Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000499/LER-1992-007, Forwards LER 92-007-01 Re Unplanned ESF Actuation of Isolation Valve for above-seat Drain Line.Rev Addresses Results of Troubleshooting in Effort to Replicate Conditions Reported to Determine Cause of Event16 December 1992Forwards LER 92-007-01 Re Unplanned ESF Actuation of Isolation Valve for above-seat Drain Line.Rev Addresses Results of Troubleshooting in Effort to Replicate Conditions Reported to Determine Cause of Event
05000499/LER-1992-009, Forwards Rev 1 to LER 92-009 Re Missed TS Required Surveillance Due to Faulty Toxic Gas Monitoring Sys Modem11 October 1993Forwards Rev 1 to LER 92-009 Re Missed TS Required Surveillance Due to Faulty Toxic Gas Monitoring Sys Modem
05000499/LER-1993-006, Forwards LER 93-006,Rev 1 Re TS Violation Due to Train a Cold Leg Low Head SI MOV Being Inoperable for Greater than 72 H.Rev Documents Change in Identified Cause of Valve Motor Failure in Feb of 199322 September 1994Forwards LER 93-006,Rev 1 Re TS Violation Due to Train a Cold Leg Low Head SI MOV Being Inoperable for Greater than 72 H.Rev Documents Change in Identified Cause of Valve Motor Failure in Feb of 1993
05000499/LER-1993-011, Forwards Rev 1 to Voluntary LER 93-011 Re Pressurizer Safety Valve (Psv) & MSSV Setpoints Outside Required Tolerance.Rev Incorporates Info Re MSSV & Psv Setpoints Found Out of Tolerance During Past Outages14 February 1995Forwards Rev 1 to Voluntary LER 93-011 Re Pressurizer Safety Valve (Psv) & MSSV Setpoints Outside Required Tolerance.Rev Incorporates Info Re MSSV & Psv Setpoints Found Out of Tolerance During Past Outages
05000499/LER-1994-005, Forwards Rev 5 to LER 94-005 Re Inadvertent test-mode Starts of Sdgs Attributed to Electronic Noise.Rev Includes Details from Recent Inadvertent test-mode Start & Corrective Actions in Progress to Address Root Cause31 August 1995Forwards Rev 5 to LER 94-005 Re Inadvertent test-mode Starts of Sdgs Attributed to Electronic Noise.Rev Includes Details from Recent Inadvertent test-mode Start & Corrective Actions in Progress to Address Root Cause
05000499/LER-1995-001, Forwards LER 95-001 Re Potential Slight Degradation of Decay Heat Removal Capacity Via Natural Circulation12 April 1995Forwards LER 95-001 Re Potential Slight Degradation of Decay Heat Removal Capacity Via Natural Circulation
05000499/LER-1995-002, Forwards Rev 1 to LER 95-002 Re Incorrect Application of Static Shift to Pressurizer Level Channel LT-04675 June 1995Forwards Rev 1 to LER 95-002 Re Incorrect Application of Static Shift to Pressurizer Level Channel LT-0467
05000499/LER-1995-003, Forwards LER 95-003 Re Rt on Over Temp/Delta Temp Due to Failed Fuse Holder26 April 1995Forwards LER 95-003 Re Rt on Over Temp/Delta Temp Due to Failed Fuse Holder
05000499/LER-1995-005, Forwards LER 95-005.Event Did Not Have Adverse Effect on Health & Safety of Public,But Clearly Does Not Meet Stds for Expected Performance11 May 1995Forwards LER 95-005.Event Did Not Have Adverse Effect on Health & Safety of Public,But Clearly Does Not Meet Stds for Expected Performance
05000499/LER-1997-002, Forwards LER 97-002-00,for Hlp Re All Four Steam Generators Being Classified Category C-313 March 1997Forwards LER 97-002-00,for Hlp Re All Four Steam Generators Being Classified Category C-3
05000499/LER-1997-003, Forwards LER 97-003-01,failure to Meet Requirements of TS 4.5.2.c Re Surveillance Insp of Containment for Loose Debris28 April 1997Forwards LER 97-003-01,failure to Meet Requirements of TS 4.5.2.c Re Surveillance Insp of Containment for Loose Debris
05000499/LER-1997-007, Forwards LER 97-007-00,for Stp,Unit 2 Re Manual Reactor Trip Due to Loss of Inventory in SG 2D.Commitments Listed18 December 1997Forwards LER 97-007-00,for Stp,Unit 2 Re Manual Reactor Trip Due to Loss of Inventory in SG 2D.Commitments Listed
05000499/LER-1998-001, Forwards LER 98-001-00 Re Failure to Meet TS Requirements for Inoperable Sdg 21.LER Meets Special Rept Requirements of STP TS 4.8.1.1.3 & 6.9.2 Re Valid Failure of Sdg 21 on 97122816 February 1998Forwards LER 98-001-00 Re Failure to Meet TS Requirements for Inoperable Sdg 21.LER Meets Special Rept Requirements of STP TS 4.8.1.1.3 & 6.9.2 Re Valid Failure of Sdg 21 on 971228
05000499/LER-1998-002, Forwards LER 98-002-00,re Automatic Reactor Trip Due to low-low Level in SG 2A.Commitments Made by Util Are in Corrective Actions Section15 October 1998Forwards LER 98-002-00,re Automatic Reactor Trip Due to low-low Level in SG 2A.Commitments Made by Util Are in Corrective Actions Section
05000499/LER-1998-004, Forwards LER 98-004-00,re Completion of Plant SD Required by TS 3.3.2.Commitments Made by Util Are Found in Corrective Action Section of Attachment26 January 1999Forwards LER 98-004-00,re Completion of Plant SD Required by TS 3.3.2.Commitments Made by Util Are Found in Corrective Action Section of Attachment
05000499/LER-1999-002, Forwards LER 99-002-00 Re Unit 2 Automatic Reactor Trip,Due to Loss of Power to Turbine Control Sys.Event Did Not Have Adverse Effect on Health & Safety of Public.Commitments Are Contained in Corrective Action Section of Encl18 February 1999Forwards LER 99-002-00 Re Unit 2 Automatic Reactor Trip,Due to Loss of Power to Turbine Control Sys.Event Did Not Have Adverse Effect on Health & Safety of Public.Commitments Are Contained in Corrective Action Section of Encl
05000499/LER-1999-003, Forwards LER 99-003-00 Re Esfa & Entry Into TS 3.0.3 Following Partial Loss of Offsite Power Due to Fault in Switchyard Circuit Breaker.Licensee Commitments Are Listed in Corrective Actions Section of LER9 April 1999Forwards LER 99-003-00 Re Esfa & Entry Into TS 3.0.3 Following Partial Loss of Offsite Power Due to Fault in Switchyard Circuit Breaker.Licensee Commitments Are Listed in Corrective Actions Section of LER
05000499/LER-1999-004, Forwards LER 99-004-00 Re non-compliance with TS 3.9.4 in That It Was Not Possible to Close Min of One of Personnel Air Lock Doors within 30 Minutes.Licensee Commitments Listed in Corrective Action Section of Attachment5 May 1999Forwards LER 99-004-00 Re non-compliance with TS 3.9.4 in That It Was Not Possible to Close Min of One of Personnel Air Lock Doors within 30 Minutes.Licensee Commitments Listed in Corrective Action Section of Attachment
05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER20 September 1999Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER
05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment30 September 1999Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment
ML17333A05913 December 1988Responds to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Util Reviewed Generic Ltr & NUREG-1275,Vol 2 & Performed Design & Operations Verification of Instrument Air Sys for Plant
ML17341A0022 June 1980Responds to IE Bulletin 80-05, Vacuum Condition Resulting in Damage to Chemical Vol Control Sys (CVCS) Holdup Tanks. Two Tanks Will Be Augmented W/Vacuum Relief Valves Prior to Plant Operation.Sys Summary Table Encl
ML19199A3513 April 1979Discusses Licensing Aspects of Project in Light of Possible Generic Design Problems in Nuclear Power Plants.Requests Immediate Review of Plants in Progress to Determine Safety
ML19207A2665 July 1979Notifies That City of San Antonio Has Neither Initiated Nor Received Any Discovery Requests During June 1979.Certificate of Svc Encl
ML19207A41410 July 1979Requests to Participate in Proceedings
ML19207A4663 July 1979Requests Opportunity to Participate in Hearing.Files Petition to Intervene.Requests Procedural Info
ML19207A4752 July 1979Notifies That City of Austin,Tx Has Not Initiated Nor Received Any Discovery Requests During June 1979. Certificate of Svc Encl
ML19207A67016 July 1979Forwards Return on Svc of Subpoena Issued by ASLB to El Paso Electric Co
ML19207B92817 July 1979Forwards Seven Ltrs Opposing Proposed Nuclear Generator Outside Wallis,Tx
ML19207C01324 July 1979Forwards 790724 Motion for Extension of Time to Respond to DOJ Motion Compelling Production of Privileged Documents. Affixation of Date & Time of Filing Is Requested
ML19208A1617 August 1979Submits Jul 1979 Status Rept on Discovery.Utils Neither Initiated Nor Received Any Discovery Requests.Certificate of Svc Encl
ML19208A68917 September 1979Forwards New Page for Security Plan.Page Withheld (Ref 10CFR2.790)
ML19208A96717 September 1979Forwards Psar,Amend 53
ML19208B34917 August 1979Responds to IE Bulletin,78-12,78-12A & 78-12B.Info Required Has Been Included in 790608 Generic Rept, Atypical Weld Matl in Reactor Pressure Vessel Welds.
ML19208B4892 July 1979Seeks Admission as Full Party to Hearings Re Proposed Plant as Resident Living within 50 Miles of Site.Opposes Nuclear Plants Due to Present State of Technology
ML19208B4972 June 1979Petitions to Intervene Per 10CFR2.714.Requests Copies of SER & Fes
ML19208B5014 July 1979Requests Permission to Intervene in Proceedings as Resident Living within 40 Miles of Site.Requests Notification of Time & Place
ML19208B54723 July 1979Requests Public Hearing for Proposed Reactor Site Be Held in Wallis,Tx,Due to Proximity of City Proposed Site
ML19208B54824 July 1979Opposes Plant Const Due to Proximity of Site to Concentrations of Population
ML19208B63617 July 1979Requests Intervenor Status.Opposes Licensing of Plant Due to Fears of Escaping Radiation,Meltdown of Core,Increased Chance of Flooding in Area & Problem of Waste Disposal
ML19208B65111 July 1979Responds to NRC 790604 Ltr Re Violation Noted in IE Insp Repts 50-498/79-08 & 50-499/79-08.Corrective Actions: Written Procedure Has Been Issued to Document Weld Monitoring Program
ML19208C3041 August 1979Forwards Testimonies of DA Springs,Jb Solomon,Rm Gross & of Rogers,In Response to Tx Utils Generating Co & Houston Lighting & Power First Set of Interrogatories
ML19208C39613 August 1979Submits Jul 1979 Rept on Discovery Status.All Remaining Documents Requested by DOJ Were Provided by Central Power & Light.Latter Complied W/Houston Lighting & Power First Interrogatories & Requests for Production of Documents
ML19208C49131 July 1979Ack Receipt of R Waters 790712 Ltr to Nrc.Util Has No Objection to Appearance of R Waters at Future Prehearing Conference or Evidentiary Hearing.Certificate of Svc Encl
ML19208C5638 August 1979Submits Jul 1979 Status Rept on Discovery.Util Has Responded to Tx Utils Generating & Houston Lighting & Power First Set of Interrogatories & Request for Production of Documents
ML19208C5717 August 1979Advises That Environ OL Stage Rept & Environ CP State Rept Will Be Forwarded This Week.Fsar Forwarded on 790831
ML19208C62125 July 1979Reaffirms Intention to Be Intervenor in Proceeding. Cl Johnson Shall Be Representative.Cl Johnson & J Scott Are Presently Authorized to Speak on Behalf of Organization. Other Members May Be Authorized in Future
ML19208D02317 July 1979Ack Receipt of K Mohke,Jh Robinson,Ws Cleaves,D Day & F Barnes Ltrs.Respondents Should Be Given Opportunity to Make Limited Appearance Only.Certificate of Svc Encl
ML19208D11916 July 1979Requests Limited Appearance at Public Hearing for Proposed Site
ML19208D12030 July 1979Ack Receipt of 790723 Ltr & Requests Limited Appearance at Public Hearing