ML19208B349
| ML19208B349 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/17/1979 |
| From: | Eric Turner HOUSTON LIGHTING & POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| ST-HL-AE-368, NUDOCS 7909200060 | |
| Download: ML19208B349 (1) | |
Text
%
O Houston f
Lighting L !!
l'
& power 1
Company li Ele ~.mc Tower August 17, 1979 l-I PG Bcx 1700 ST-HL-AE-368 Hous:cn. Texas 77001 SFN: V-0540 Cirector, Recian IV C#ffce of Inspection & Enforcement 51' Ryan Plan Drive, Suite 1000 Arlinc:cn, Texas 76102 Cear Sir:
South Texas Project Unit 1 & 2 Docket Nos. STN 50-498, STN 50-499 IE Bulletins Nos. 78-12, 12A, and 12B Sulletins Nos. 78-12, 12A, and 128, received October 2, 1978, fiovember 27, 1978, and March 22, 1979, respectively, have been reviewed by Houston Lighting & Power Company (HL&P).
The informa-tion requested by the Bulletins was compiled by Combustion Engineer-ing, Inc. (CE), and was submitted to the NRC on June 8, 1979, in a generic report entitled " Atypical Weld Material in Reactor Pressure Vessel Welds". The documentation procedures used by CE in compiling the report have been reviewed by HL&P personnel, and HL&P has concluded that the information required that is pertinent to the South Texas Project reactor pressure vessels has been in-cluded in the report.
If you have any questions, please contact us.
Very truly yours, OP"D 6W1 b
h oj'g-E. A. Turner
,Vice President b_k k
Power Plant Construction o
a
& Technical Services PLW:bf cc:
M. D. Schwarz (Baker & Botts)
R. Gordon Gooch (Baker & Botts)
J. R. Newman (Lowenstein, Newman, Reis, Axelrad & Toll)
D. G. Barker A. J. Granger R. A. Frazar NRC Office of Inspection & Enforcement Division of Reactor Construction Inspection Nuclear RegJlatory Comission gj
<<L 7 909 2 00 060t G