NL-03-1386, Startup Test Report | 24 June 2003 | Startup Test Report | Shutdown Margin |
NL-03-1398, Submittal of Updated Fire Hazards Analysis Report (FHA) for Edwin I. Hatch Nuclear Plant, Units 1 & 2 | 11 July 2003 | Submittal of Updated Fire Hazards Analysis Report (FHA) for Edwin I. Hatch Nuclear Plant, Units 1 & 2 | Safe Shutdown Fire Barrier Incorporated by reference Exemption Request Continuous fire watch Fire Protection Program Hourly Fire Watch Grace period |
NL-03-1401, Response to Request for Additional Information | 24 June 2003 | Response to Request for Additional Information | Operating Basis Earthquake Earthquake |
NL-03-1499, Response to Request for Additional Information Regarding Technical Specification Revision Request Integrated Leakage Rate Testing Interval Extension | 25 July 2003 | Response to Request for Additional Information Regarding Technical Specification Revision Request Integrated Leakage Rate Testing Interval Extension | Probabilistic Risk Assessment Coatings Moisture barrier Liquid penetrant Dissimilar Metal Weld |
NL-03-1514, 60 Day Response to NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors for Joseph M. Farley Nuclear Plant & Vogtle Electric Generating Plant | 7 August 2003 | 60 Day Response to NRC Bulletin 2003-01 Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors for Joseph M. Farley Nuclear Plant & Vogtle Electric Generating Plant | Job Performance Measure Severe Accident Management Guideline |
NL-03-1620, Response to Generic Letter 2003-01, Control Room Habitability | 4 August 2003 | Response to Generic Letter 2003-01, Control Room Habitability | |
NL-03-1654, Cycle 21 Core Operating Limits Report (Colr), Revision 1 | 7 August 2003 | Cycle 21 Core Operating Limits Report (Colr), Revision 1 | |
NL-03-1661, Transmittal of Edwin I. Hatch Revised Emergency Plan Implementing Procedures 73EP-EIP-054-0, Version 6.0 & 73EP-EIP-073-0, Version 15.2 | 11 August 2003 | Transmittal of Edwin I. Hatch Revised Emergency Plan Implementing Procedures 73EP-EIP-054-0, Version 6.0 & 73EP-EIP-073-0, Version 15.2 | Health Physics Network Met Tower |
NL-03-1687, Response to Request for Additional Information on Oscillating Power Range Monitor Technical Specifications Change Request | 19 August 2003 | Response to Request for Additional Information on Oscillating Power Range Monitor Technical Specifications Change Request | |
NL-03-1744, Third 10-Year Interval Inservice Testing Program Submittal of Revised Relief Request RR-V-18 and Response to Request for Additional Information (RAI) | 12 September 2003 | Third 10-Year Interval Inservice Testing Program Submittal of Revised Relief Request RR-V-18 and Response to Request for Additional Information (RAI) | Probabilistic Risk Assessment Large early release frequency Power Operated Valves |
NL-03-1792, Plants - Emergency Operations Facility Relocation Request for Prior Approval | 16 October 2003 | Plants - Emergency Operations Facility Relocation Request for Prior Approval | Health Physics Network |
NL-03-1798, Measurement Uncertainty Recapture Power Uprate (Murpu) Post Murpu Steam Dryer Performance Monitoring and Inspections | 4 September 2003 | Measurement Uncertainty Recapture Power Uprate (Murpu) Post Murpu Steam Dryer Performance Monitoring and Inspections | |
NL-03-1850, August 2003 Monthly Operating Report for Edwin I. Hatch | 10 September 2003 | August 2003 Monthly Operating Report for Edwin I. Hatch | |
NL-03-1858, Cycle 12 and Unit 2 Cycle 10 Core Operating Limits Reports | 2 October 2003 | Cycle 12 and Unit 2 Cycle 10 Core Operating Limits Reports | Shutdown Margin |
NL-03-1926, Withdrawal of Technical Specifications Change Request on Oscillating Power Range Monitor System | 12 September 2003 | Withdrawal of Technical Specifications Change Request on Oscillating Power Range Monitor System | |
NL-03-1932, Measurement Uncertainty Recapture Power Uprate (Murpu) Post Murpu Steam Dryer Performance Monitoring and Inspections | 12 September 2003 | Measurement Uncertainty Recapture Power Uprate (Murpu) Post Murpu Steam Dryer Performance Monitoring and Inspections | |
NL-03-1958, Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | 19 September 2003 | Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 Pressure Boundary Leakage Through-Wall Leak |
NL-03-1997, Response to Regulatory Issue Summary 2003-14 Regarding Preparation and Scheduling of Operator Licensing Examination | 26 September 2003 | Response to Regulatory Issue Summary 2003-14 Regarding Preparation and Scheduling of Operator Licensing Examination | Generic Fundamentals Examination |
NL-03-2008, Results of Reactor Pressure Vessel Head Inspections Required by Order EA-03-099 | 13 October 2003 | Results of Reactor Pressure Vessel Head Inspections Required by Order EA-03-099 | Boric Acid |
NL-03-2037, Response to IR 05000321-03-006, 05000366-03-006, with Notes | 1 October 2003 | Response to IR 05000321-03-006, 05000366-03-006, with Notes | Hot Short Safe Shutdown Operator Manual Action Emergency Lighting Exemption Request Continuous fire watch |
NL-03-2064, September 2003 Monthly Operating Report for Edwin I. Hatch, Units 1 and 2 | 7 October 2003 | September 2003 Monthly Operating Report for Edwin I. Hatch, Units 1 and 2 | |
NL-03-2137, Unit 1 Cycle 21 Core Operating Limits Report (Colr), Revision 2 | 22 October 2003 | Unit 1 Cycle 21 Core Operating Limits Report (Colr), Revision 2 | |
NL-03-2154, Response to RAI on the Turbine Building Area Temperature High Primary Containment Isolation Allowable Value Change Request | 23 October 2003 | Response to RAI on the Turbine Building Area Temperature High Primary Containment Isolation Allowable Value Change Request | GOTHIC |
NL-03-2158, Updated Analysis of Core Shroud Vertical Welds | 14 November 2003 | Updated Analysis of Core Shroud Vertical Welds | Finite Element Analysis EVT-1 |
NL-03-2177, Request to Revise Technical Specifications and Pressure and Temperature Limits Report | 26 February 2004 | Request to Revise Technical Specifications and Pressure and Temperature Limits Report | Hydrostatic Incorporated by reference Pressure and Temperature Limits Report Exemption Request Fire Protection Program Scaffolding Affidavit |
NL-03-2200, Technical Specification Report 1-2003-1 Number of Steam Generator Tubes Plugged During 1R11 | 27 October 2003 | Technical Specification Report 1-2003-1 Number of Steam Generator Tubes Plugged During 1R11 | |
NL-03-2237, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10CFR50.75(f)(1) | 27 October 2003 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10CFR50.75(f)(1) | |
NL-03-2239, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10CFR50.75(f)(1) | 31 October 2003 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10CFR50.75(f)(1) | |
NL-03-2266, Follow-Up Written Request for Notice of Enforcement Discretion and Request to Revise Technical Specification Surveillance Requirements 3.3.1.5 and 3.3.3.2, on an Exigent Basis | 5 November 2003 | Follow-Up Written Request for Notice of Enforcement Discretion and Request to Revise Technical Specification Surveillance Requirements 3.3.1.5 and 3.3.3.2, on an Exigent Basis | Enforcement Discretion |
NL-03-2313, Report of Unsatisfactory Performance Testing | 11 November 2003 | Report of Unsatisfactory Performance Testing | |
NL-03-2383, Inservice Inspection Summary Report | 16 January 2004 | Inservice Inspection Summary Report | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
NL-03-2394, Results of Reactor Pressure Vessel Head Inspections, as Required by NRC Bulleting 2003-02 | 19 December 2003 | Results of Reactor Pressure Vessel Head Inspections, as Required by NRC Bulleting 2003-02 | |
NL-03-2400, Response to Request for Additional Information Regarding Generic Letter 96-06 | 21 November 2003 | Response to Request for Additional Information Regarding Generic Letter 96-06 | Finite Element Analysis |
NL-03-2412, License Amendment Request for Delay in Implementation of the Measurement Uncertainty Recapture Power Uprate | 11 December 2003 | License Amendment Request for Delay in Implementation of the Measurement Uncertainty Recapture Power Uprate | |
NL-03-2436, Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use | 1 December 2003 | Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use | |
NL-03-2451, Request for Surveillance Test Interval Extensions for Components of the Reactor Protection System | 27 January 2005 | Request for Surveillance Test Interval Extensions for Components of the Reactor Protection System | Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program |
NL-03-2459, Response to NRC Bulletin 2003-04 Rebaselining of Data in the Nuclear Materials Management and Safeguards System, for Joseph M. Farley Nuclear Plant, Edwin I. Hatch Nuclear Plant and Vogtle Electric Generating Plant | 22 December 2003 | Response to NRC Bulletin 2003-04 Rebaselining of Data in the Nuclear Materials Management and Safeguards System, for Joseph M. Farley Nuclear Plant, Edwin I. Hatch Nuclear Plant and Vogtle Electric Generating Plant | |
NL-03-2471, Request to Revise Technical Specifications, Administrative Controls 5.2.2.g | 20 February 2004 | Request to Revise Technical Specifications, Administrative Controls 5.2.2.g | |
NL-03-2473, November 2003 Monthly Operating Report for Edwin I. Hatch, Units 1 and 2 | 8 December 2003 | November 2003 Monthly Operating Report for Edwin I. Hatch, Units 1 and 2 | |
NL-03-2510, November 2003 Monthly Operating Report for Vogtle Units 1 and 2 | 15 December 2003 | November 2003 Monthly Operating Report for Vogtle Units 1 and 2 | |
NL-03-2517, Application for Technical Specification Improvement to Revise TS 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process | 2 February 2004 | Application for Technical Specification Improvement to Revise TS 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process | Incorporated by reference Scram Discharge Volume |
NL-03-2523, NPDES Permit Renewal Application | 15 December 2003 | NPDES Permit Renewal Application | Grab sample |
NL-03-2553, Withdrawal of Request for Delay in Implementation of the Measurement Uncertainty Recapture Power Uprate | 17 December 2003 | Withdrawal of Request for Delay in Implementation of the Measurement Uncertainty Recapture Power Uprate | |
NL-03-2575, E. I. Hatch, Units 1 and 2 - Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use | 19 December 2003 | E. I. Hatch, Units 1 and 2 - Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use | |
NL-04-0001, Southern Nuclear Operating Company, Organization Management Changes | 5 January 2004 | Southern Nuclear Operating Company, Organization Management Changes | |
NL-04-0010, December 2003 Monthly Operating Report for Edwin I. Hatch, Units 1 and 2 | 14 January 2004 | December 2003 Monthly Operating Report for Edwin I. Hatch, Units 1 and 2 | |
NL-04-0027, December 2003 Monthly Operating Report for Vogtle Electric Generating Plant,Units 1 and 2 | 13 January 2004 | December 2003 Monthly Operating Report for Vogtle Electric Generating Plant,Units 1 and 2 | |
NL-04-0047, Update the Hatch Biological Assessment Under the Endangered Species Act for Shortnose Sturgeon | 15 January 2004 | Update the Hatch Biological Assessment Under the Endangered Species Act for Shortnose Sturgeon | License Renewal Biofouling Power Uprate |
NL-04-0072, Proposed Technical Specifications Revisions to Primary Containment Leakage Rate Testing Program | 23 January 2004 | Proposed Technical Specifications Revisions to Primary Containment Leakage Rate Testing Program | |
NL-04-0073, Fluence Calculations and Methodology for the Unit I Updated Analysis of Core Shroud Vertical Welds | 30 January 2004 | Fluence Calculations and Methodology for the Unit I Updated Analysis of Core Shroud Vertical Welds | |