer | 31 July 1989 | Proposed Tech Specs,Revising Voltage for Primary Side of Emergency Station Svcs Transformer | |
B12815, Proposed Tech Specs,Changing Tech Specs Section 3.4.9.3 to Change Min RCS Vent Area Required for Cold Overpressure Protection from 7.0 to 5.4 Square Inches | 18 February 1988 | Proposed Tech Specs,Changing Tech Specs Section 3.4.9.3 to Change Min RCS Vent Area Required for Cold Overpressure Protection from 7.0 to 5.4 Square Inches | |
B12820, Proposed Tech Spec 4.7.6.1.e.3 Re Test Method for Control Room Air in-leakage | 9 February 1988 | Proposed Tech Spec 4.7.6.1.e.3 Re Test Method for Control Room Air in-leakage | |
B12828, Proposed Tech Specs,Renumbering Manual High Pressure Safety Injection Throttle Valves for Consistency W/Plant Loop Numbering Scheme | 25 February 1988 | Proposed Tech Specs,Renumbering Manual High Pressure Safety Injection Throttle Valves for Consistency W/Plant Loop Numbering Scheme | |
B12864, Northeast Nuclear Energy Co Millstone Unit 2 Reactor Containment Bldg Integrated Leak Rate Test | 31 May 1988 | Northeast Nuclear Energy Co Millstone Unit 2 Reactor Containment Bldg Integrated Leak Rate Test | |
B12865, Startup Test Rept,Cycle 9 | 30 April 1988 | Startup Test Rept,Cycle 9 | |
B12879, Proposed Rev to Tech Specs Re Primary Sys Boundary Monitoring Locations | 30 April 1988 | Proposed Rev to Tech Specs Re Primary Sys Boundary Monitoring Locations | |
B12888, Proposed Tech Specs,Allowing Startup of Plant While Utilizing Provisions of Tech Spec 3.6.3 | 15 April 1988 | Proposed Tech Specs,Allowing Startup of Plant While Utilizing Provisions of Tech Spec 3.6.3 | |
B12902, Assessment of Reverse Direction Testing of Containment Isolation Valves | 31 May 1988 | Assessment of Reverse Direction Testing of Containment Isolation Valves | Exemption Request |
B12904, Revised Sections of Inservice Insp Program,Including Section 4.1, Methodology of Weld Selection for Class 1 Category Components & Welds & Section 4.3, Class I Isometric Drawings (Sub-Indexed by Zone). W/Four Oversize Drawings | 31 May 1988 | Revised Sections of Inservice Insp Program,Including Section 4.1, Methodology of Weld Selection for Class 1 Category Components & Welds & Section 4.3, Class I Isometric Drawings (Sub-Indexed by Zone). W/Four Oversize Drawings | Hydrostatic Anchor Darling B.5.b Dissimilar Metal Weld |
B12913, Proposed Tech Specs Re Diesel Fuel Oil Surveillance Requirements | 14 June 1988 | Proposed Tech Specs Re Diesel Fuel Oil Surveillance Requirements | |
B12915, Proposed Tech Specs Re Administrative controls-reporting Requirements | 25 May 1988 | Proposed Tech Specs Re Administrative controls-reporting Requirements | Annual Radiological Environmental Operating Report |
B12931, Proposed Tech Specs Re Electrical Power Sys | 21 July 1988 | Proposed Tech Specs Re Electrical Power Sys | Boric Acid |
B12934, Core Xv Startup Physics Test Rept | 31 May 1988 | Core Xv Startup Physics Test Rept | Shutdown Margin |
B12967, Proposed Tech Spec Changes Incorporating New Section of Sprinkler Protection in Turbine Bldg & Reduction in Number of Smoke Detectors Available in Containment from 23 to 22 | 13 September 1988 | Proposed Tech Spec Changes Incorporating New Section of Sprinkler Protection in Turbine Bldg & Reduction in Number of Smoke Detectors Available in Containment from 23 to 22 | |
B12979, Proposed Tech Specs 3.12 & 4.2 Re Addition of Operability Requirements for Offsite & Onsite Power Sources W/Limiting Conditions for Operations & Time Requirements for Corrective Actions to Station Service Power,Respectively | 31 August 1988 | Proposed Tech Specs 3.12 & 4.2 Re Addition of Operability Requirements for Offsite & Onsite Power Sources W/Limiting Conditions for Operations & Time Requirements for Corrective Actions to Station Service Power,Respectively | |
B12985, Proposed Tech Specs Re Containment Isolation Valves | 2 September 1988 | Proposed Tech Specs Re Containment Isolation Valves | |
B12987, Proposed Tech Specs,Adding Alternate Means of Analyzing Containment Integrated Leakage Rate Test Results | 11 August 1988 | Proposed Tech Specs,Adding Alternate Means of Analyzing Containment Integrated Leakage Rate Test Results | Exemption Request |
B13007, Proposed Tech Spec Changes Stating That Penalty for Undetected Fouling of Feedwater Venturis of 0.1% Is Added to Flow Measurement Uncertainty Values If Venturis Not Cleaned at Least Once Per 18 Months | 2 September 1988 | Proposed Tech Spec Changes Stating That Penalty for Undetected Fouling of Feedwater Venturis of 0.1% Is Added to Flow Measurement Uncertainty Values If Venturis Not Cleaned at Least Once Per 18 Months | |
B13013, Proposed Tech Specs,Allowing Operation Beyond Projected End of Core Life for Current Cycle 9 | 20 September 1988 | Proposed Tech Specs,Allowing Operation Beyond Projected End of Core Life for Current Cycle 9 | Fuel cladding |
B13017, Proposed Tech Specs Clarifying Intent of Tech Spec 4.4.5.1.4.a.8 Re Extent & Origination Point of Steam Generator Tube Exams | 13 September 1988 | Proposed Tech Specs Clarifying Intent of Tech Spec 4.4.5.1.4.a.8 Re Extent & Origination Point of Steam Generator Tube Exams | Operating Basis Earthquake |
B13032, Proposed Tech Specs Pages 3/4 4-7,3/4 4-9,B 3/4 4-2a & B 3/4 4-3 Re Surveillance Requirements for RCS Leakage | 30 September 1988 | Proposed Tech Specs Pages 3/4 4-7,3/4 4-9,B 3/4 4-2a & B 3/4 4-3 Re Surveillance Requirements for RCS Leakage | Earthquake Pressure Boundary Leakage |
B13041, Rev 1 to Haddam Neck Plant Third 10 Yr Interval Inservice Testing Program | 31 October 1988 | Rev 1 to Haddam Neck Plant Third 10 Yr Interval Inservice Testing Program | Boric Acid Stroke time Power Operated Valves |
B13056, Proposed Tech Specs Amending Sections 1.0,3/4.2,3/4.9, 3/4.10,3/4.11,5.0 & 6.0 | 26 October 1988 | Proposed Tech Specs Amending Sections 1.0,3/4.2,3/4.9, 3/4.10,3/4.11,5.0 & 6.0 | Safe Shutdown Boric Acid Shutdown Margin Packing leak High Radiation Area Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
B13079, Proposed Tech Specs Changes Per Generic Ltr 87-09 | 9 August 1990 | Proposed Tech Specs Changes Per Generic Ltr 87-09 | Safe Shutdown Fire Barrier Hydrostatic Offsite Circuit Continuous fire watch Fire Watch Grace period |
B13089, Proposed Tech Specs,Providing for New Limiting Conditions for Operation,Surveillance Requirements & Nominal Setpoints for New 4160 Volt Bus Undervoltage/Timing Relay Input Circuits & loss-of-normal Power Actuation Circuits Mods | 31 December 1988 | Proposed Tech Specs,Providing for New Limiting Conditions for Operation,Surveillance Requirements & Nominal Setpoints for New 4160 Volt Bus Undervoltage/Timing Relay Input Circuits & loss-of-normal Power Actuation Circuits Mods | Scram Discharge Volume |
B13098, Proposed Tech Specs Re Administrative Controls & Organizational Charts | 13 March 1989 | Proposed Tech Specs Re Administrative Controls & Organizational Charts | Safe Shutdown High Radiation Area Offsite Dose Calculation Manual Fire Barrier |
B13127, Proposed Tech Specs,Revising Info on Core Exit Thermocouples,Main Stack wide-range Noble Gas Monitor, Reactor Vessel Water Level & RCS Subcooling Margin Monitor, Per Generic Ltr 83-37 | 1 March 1989 | Proposed Tech Specs,Revising Info on Core Exit Thermocouples,Main Stack wide-range Noble Gas Monitor, Reactor Vessel Water Level & RCS Subcooling Margin Monitor, Per Generic Ltr 83-37 | Reactor Vessel Water Level |
B13151, Proposed Tech Specs 3/4.1, Reactivity Control Sys | 6 March 1989 | Proposed Tech Specs 3/4.1, Reactivity Control Sys | Boric Acid Shutdown Margin |
B13164, Proposed Tech Specs Allowing Storage of Fuel W/Max Enrichment Up to 5.05 Weight Percent U-235 Fuel in Safe & Subcritical Configuration During All Normal & Abnormal Conditions | 30 April 1989 | Proposed Tech Specs Allowing Storage of Fuel W/Max Enrichment Up to 5.05 Weight Percent U-235 Fuel in Safe & Subcritical Configuration During All Normal & Abnormal Conditions | Shutdown Margin Tornado Missile Hydrostatic |
B13169, Proposed Tech Specs,Revising Sections 3.6, Core Cooling Sys, 3.7, Min Water Vol & Boron Concentration in Refueling Water Storage Tank & 4.3, Core Cooling Sys-Periodic Testing, to Combine Into New Section 3.6, Eccs | 30 April 1989 | Proposed Tech Specs,Revising Sections 3.6, Core Cooling Sys, 3.7, Min Water Vol & Boron Concentration in Refueling Water Storage Tank & 4.3, Core Cooling Sys-Periodic Testing, to Combine Into New Section 3.6, Eccs | |
B13181, Proposed Tech Spec Sections 3/4.4,3/4.6 & 3/4.7 Re RCS | 30 June 1989 | Proposed Tech Spec Sections 3/4.4,3/4.6 & 3/4.7 Re RCS | |
B13201, Proposed Tech Specs Re Containment Integrity,Internal Pressure & Air Recirculation Sys to Allow Four Containment Air Recirculation Fan Motor HXs to Be Cleaned or Replaced While at Power | 31 March 1989 | Proposed Tech Specs Re Containment Integrity,Internal Pressure & Air Recirculation Sys to Allow Four Containment Air Recirculation Fan Motor HXs to Be Cleaned or Replaced While at Power | |
B13208, Proposed Tech Specs Supporting Operation of Cycle 15 | 30 April 1989 | Proposed Tech Specs Supporting Operation of Cycle 15 | |
B13221, Proposed Tech Specs Re Inservice Insp of Steam Generator Tubes & Acceptance Criteria for Tubes | 29 June 1989 | Proposed Tech Specs Re Inservice Insp of Steam Generator Tubes & Acceptance Criteria for Tubes | Operating Basis Earthquake Earthquake |
B13231, Rev 2 to First 10-Yr Interval Inservice Insp Plan Summary | 31 May 1989 | Rev 2 to First 10-Yr Interval Inservice Insp Plan Summary | Hydrostatic VT-2 |
B13256, Proposed Tech Specs,Revising Administrative Controls for Radiological Effluent Monitoring Manual | 25 May 1989 | Proposed Tech Specs,Revising Administrative Controls for Radiological Effluent Monitoring Manual | High Radiation Area Offsite Dose Calculation Manual Process Control Program |
B13269, Proposed Tech Specs Sections 2.0 & 3/4.3 Re Safety Limits & Limiting Safety Sys Settings & Instrumentation | 23 June 1989 | Proposed Tech Specs Sections 2.0 & 3/4.3 Re Safety Limits & Limiting Safety Sys Settings & Instrumentation | Boric Acid Grab sample Anticipated operational occurrence Operating Basis Earthquake Fuel cladding Continuous fire watch Fire Protection Program Fire Watch |
B13284, Proposed Tech Spec 3.6 Re ECCS | 31 July 1989 | Proposed Tech Spec 3.6 Re ECCS | |