Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML12056A047 | 12 March 2012 | Enclosure 1 - Recommendation 2.1: Seismic | High winds Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Large early release frequency Earthquake Generic Issues Program |
ML12056A048 | 12 March 2012 | Enclosure 2 - Recommendation 2.1: Flooding | High winds Ultimate heat sink Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic | Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding | Unanalyzed Condition High winds Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML12056A051 | 12 March 2012 | Enclosure 5 - Recommendation 9.3: Emergency Preparedness | Fukushima Dai-Ichi Earthquake |
ML120720196 | 12 March 2012 | Email, Request for Additional Information, Review of Steam Generator Tube Inspection Report for the Twelfth Refueling Outage 2RF12 | |
ML121240840 | 3 May 2012 | Request for Additional Information, Relief Request No. A-2, Relief from Inspection Requirements of ASME Code Case N-729-1 Due to Geometric Limitations, 2nd 10-Year Inservice Inspection Interval | |
ML12306A546 | 1 November 2012 | E-mail, Request for Additional Information - Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 for the CPNPP (TAC No. D91660) | |
ML12345A188 | 10 December 2012 | Request for Additional Information E-mail - Relief Request C-2 for the Reactor Pressure Vessel Leak-Off Flange, Third 10-Year Inservice Inspection Interval | VT-2 Stress corrosion cracking |
ML13029A738 | 29 January 2013 | Request for Additional Information Email, Relief Request B-2, Alternative to ASME Code Requirements for Examination of Reactor Vessel Hot-Leg Nozzle Welds, for the Third 10-Year Inservice Inspection Interval | Stress corrosion cracking Eddy Current Testing Dissimilar Metal Weld |
ML13050A183 | 19 February 2013 | Request for Additional Information Email, Relief Request No. P-1 for Pumps and Valves, Third 10-Year Inservice Testing Plan Interval | |
ML13087A531 | 4 April 2013 | Request for Additional Information, 10 CFR 50.33 Financial Qualification Review Annual 10-K Report Filed by Energy Future Holdings Corporation with the Securities and Exchange Commission | |
ML13108A153 | 18 April 2013 | Request for Additional Information Email, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, for Extension of Two 14-Day Completion Times for Offsite Circuits (TAC Nos. MF0405 and - | Safe Shutdown Offsite Circuit |
ML13141A626 | 7 June 2013 | Request for Additional Information Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | FLEX Spent Fuel Pool Instrumentation |
ML13191A850 | 10 July 2013 | Request for Additional Information Email, Review of Decommissioning Funding Status Report | |
ML13267A197 | 30 September 2013 | Request for Additional Information, Closure of Option 2a to Address In-Vessel Mitigative Measures for Potential In-Vessel Blockage; Related to Generic Safety Issue 191 | |
ML13295A674 | 4 November 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | High Radiation Area Safe Shutdown Earthquake Cyber Security Finite Element Analysis FLEX Spent Fuel Pool Instrumentation Battery sizing Earthquake Fire Protection Program |
ML13301A645 | 5 November 2013 | Redacted, Request for Additional Information, Amendment Request to Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals | License Renewal |
ML13317B703 | 19 November 2013 | Non-proprietary, Request for Additional Information Round 2, Amendment Request to Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals | |
ML14058A089 | 27 February 2014 | Request for Additional Information Round 3, Amendment Request to Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals | |
ML14059A188 | 7 March 2014 | Request for Additional Information, Near-Term Task Force Recommendation 2.1, Flood Hazard Reevaluation Report | Safe Shutdown Fukushima Dai-Ichi |
ML15089A554 | 30 March 2015 | Notification of NRC Component Design Bases Inspection (05000445/2015007 and 05000446/2015007) and Initial Request for Information | Probabilistic Risk Assessment Temporary Modification |
ML15103A674 | 24 April 2015 | Review of Compliance with NRC Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) | Finite Element Analysis Spent Fuel Pool Instrumentation |
ML15174A005 | 22 June 2015 | NRR E-mail Capture - Request for Additional Information - Relief Request 2A3-1 | Probabilistic Risk Assessment Stress corrosion cracking Thermal fatigue |
ML15317A148 | 13 November 2015 | Request for Additional Information Email, Relief Request No. B-9 for Reactor Pressure Vessel Outlet Nozzle Safe End to Piping Welds, Second 10-year Inservice Inspection Interval | Boric Acid Through Wall Leak |
ML15317A150 | 13 November 2015 | Request for Additional Information Email, Relief Request No. B-3 for Reactor Coolant System Pipe to Pipe Flange Weld, Second 10-year Inservice Inspection Interval | Boric Acid Through Wall Leak |
ML15317A152 | 13 November 2015 | Request for Additional Information Email, Relief Request No. B-10 for Safety Injection System Elbow to Pipe Weld, Second 10-year Inservice Inspection Interval | Boric Acid Through Wall Leak |
ML15317A155 | 13 November 2015 | Request for Additional Information Email, Relief Request No. B-11 for Reactor Coolant System Pipe to Valve Weld, Second 10-year Inservice Inspection Interval | Boric Acid Through Wall Leak |
ML15317A158 | 13 November 2015 | Request for Additional Information Email, Relief Request B-15, C-2, and C-4 for Welds in the RPV and Containment Spray and Residual Heat Removal Heat Exchanger Shells, Second 10-year Inservice Inspection Interval | Stress corrosion cracking |
ML15345A011 | 16 December 2015 | Request for Additional Information, License Amendment Request, Revise Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Revision 6 | Internal Flooding |
ML16015A003 | 14 January 2016 | NRR E-mail Capture - Request for Additional Information - Relief Request 1B3-3 for Comanche Peak Nuclear Power Plant, Unit 1 | |
ML16034A196 | 8 February 2016 | Independent Spent Fuel Storage Installation - Request for Additional Information, Application for Order Approving Transfer of Facility Operating Licenses and Conforming Amendment | |
ML17048A417 | 17 February 2017 | Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment... | High winds FLEX Spent Fuel Pool Instrumentation |
ML17066A237 | 7 March 2017 | Notification of NRC Triennial Fire Protection Baseline Inspection (05000445/2017008 and 05000446/2017008) and Request for Information | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Multiple Spurious Operation Emergency Lighting B.5.b Mitigating Strategies Maintenance Rule Program Fire Protection Program |
ML17087A203 | 28 March 2017 | NRR E-mail Capture - Comanche Peak, Unit 2 - Final Request for Additional Information Regarding Request No. 2B3-1 | |
ML17276B862 | 3 October 2017 | Notification of NRC Design Bases Assurance Inspection (Programs)(05000445/2017007 and 05000446/2017007) and Initial Request for Information | Commercial Grade Dedication |
ML19058A359 | 27 February 2019 | NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Final Request for Additional Information Concerning License Amendment Request to Revise the Emergency Plan | |
ML19319A543 | 14 November 2019 | NRR E-mail Capture - Draft Comanche Peak RAIs - Quality Assurance Program Reduction in Commitment | |
ML19346B381 | 11 December 2019 | NRR E-mail Capture - Comanche Peak RAIs - Quality Assurance Program Reduction in Commitment | |
ML20045E351 | 13 February 2020 | Information Request February 13, 2020 Notification of Inspection and Request for Information Comanche Peak Unit 2 NRC Inspection Report 05000446/2020002 | Boric Acid Nondestructive Examination Scaffolding |
ML20104A002 | 11 April 2020 | NRR E-mail Capture - Comanche Peak Unit 2 - Request for Additional Information - Proposed Alternative to ASME OM Code for Deferral of Snubber Testing (SNB-1) and Visual Examinations (SNB-2) | COVID-19 |
ML20105A107 | 13 April 2020 | NRR E-mail Capture - Comanche Peak - Request for Additional Information - Exigent Amendment Request for One Time Change to Unit 2 Steam Generator Inspection Frequency | |
ML20225A093 | 12 August 2020 | Notification of Inspection 05000445/2020004 and 05000446/2020004 and Request for Information | |
ML21103A398 | 13 April 2021 | CP Security Inspection Information Request 2021403 | |
ML21165A102 | 13 June 2021 | Pi&R; Request for Information | Temporary Modification Pandemic |
ML21166A338 | 22 June 2021 | Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Probabilistic Risk Assessment Offsite Circuit |
ML21245A307 | 2 September 2021 | Request for Information ML21245A307 | Boric Acid Nondestructive Examination Scaffolding |
ML21253A224 | 9 September 2021 | Request for Information Occupational Radiation Safety Inspection (71124.01, 71124.02, and 71151) from 10/18-22/2021 | |
ML21253A233 | 9 September 2021 | Request for Information: Comanche Peak Nuclear Power Plant, Units 1 and 2 (05000445 and 05000446); Occupation Radiation Safety (71124.01, 71124.02, 7511) | High Radiation Area |
ML21286A791 | 13 October 2021 | NRR E-mail Capture - Comanche Peak - Request for Additional Information - Request to Adopt TSTF-577 Revision 1 |