Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20154H8015 October 1998Application for Amend to License NPF-62,revising TS 5.5.13 to Allow Next Scheduled Performance of LLRT of Primary Containment Penetration for RPV Head Spray Piping (IMC-042) to Be Deferred Until Seventh Refueling Outage (RF-7)VT-2
Exemption Request
ML20154J00518 May 1988Application for Amend to License NPF-62,revising Tech Spec Tables 2.2.1-1 & 3.3.2-2 Re Main Steam Line Radiation High full-power Background Radiation Levels & Associated Trip Setpoints for Testing of Hydrogen Water Sys.Fee PaidFuel cladding
ML20196E65523 February 1988Application for Amend to License NPF-62,changing Tech Specs Onsite Organization Chart & Related Specs,Per Proposed Organizational Restructuring.Fee Paid
ML20210K82823 July 1999Application for Amend to License NPF-62,consenting to License Transfer & Approving Conforming Administrative License Amend
ML20237A19210 December 1987Application for Amend to License NPF-62,changing Tech Specs to Allow one-time Exception to Surveillance Requirements for Testing Listed Containment Isolation & Pressure Isolation Valves.Fee Paid
U-600619, Amend to Application for Ol,Changing Tech Specs 3/4.3.8 Turbine Overspeed Protection Sys & 3/4.7.6 Turbine Bypass Sys to Reduce Probability of Generating Turbine Missile30 June 1986Amend to Application for Ol,Changing Tech Specs 3/4.3.8 Turbine Overspeed Protection Sys & 3/4.7.6 Turbine Bypass Sys to Reduce Probability of Generating Turbine MissileTurbine Missile
U-600817, Application for Amend to License NPF-55,providing Addl Changes to Clarify & Enhance Tech Specs Which Will Accompany Full Power OL for Plant.No Amend of Present Low Power License Requested.Changes Consistent W/Fsar as Amended4 February 1987Application for Amend to License NPF-55,providing Addl Changes to Clarify & Enhance Tech Specs Which Will Accompany Full Power OL for Plant.No Amend of Present Low Power License Requested.Changes Consistent W/Fsar as Amended
U-600821, Application to Amend License NPF-55,revising Tech Spec Section 3/4.7.2 to Change Recirculation Sys Air Flow Acceptance Criteria for Control Room HVAC Sys20 January 1987Application to Amend License NPF-55,revising Tech Spec Section 3/4.7.2 to Change Recirculation Sys Air Flow Acceptance Criteria for Control Room HVAC Sys
U-601048, Application for Amend to License NPF-62,consisting of 24 Separate Tech Spec Changes,Including Crvics Instrumentation, Remote Shutdown Monitoring Instrumentation & Containment Isolation Valves.Fee Paid30 October 1987Application for Amend to License NPF-62,consisting of 24 Separate Tech Spec Changes,Including Crvics Instrumentation, Remote Shutdown Monitoring Instrumentation & Containment Isolation Valves.Fee Paid
U-601170, Application for Amend to License NPF-62,revising Tech Specs 3.0.4,4.0.3 & 4.0.4 & Tech Spec Bases 3.0 & 4.0 & Deleting Tech Specs Statements Which Presently Take Exception to Spec 3.04.Fee Paid11 July 1988Application for Amend to License NPF-62,revising Tech Specs 3.0.4,4.0.3 & 4.0.4 & Tech Spec Bases 3.0 & 4.0 & Deleting Tech Specs Statements Which Presently Take Exception to Spec 3.04.Fee PaidMissed surveillance
U-601181, Application for Amend to License NPF-62,changing Tech Specs to Provide Addl Info Re Sensor/Channel Configuration for Main Steam Line Turbine Bldg & Revising Setpoint Requirements.Fee Paid18 May 1988Application for Amend to License NPF-62,changing Tech Specs to Provide Addl Info Re Sensor/Channel Configuration for Main Steam Line Turbine Bldg & Revising Setpoint Requirements.Fee Paid
U-601239, Application for Amend to License NPF-62,revising Tech Spec to Support Cycle 2 in Max Extended Operating Domain & W/ Reduced Feedwater Temps.Supporting Documentation Encl.Fee paid.NEDC-31546P Withheld6 September 1988Application for Amend to License NPF-62,revising Tech Spec to Support Cycle 2 in Max Extended Operating Domain & W/ Reduced Feedwater Temps.Supporting Documentation Encl.Fee paid.NEDC-31546P Withheld
U-601277, Application for Amend to License NPF-62,increasing Vol of Fuel Oil Required for Operability of Div II Diesel Generator23 September 1988Application for Amend to License NPF-62,increasing Vol of Fuel Oil Required for Operability of Div II Diesel Generator
U-601295, Application for Amend to License NPF-62,changing License to Reflect Merger of Western Illinois Power Cooperative Into Soyland Power Cooperative.Financial Disclosure Info Encl. Fee Paid2 November 1988Application for Amend to License NPF-62,changing License to Reflect Merger of Western Illinois Power Cooperative Into Soyland Power Cooperative.Financial Disclosure Info Encl. Fee PaidIncorporated by reference
U-601460, Application for Amend to License NPF-62,revising Tech Spec Definition of Core Alteration to Clarify Applicability & Scope of Definition Re Movement of Fuel,Sources or Reactivity Control Components30 June 1989Application for Amend to License NPF-62,revising Tech Spec Definition of Core Alteration to Clarify Applicability & Scope of Definition Re Movement of Fuel,Sources or Reactivity Control Components
U-601465, Application for Amend to License NPF-62,in Response to Generic Ltr 88-16, Removal of Cycle-Specific Parameter Limits from Tech Specs. Amend Would Result in Resource Savings by Eliminating Majority of License Amend Requests12 June 1989Application for Amend to License NPF-62,in Response to Generic Ltr 88-16, Removal of Cycle-Specific Parameter Limits from Tech Specs. Amend Would Result in Resource Savings by Eliminating Majority of License Amend RequestsShutdown Margin
U-601858, Application for Amend to License NPF-62,changing Tech Specs 6.2.3.2, Composition, Subsection 6.2.3, Independent Safety Engineering Group to Provide Second Set of Acceptable Qualifications,Per NUREG-073722 October 1991Application for Amend to License NPF-62,changing Tech Specs 6.2.3.2, Composition, Subsection 6.2.3, Independent Safety Engineering Group to Provide Second Set of Acceptable Qualifications,Per NUREG-0737
U-602192, Application for Amend to License NPF-62,changing Tech Specs 3.3.2, Instrumentation-Containment & Reactor Vessel Isolation Control Sys & 3.6.5, Drywell Post-LOCA Vacuum Relief Valves10 December 1993Application for Amend to License NPF-62,changing Tech Specs 3.3.2, Instrumentation-Containment & Reactor Vessel Isolation Control Sys & 3.6.5, Drywell Post-LOCA Vacuum Relief Valves
U-602196, Application for Amend to License NPF-62,requesting Changes to TS to Improve & Reformat CPS TS Consistent w/NUREG-1434, Improved BWR-6 TS, Rev 0,Sept 199226 October 1993Application for Amend to License NPF-62,requesting Changes to TS to Improve & Reformat CPS TS Consistent w/NUREG-1434, Improved BWR-6 TS, Rev 0,Sept 1992Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Probabilistic Risk Assessment
Scram Discharge Volume
Earthquake
Fuel cladding
U-602272, Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.1.8,such That 36-inch Isolation Valve Leak Rate Measurement Would Be Performed at Least Once Per 18 Months, Providing Valves Remain Closed During That Period13 June 1994Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.1.8,such That 36-inch Isolation Valve Leak Rate Measurement Would Be Performed at Least Once Per 18 Months, Providing Valves Remain Closed During That PeriodCold shutdown justification
U-602297, Application for Amend to License NPF-62,proposing Changes to Ts,Eliminating Requirement to Perform Manual Testing of solid-state Logic Independently from self-test Sys12 August 1994Application for Amend to License NPF-62,proposing Changes to Ts,Eliminating Requirement to Perform Manual Testing of solid-state Logic Independently from self-test Sys
U-602303, Application for Amend to License NPF-62,changing TS 3/4.4.3.1, Reactor Coolant Sys Leakage-Leakage Detection Sys20 June 1994Application for Amend to License NPF-62,changing TS 3/4.4.3.1, Reactor Coolant Sys Leakage-Leakage Detection Sys
U-602316, Application for Amend to License NPF-62,requesting Enforcement Discretion by NRC Re TS Requirement for Accelerated Testing of Standby Emergency Diesel Generators5 August 1994Application for Amend to License NPF-62,requesting Enforcement Discretion by NRC Re TS Requirement for Accelerated Testing of Standby Emergency Diesel GeneratorsSafe Shutdown
Enforcement Discretion
U-602320, Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.2.2, Drywell Bypass Leakage, to Allow Drywell Bypass Leakage Rate Tests to Be Performed at Intervals as Long as Ten Years12 August 1994Application for Amend to License NPF-62,proposing Changes to TS 3/4.6.2.2, Drywell Bypass Leakage, to Allow Drywell Bypass Leakage Rate Tests to Be Performed at Intervals as Long as Ten Years
U-602364, Application for Amend to License NPF-62,providing Final Rev to TS by Converting to Improved TS Per NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 199231 October 1994Application for Amend to License NPF-62,providing Final Rev to TS by Converting to Improved TS Per NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992Scram Discharge Volume
Process Control Program
Fire Protection Program
U-602376, Application for Amend to License NPF-62,eliminating Selected Response Time Testing Requirements27 January 1995Application for Amend to License NPF-62,eliminating Selected Response Time Testing RequirementsReactor Vessel Water Level
U-602406, Application for Amend to License NPF-62,changing TS 3.3.2.1, Control Rod Block Instrumentation to Revise Two SRs & Associated Notes for Rod Withdrawal Limiter Mode of Rod Pattern Control Sys10 February 1995Application for Amend to License NPF-62,changing TS 3.3.2.1, Control Rod Block Instrumentation to Revise Two SRs & Associated Notes for Rod Withdrawal Limiter Mode of Rod Pattern Control Sys
U-602417, Application for Amend to License NPF-62,changing TS 3.8.2, 3.8.5 & 3.8.8 to Revise Operability Requirements for Div 3 DG & Divs 3 & 4 Batteries,Battery Chargers & Inverters to Apply Only When HPCS Required to Be Operable14 February 1995Application for Amend to License NPF-62,changing TS 3.8.2, 3.8.5 & 3.8.8 to Revise Operability Requirements for Div 3 DG & Divs 3 & 4 Batteries,Battery Chargers & Inverters to Apply Only When HPCS Required to Be OperableShutdown Margin
Qualified Offsite Circuit
Scram Discharge Volume
Offsite Circuit
U-602454, Application for Amend to License NPF-62,incorporating Description of Exclusion Area Boundary9 June 1995Application for Amend to License NPF-62,incorporating Description of Exclusion Area Boundary
U-602463, Application for Amend to License NPF-62,submitting Rev 1 to TS Bases,Per TS 5.5.11, TS Bases Control Program23 June 1995Application for Amend to License NPF-62,submitting Rev 1 to TS Bases,Per TS 5.5.11, TS Bases Control Program
U-602499, Application for Amend to License NPF-62,requesting Proposed Change to TS 3.4.2, Flow Control Valves, to Delete Requirement to Verify Average Rate of Movement of Each Reactor Recirculation Sys14 December 1995Application for Amend to License NPF-62,requesting Proposed Change to TS 3.4.2, Flow Control Valves, to Delete Requirement to Verify Average Rate of Movement of Each Reactor Recirculation Sys
U-602508, Application for Amend to License NPF-62,requesting Various Proposed Changes to TS for Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys14 December 1995Application for Amend to License NPF-62,requesting Various Proposed Changes to TS for Instrumentation Associated W/High Pressure Core Spray Sys,Reactor Core Isolation Cooling Sys & Residual Heat Removal Sys
U-602520, Application for Amend to License NPF-62,revising TS 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation, to Eliminate Periodic Response Time Testing of Analog Trip Modules14 December 1995Application for Amend to License NPF-62,revising TS 3.3.1.1, RPS Instrumentation & TS 3.3.6.1, Primary Containment Dwl Isolation Instrumentation, to Eliminate Periodic Response Time Testing of Analog Trip ModulesReactor Vessel Water Level
U-602522, Application for Amend to License NPF-62,changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months22 February 1996Application for Amend to License NPF-62,changing TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 MonthsFeedwater Controller Failure
U-602549, Application for Amend to License NPF-62,proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier22 February 1996Application for Amend to License NPF-62,proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell BarrierStroke time
U-602551, Application for Amend to License NPF-62,changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of Rv22 February 1996Application for Amend to License NPF-62,changing TS 3.4.11, RCS P/T Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv Separate & Apart from Core Beltline Region of RvAnticipated operational occurrence
Hydrostatic
U-602554, Application for Amend to License NPF-62,deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Change TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function22 February 1996Application for Amend to License NPF-62,deleting SR 3.3.8.1.1 Which Requires Channel Check for Loss of Power Instrumentation & Change TS Table 3.3.8.1-1 to Change Allowable Value for Degraded Voltage Function
U-602565, Application for Amend to License NPF-62,implementing 10CFR50,App J-Option B1 May 1996Application for Amend to License NPF-62,implementing 10CFR50,App J-Option B
U-602569, Application for Amend to License NPF-62,revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be Met19 April 1996Application for Amend to License NPF-62,revising Listed TS to Eliminate Core Alterations as Applicable Condition for Which Associated LCO Must Be MetShutdown Margin
Hydrostatic
U-602587, Application for Amend to License NPF-62,allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be Operable28 June 1996Application for Amend to License NPF-62,allowing Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Required to Be OperableEarthquake
U-602624, Application for Amend to License NPF-62,changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 715 August 1996Application for Amend to License NPF-62,changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Fuel cladding
U-602657, Application for Amend to License NPF-62 to Revise Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis, Into Two Separate Items19 November 1996Application for Amend to License NPF-62 to Revise Table 3.3.8.1-1, Loss of Power Instrumentation, by Dividing Function, Degraded Voltage - 4.16 Kv Basis, Into Two Separate Items
U-602675, Application for Amend to License NPF-62,requesting Consent to Transfer Minority Ownership13 December 1996Application for Amend to License NPF-62,requesting Consent to Transfer Minority Ownership
U-602796, Application for Amend to License NPF-62,requesting Temporary Partial Exemption to 10CFR50,App A,General Design Criteria 17 Re Offsite Circuit Condition. Condition22 July 1997Application for Amend to License NPF-62,requesting Temporary Partial Exemption to 10CFR50,App A,General Design Criteria 17 Re Offsite Circuit Condition. ConditionAnticipated operational occurrence
Qualified Offsite Circuit
Offsite Circuit
Affidavit
U-602972, Application for Amend to License NPF-62,incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TS4 May 1998Application for Amend to License NPF-62,incorporating Requirements for Static Var Compensator (SVC) Protection Sys Under New TSProbabilistic Risk Assessment
Qualified Offsite Circuit
Exemption Request
Offsite Circuit
U-602982, Application for Amend to License NPF-62,consisting of Proposed Changes Necessary to Implement Mgt Changes Occurring in Operations Organization at Plant27 April 1998Application for Amend to License NPF-62,consisting of Proposed Changes Necessary to Implement Mgt Changes Occurring in Operations Organization at Plant
U-602983, Application for Amend to License NPF-62,proposing Mod to Auxiliary Power Sys,Including Associated Changes Proposed for CPS Usar.Revised USAR Pages,Encl20 May 1998Application for Amend to License NPF-62,proposing Mod to Auxiliary Power Sys,Including Associated Changes Proposed for CPS Usar.Revised USAR Pages,EnclProbabilistic Risk Assessment
U-603030, Application for Amend to License NPF-62,partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability17 August 1998Application for Amend to License NPF-62,partially Reducing Load at Which DGs Are Required to Be Tested Per Affected SRs in Order to Reduce Stress & Wear on Machines While Still Sufficiently Challenging Machines to Confirm Operability
U-603032, Application for Amend to License NPF-62,adding TS LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys23 October 1998Application for Amend to License NPF-62,adding TS LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys
U-603043, Application for Amend to License NPF-62,revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.2031 July 1998Application for Amend to License NPF-62,revising Acceptance Criteria of SRs 3.8.1.7,3.8.1.12,3.8.1.15 & 3.8.1.20