 Issue dateTitleTopic
ML09191018815 July 2009Request for Additional Information (RAI) Regarding the Proposal to Change the Scope of the Steam Generator Tube Inspections
ML09202034913 August 2009Request for Additional Information Regarding the Upgrade of Emergency Core Cooling System Requirements Per NUREG-1431
ML0927207722 October 2009Request for Additional Information Regarding the Upgrade of Emergency Core Cooling System Requirements Per NUREG-1431
ML09278033514 October 2009Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage During Design-Basis Accidents at Pressurized-Water Reactors.
ML1006208999 March 2010Request for Additional Information Regarding the Core Operating Limits Report (TAC Nos. ME1193 and ME1165)
ML1014800187 June 2010Request for Additional Information Regarding the 90-Day and 180-Day Steam Generator Tube Inspection Reports for Cycle 16 Refueling Outage
ML1015300379 June 2010Request for Additional Information Regarding Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
ML1105401318 March 2011Units 1 & 2, Request for Additional Information Regarding Cyber Security Plans Based on Nuclear Energy Institute 08-09, Revision 6Cyber Security
ML11122A11324 May 2011RAI Regarding Decommissioning Funding Status Report (TAC Nos. ME5455, ME5456, ME5457, ME5535, ME5536, and 5551)
ML11172A08228 June 2011Request for Additional Information Regarding 10 CFR 50.46 Annual Report
ML11269A05314 October 2011Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Areva Advanced W17 High Thermal Performance Fuel
ML11271A13514 October 2011Request for Additional Information Regarding the Proposed Technical Specification Changes for Replacement Steam Generator Tube Inspection Requirements
ML11356A22629 December 2011Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4
ML12011A02730 January 2012Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Used of Shield Building Dome Penetrations During Modes 1 Through 4
ML12025A0278 February 2012Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Areva Advance W17 High Thermal Performance Fuel (TAC Nos. ME6538 & ME6539)Loop seal
ML12056A04712 March 2012Enclosure 1 - Recommendation 2.1: SeismicHigh winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
Earthquake
Generic Issues Program
ML12056A04812 March 2012Enclosure 2 - Recommendation 2.1: FloodingHigh winds
Ultimate heat sink
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: SeismicUnanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: FloodingUnanalyzed Condition
High winds
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML12056A05112 March 2012Enclosure 5 - Recommendation 9.3: Emergency PreparednessFukushima Dai-Ichi
Earthquake
ML12121A34415 May 2012Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1-4Safe Shutdown
Mission time
Earthquake
ML12202A07531 July 2012Request for Additional Information Regarding Use of the Unit Station Service Transformers as a Power Supply to an Offsite CircuitAnticipated operational occurrence
Offsite Circuit
ML12216A1303 August 2012Request for Additional Information Regarding the Use of the Unit Station Service Transformers as a Power Supply to an Offsite CircuitOffsite Circuit
ML12300A0375 November 2012Request for Additional Information Regarding Physical Security Plan, Training and Qualifications Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program
ML13018A05325 January 2013Request for Additional Information Regarding Revision of the Final Safety Analysis Report to Adopt a Revised Hydrologic Analysis (TAC Nos. ME92838 and ME9239)
ML13109A51526 April 2013Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482)Aging Management
ML13119A08310 May 2013Requests for Additional Information for the Environmental Review of the Sequoyah Nuclear Plant License Renewal ApplicationHot Short
Safe Shutdown
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
Earthquake
ML13122A3408 May 2013RAI for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482)Safe Shutdown
Safe Shutdown Earthquake
Aging Management
ML13126A25225 July 2013Request for Additional Information on the 2013 Decommissioning Funding Status Report
ML13128A51931 May 2013Request for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal ApplicationWeld Overlay
Coatings
Nondestructive Examination
Aging Management
Moisture barrier
Biofouling
Pressure Boundary Leakage
Power change
ML13130A34510 May 2013Notification of Inspection and Request for Information 05000327 and 05000328
ML13134A2015 June 2013RAI for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, LRAFire Barrier
Aging Management
ML13134A37113 June 20135/9/2013 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, License RenAging Management
ML13136A3587 June 2013Revised Requests for Additional Information for the Environmental ReviewHot Short
Safe Shutdown
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
Earthquake
ML13137A4897 June 2013Enclosure 2, Sequoyah Aquatic Ecology RAIs 6 June 2013 (2)
ML13142A33221 May 2013Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482)Coatings
Aging Management
ML13144A71211 June 2013Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (Tac Nos. MF0481 and MF0482)- Set 6Weld Overlay
Aging Management
Turbine Missile
ML13150A41224 June 2013Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) - Set 8Aging Management
License Renewal
Control of Heavy Loads
ML13154A3684 June 2013Request for Additional Information Regarding Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule Revision
ML13158A01625 June 2013Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) Set 9Loop seal
Ultimate heat sink
Aging Management
Biofouling
EVT-1
ML13198A35417 July 2013Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)Safe Shutdown Earthquake
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
ML13204A2572 August 2013Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) - Set 10Hydrostatic
Coatings
Nondestructive Examination
Condition Adverse to Quality
Aging Management
Moisture barrier
ML13224A12622 August 2013RAI for Review of Sequoyah, Units 1 & 2 License Renewal Application - Set 11Boric Acid
Aging Management
Moisture barrier
Turbine Missile
ML13226A37110 September 2013Summary of Telephone Conference Call Held on August 1, 2013, Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1Hydrostatic
Coatings
Nondestructive Examination
Condition Adverse to Quality
Aging Management
Moisture barrier
ML13238A24430 August 2013RAI Set 12Safe Shutdown Earthquake
Hydrostatic
Aging Management
Moisture barrier
Liquid penetrant
ML13263A33826 September 2013RAI Set 14Aging Management
ML13268A49227 September 2013RAI Set 15
ML13282A33018 October 2013RAI Set 16Weld Overlay
ML13312A41521 November 2013Interim Staff Evaluation and Request for RAI Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Safe Shutdown Earthquake
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
Fire Protection Program
ML13323A0976 December 2013RAI Set 18Aging Management