Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20206H087 | 3 March 1986 | Allegation Review Data Sheet for Case 4-85-A-013 Re Const Activities.Addl Info Requested from Alleger.Case Closed Due to Lack of Response.Related Info Encl | |
ML20206H102 | 30 July 1985 | Allegation Review Data Sheet for Case 4-84-A-008 Re Improper Const Practices.Insp Rept 50-482/84-12 Issued on 841012 & Closeout Ltr Sent on 850405 | |
ML20206H121 | 26 January 1984 | Allegation Review Data Sheet for Case 4-84-A-10 Re Allegations of Improper Const.Insp/Review Needed to Determine If Investigation Necessary | |
ML20206H136 | 3 February 1984 | Allegation Review Data Sheet for Case 4-84-A-14 Re Documentation & Const Deficiencies Concerning Problems W/Ej Sys & Defective Long Seam Welds in Pipe Elbows.Allegation to Be Reviewed for Possible Insp | |
ML20206H141 | 15 February 1984 | Allegation Review Data Sheet for Case 4-84-A-22 Re QA Documentation & Use of Drugs | |
ML20206H218 | 20 April 1984 | Allegation Review Data Sheet for Case 4-84-A-63 Re Terminated Employee Allegations That Valves Located in Turbine Bldg Undercut.No safety-related Valves Found in Identified Location.Related Info Encl | Accidental discharge |
ML20206H232 | 17 August 1984 | Allegation Review Data Sheet for Case 4-84-A-80 Re False Resume Submitted to Louisiana Power & Light Co W/Plant Listed as Former Place of Employment | |
ML20206H243 | 13 September 1984 | Allegation Review Data Sheet for Case 4-84-A-89 Re Kickbacks & Coverups in QA Dept.State of Ks Interested.No Federal Regulations Violated If Kickback Allegations true.W/840912 Telcon Record.Related Info Encl | |
ML20206H252 | 27 June 1984 | Allegation Review Data Sheet for Case 4-84-A-71 Re Disposition of Default/Deficiency Rept 84-23 & Use of Nylon Screws & Washers to Land Electrical Cables | |
ML20209G305 | 9 August 1985 | Closure of ECCS Min Flow Valves, Engineering Evaluation Rept.Recommends IE Issue Info Notice to Remind Licensees of Importance of Min Flow Bypass Capability as Essential Pump Protection Feature | |
ML20210E808 | 13 January 1984 | Summary of Special insp-related Info,Consisting of 840124 Interview W/L Price Re Improper Practices for Spot Checking Anchor Bolt Angle & Feelings of Intimidation at Site. Supporting Documentation Encl | |
ML20212B032 | 17 December 1986 | Emergency Diesel Generator Component Failures Due to Vibration, Engineering Evaluation Rept | |
ML20212D909 | 23 December 1986 | Localized Rod Cluster Control Assembly (Rcca) Wear at PWR Plants, Engineering Evaluation Rept | Shutdown Margin Flow Induced Vibration |
ML20212F658 | 31 December 1986 | Technical Review Rept, Degradation of Safety Sys Due to Component Misalignment &/Or Mispositioned Control/Selector Switches | Boric Acid Operator Manual Action |
ML20212K664 | 7 August 1986 | Inadvertent Recirculation Actuation Signals at C-E Plants, Technical Review Rept | |
ML20214R485 | 9 October 1986 | Initial OL Review Rept for Seabrook Station Unit 1 | Safe Shutdown Non-Destructive Examination Hydrostatic Nondestructive Examination Systematic Assessment of Licensee Performance Exemption Request Liquid penetrant Fire Protection Program |
ML20214R568 | 31 December 1984 | Shoreham Nuclear Power Station Initial OL Readiness Assessment | Systematic Assessment of Licensee Performance Fire Protection Program |
ML20214T221 | 25 November 1985 | Initial OL Review Rept:Millstone Point Unit 3 | Coatings Nondestructive Examination Systematic Assessment of Licensee Performance |
ML20214T725 | 30 November 1984 | Summary Rept for Regional Evaluation of Diablo Canyon Unit 2 | Earthquake |
ML20234D805 | 25 March 1964 | Draft Notes on Seismic Questions on Proposed Bodega Reactor Site | Earthquake |
ML20234D817 | 25 March 1964 | Draft Notes on Geologic Questions Relating to Bodega | Earthquake |
ML20234D863 | 11 February 1964 | Questions Re Bodega | Earthquake |
ML20234D876 | 3 February 1964 | Marked-up AEC Div of Licensing & Regulation Rept to ACRS on Bodega Bay Reactor | Earthquake |
ML20234E025 | 26 July 1963 | Draft 2 to Safety Issues in Bodega Bay Reactor. Related Info Re AEC Hazards Analysis Encl | |
ML20234E066 | 24 June 1963 | Marked-up Safety Issues in Bodega Bay Reactor, Draft Outline | Earthquake |
ML20234E305 | 6 October 1964 | Rept to ACRS on Bodega Head Nuclear Power Plant...Seismic Considerations | Earthquake |
ML20234E599 | 7 February 1964 | Personal Impressions on Geology at Bodega | Earthquake |
ML20234E780 | 30 April 1964 | Rept to ACRS on PG&E Application for Cp,Bodega Bay Reactor | Safe Shutdown Earthquake |
ML20234F475 | 17 December 1985 | Licensing of Power Reactors by Aec | |
ML20234F514 | 5 April 1963 | Rept to ACRS on Bodega Bay Atomic Park - Unit 1. Petition for Writ of Review Before State of CA Supreme Court,Summary on Plant & Evaluation for CP Encl | Safe Shutdown Hydrostatic Earthquake Fuel cladding |
ML20234F560 | 17 December 1985 | Draft Hazards Analysis | Earthquake |
ML20234F577 | 5 August 1963 | Draft 2 of Hazards Analysis | Shutdown Margin Earthquake Fuel cladding |
ML20234F593 | 26 October 1964 | Summary Analysis by Div of Reactor Licensing in Matter of PG&E Bodega Head Nuclear Power Plant | |
ML20235A063 | 27 May 1963 | Marked-up Draft Hazards Analysis | Earthquake Fuel cladding |
ML20235A092 | 6 June 1963 | Revised Draft Hazards Analysis | Earthquake |
ML20235A245 | 26 October 1964 | Summary Analysis by Div of Reactor Licensing in Matter of Pg&E,Bodega Head Nuclear Power Plant | Safe Shutdown Earthquake Fuel cladding |
ML20235A376 | 29 October 1963 | Rept of 631007 Visit to Proposed Bodega Bay Reactor Site & 631022 Visit to USGS in Melno Park,Ca.Usgs Final Rept on Geological Investigation of Site Will Not Be Submitted in Washington,Dc Until Late Nov or Early Dec 1963 | |
ML20235A582 | 24 July 1963 | PG&E Bodega Bay Reactor, Summarizing 630717 Visit to Proposed Site | |
ML20235B456 | 1 June 1972 | Summary Statement by Directorate of Licensing Us AEC in Matter of Wh Zimmer Nuclear Power Station Unit 1 | Nondestructive Examination |
ML20235B662 | 5 November 1970 | Preliminary Rept to Acrs | Operating Basis Earthquake Design basis earthquake |
ML20235B782 | 24 November 1969 | Rept to Acrs:Lilco Shoreham Nuclear Power Station | Safe Shutdown Operating Basis Earthquake Nondestructive Examination Design basis earthquake Earthquake |
ML20235C016 | 30 August 1968 | Preliminary Aspects of Brunswick Steam Electric Plant,Units 1 & 2, Rept to ACRS | |
ML20235C127 | 7 May 1969 | Supplemental Rept to Acrs,Brunswick Steam Electric Plant, Units 1 & 2 | Earthquake |
ML20235C154 | 8 October 1969 | Second Supplemental Rept to ACRS on Brunswick Steam Electric Plant,Units 1 & 2 | |
ML20235C662 | 20 July 1971 | Rept to Acrs:Limerick Generating Station Units 1 & 2 | Post Accident Monitoring |
ML20235C692 | 3 January 1967 | Draft Summary Description of Quad-Cities Units 1 & 2 & Review of Considerations Important to Safety | |
ML20235C735 | 5 July 1968 | Rept to ACRS in Matter of Preliminary Aspects of Lilco Application for CP for Proposed Shoreham Nuclear Power Station,Unit 1 | |
ML20235C797 | 29 April 1968 | Summary Statement by Div of Reactor Licensing AEC in Matter of Consumers Public Power District Cooper Nuclear Station, Nemaha County,Ne | |
ML20235C892 | 21 November 1966 | Div of Reactor Licensing Rept to ACRS in Matter of Comm Ed CP Application for Quad Cities Units 1 & 2 | Safe Shutdown Shutdown Margin Hydrostatic Tornado Generated Missile Earthquake |
ML20235C931 | 23 June 1987 | Rept to ACRS Re Humboldt Bay Unit 3 - Core II |