Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML12056A04712 March 2012Enclosure 1 - Recommendation 2.1: SeismicHigh winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
Earthquake
Generic Issues Program
ML12056A04812 March 2012Enclosure 2 - Recommendation 2.1: FloodingHigh winds
Ultimate heat sink
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: SeismicUnanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: FloodingUnanalyzed Condition
High winds
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML12056A05112 March 2012Enclosure 5 - Recommendation 9.3: Emergency PreparednessFukushima Dai-Ichi
Earthquake
ML12072019612 March 2012Email, Request for Additional Information, Review of Steam Generator Tube Inspection Report for the Twelfth Refueling Outage 2RF12
ML1212408403 May 2012Request for Additional Information, Relief Request No. A-2, Relief from Inspection Requirements of ASME Code Case N-729-1 Due to Geometric Limitations, 2nd 10-Year Inservice Inspection Interval
ML12306A5461 November 2012E-mail, Request for Additional Information - Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 for the CPNPP (TAC No. D91660)
ML12345A18810 December 2012Request for Additional Information E-mail - Relief Request C-2 for the Reactor Pressure Vessel Leak-Off Flange, Third 10-Year Inservice Inspection IntervalVT-2
Stress corrosion cracking
ML13029A73829 January 2013Request for Additional Information Email, Relief Request B-2, Alternative to ASME Code Requirements for Examination of Reactor Vessel Hot-Leg Nozzle Welds, for the Third 10-Year Inservice Inspection IntervalStress corrosion cracking
Eddy Current Testing
Dissimilar Metal Weld
ML13050A18319 February 2013Request for Additional Information Email, Relief Request No. P-1 for Pumps and Valves, Third 10-Year Inservice Testing Plan Interval
ML13087A5314 April 2013Request for Additional Information, 10 CFR 50.33 Financial Qualification Review Annual 10-K Report Filed by Energy Future Holdings Corporation with the Securities and Exchange Commission
ML13108A15318 April 2013Request for Additional Information Email, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, for Extension of Two 14-Day Completion Times for Offsite Circuits (TAC Nos. MF0405 and -Safe Shutdown
Offsite Circuit
ML13141A6267 June 2013Request for Additional Information Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool InstrumentationFLEX
Spent Fuel Pool Instrumentation
ML13191A85010 July 2013Request for Additional Information Email, Review of Decommissioning Funding Status Report
ML13267A19730 September 2013Request for Additional Information, Closure of Option 2a to Address In-Vessel Mitigative Measures for Potential In-Vessel Blockage; Related to Generic Safety Issue 191
ML13295A6744 November 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Safe Shutdown Earthquake
Cyber Security
Finite Element Analysis
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
Earthquake
Fire Protection Program
ML13301A6455 November 2013Redacted, Request for Additional Information, Amendment Request to Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and ManualsLicense Renewal
ML13317B70319 November 2013Non-proprietary, Request for Additional Information Round 2, Amendment Request to Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals
ML14058A08927 February 2014Request for Additional Information Round 3, Amendment Request to Revise TS 3.7.16, Fuel Storage Pool Boron Concentration, TS 3.7.17, Spent Fuel Assembly Storage, and TS 5.5, Programs and Manuals
ML14059A1887 March 2014Request for Additional Information, Near-Term Task Force Recommendation 2.1, Flood Hazard Reevaluation ReportSafe Shutdown
Fukushima Dai-Ichi
ML15089A55430 March 2015Notification of NRC Component Design Bases Inspection (05000445/2015007 and 05000446/2015007) and Initial Request for InformationProbabilistic Risk Assessment
Temporary Modification
ML15103A67424 April 2015Review of Compliance with NRC Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)Finite Element Analysis
Spent Fuel Pool Instrumentation
ML15174A00522 June 2015NRR E-mail Capture - Request for Additional Information - Relief Request 2A3-1Probabilistic Risk Assessment
Stress corrosion cracking
Thermal fatigue
ML15317A14813 November 2015Request for Additional Information Email, Relief Request No. B-9 for Reactor Pressure Vessel Outlet Nozzle Safe End to Piping Welds, Second 10-year Inservice Inspection IntervalBoric Acid
Through Wall Leak
ML15317A15013 November 2015Request for Additional Information Email, Relief Request No. B-3 for Reactor Coolant System Pipe to Pipe Flange Weld, Second 10-year Inservice Inspection IntervalBoric Acid
Through Wall Leak
ML15317A15213 November 2015Request for Additional Information Email, Relief Request No. B-10 for Safety Injection System Elbow to Pipe Weld, Second 10-year Inservice Inspection IntervalBoric Acid
Through Wall Leak
ML15317A15513 November 2015Request for Additional Information Email, Relief Request No. B-11 for Reactor Coolant System Pipe to Valve Weld, Second 10-year Inservice Inspection IntervalBoric Acid
Through Wall Leak
ML15317A15813 November 2015Request for Additional Information Email, Relief Request B-15, C-2, and C-4 for Welds in the RPV and Containment Spray and Residual Heat Removal Heat Exchanger Shells, Second 10-year Inservice Inspection IntervalStress corrosion cracking
ML15345A01116 December 2015Request for Additional Information, License Amendment Request, Revise Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Revision 6Internal Flooding
ML16015A00314 January 2016NRR E-mail Capture - Request for Additional Information - Relief Request 1B3-3 for Comanche Peak Nuclear Power Plant, Unit 1
ML16034A1968 February 2016Independent Spent Fuel Storage Installation - Request for Additional Information, Application for Order Approving Transfer of Facility Operating Licenses and Conforming Amendment
ML17048A41717 February 2017Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment...High winds
FLEX
Spent Fuel Pool Instrumentation
ML17066A2377 March 2017Notification of NRC Triennial Fire Protection Baseline Inspection (05000445/2017008 and 05000446/2017008) and Request for InformationHot Short
Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Multiple Spurious Operation
Emergency Lighting
B.5.b Mitigating Strategies
Maintenance Rule Program
Fire Protection Program
ML17087A20328 March 2017NRR E-mail Capture - Comanche Peak, Unit 2 - Final Request for Additional Information Regarding Request No. 2B3-1
ML17276B8623 October 2017Notification of NRC Design Bases Assurance Inspection (Programs)(05000445/2017007 and 05000446/2017007) and Initial Request for InformationCommercial Grade Dedication
ML19058A35927 February 2019NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Final Request for Additional Information Concerning License Amendment Request to Revise the Emergency Plan
ML19319A54314 November 2019NRR E-mail Capture - Draft Comanche Peak RAIs - Quality Assurance Program Reduction in Commitment
ML19346B38111 December 2019NRR E-mail Capture - Comanche Peak RAIs - Quality Assurance Program Reduction in Commitment
ML20045E35113 February 2020Information Request February 13, 2020 Notification of Inspection and Request for Information Comanche Peak Unit 2 NRC Inspection Report 05000446/2020002Boric Acid
Nondestructive Examination
Scaffolding
ML20104A00211 April 2020NRR E-mail Capture - Comanche Peak Unit 2 - Request for Additional Information - Proposed Alternative to ASME OM Code for Deferral of Snubber Testing (SNB-1) and Visual Examinations (SNB-2)COVID-19
ML20105A10713 April 2020NRR E-mail Capture - Comanche Peak - Request for Additional Information - Exigent Amendment Request for One Time Change to Unit 2 Steam Generator Inspection Frequency
ML20225A09312 August 2020Notification of Inspection 05000445/2020004 and 05000446/2020004 and Request for Information
ML21103A39813 April 2021CP Security Inspection Information Request 2021403
ML21165A10213 June 2021Pi&R; Request for InformationTemporary Modification
Pandemic
ML21166A33822 June 2021Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bProbabilistic Risk Assessment
Offsite Circuit
ML21245A3072 September 2021Request for Information ML21245A307Boric Acid
Nondestructive Examination
Scaffolding
ML21253A2249 September 2021Request for Information Occupational Radiation Safety Inspection (71124.01, 71124.02, and 71151) from 10/18-22/2021
ML21253A2339 September 2021Request for Information: Comanche Peak Nuclear Power Plant, Units 1 and 2 (05000445 and 05000446); Occupation Radiation Safety (71124.01, 71124.02, 7511)High Radiation Area
ML21286A79113 October 2021NRR E-mail Capture - Comanche Peak - Request for Additional Information - Request to Adopt TSTF-577 Revision 1