Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000482/LER-1987-061, Forwards LER 87-061-00 & LER 91-004-01.Revised LER Corrects LER Number & Event Date11 November 1991Forwards LER 87-061-00 & LER 91-004-01.Revised LER Corrects LER Number & Event Date
05000482/LER-1991-007, Provides Revised Schedule for Completing Corrective Actions Identified in LER 91-007-00 Re Inadequate Inservice Testing Procedure Used to Perform Certain Valve Testing.Pump Procedures Will Be Completed by 92033127 March 1992Provides Revised Schedule for Completing Corrective Actions Identified in LER 91-007-00 Re Inadequate Inservice Testing Procedure Used to Perform Certain Valve Testing.Pump Procedures Will Be Completed by 920331
05000482/LER-1993-006, Forwards LER 93-006-00 Re Exposure of Individual in Excess of Applicable Limits in 10CFR20.10130 April 1993Forwards LER 93-006-00 Re Exposure of Individual in Excess of Applicable Limits in 10CFR20.101
05000482/LER-1993-012, Forwards LER 93-012-01 Re Noise Event Experienced During heat-up Following Sixth Refueling Outage.Ler Addresses Results of Thermal Expansion Monitoring Program.New Info Noted by Rev Bars3 October 1997Forwards LER 93-012-01 Re Noise Event Experienced During heat-up Following Sixth Refueling Outage.Ler Addresses Results of Thermal Expansion Monitoring Program.New Info Noted by Rev Bars
05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl15 October 1999Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,EnclMissed surveillance
05000482/LER-1996-001, Revises Commitment Made in LER 96-001-00 Re Repair/Rework of CWS Condenser Water Box Air Release Valves.New Committed Date for Refurbishment of Valves Will Be 98043012 September 1997Revises Commitment Made in LER 96-001-00 Re Repair/Rework of CWS Condenser Water Box Air Release Valves.New Committed Date for Refurbishment of Valves Will Be 980430
05000482/LER-1996-002, Forwards LER 96-002-00 Re Inoperability of Existing Esws a Train Due to Inability of Existing Esws Design to Meet Original Plant Design Basis for Environ Conditions Which Existed on 96013029 February 1996Forwards LER 96-002-00 Re Inoperability of Existing Esws a Train Due to Inability of Existing Esws Design to Meet Original Plant Design Basis for Environ Conditions Which Existed on 960130Frazil ice
05000482/LER-1996-004, Forwards LER 96-004-00 Re Condition Resulting in Plant Violation of TS 3.5.419 April 1996Forwards LER 96-004-00 Re Condition Resulting in Plant Violation of TS 3.5.4
05000482/LER-1996-011, Forwards LER 96-011-01,96-012-01,96-013-01,96-014-01, 96-015-01 & 96-016-0131 January 1997Forwards LER 96-011-01,96-012-01,96-013-01,96-014-01, 96-015-01 & 96-016-01
05000482/LER-1997-001, Forwards Suppl to LER 97-001-03,providing Addl Example of Surveillance Performed,But Not at Correct Frequency. Editorial Changes Made to Attachment 1 & 2 of LER for Completeness of Info12 September 1997Forwards Suppl to LER 97-001-03,providing Addl Example of Surveillance Performed,But Not at Correct Frequency. Editorial Changes Made to Attachment 1 & 2 of LER for Completeness of Info
05000482/LER-1997-010, Forwards LER 97-010-03,concerning Three Surveillance Test Deficiencies Found During GL 96-01 Review.Final Suppl to LER Detailing Root Cause & Corrective Actions30 June 1998Forwards LER 97-010-03,concerning Three Surveillance Test Deficiencies Found During GL 96-01 Review.Final Suppl to LER Detailing Root Cause & Corrective Actions
05000482/LER-1997-015, Forwards LER 97-015-01 Which Documents That Violation of TSs Occurred Re Required ISI VT-3 Exams of Pressurizer Safety Valves,Per 10CFR50.73(a)(2)(i)(B)11 December 1997Forwards LER 97-015-01 Which Documents That Violation of TSs Occurred Re Required ISI VT-3 Exams of Pressurizer Safety Valves,Per 10CFR50.73(a)(2)(i)(B)
05000482/LER-1997-016, Forwards LER 97-016-02,correcting Discrepancy Between Abstract & Additional CA Sections of LER 97-016-01,dtd 971219 Re Completion Date for Planned Fire Protection Organization Structure & Program Ownership self-assessment27 January 1998Forwards LER 97-016-02,correcting Discrepancy Between Abstract & Additional CA Sections of LER 97-016-01,dtd 971219 Re Completion Date for Planned Fire Protection Organization Structure & Program Ownership self-assessment
05000482/LER-1997-019, Forwards LER 97-019-00 Re Failure to Comply W/Ts Surveillance Requirement 4.5.2b.1 for Venting of ECCS Pump Casings & Discharge Piping High Points13 November 1997Forwards LER 97-019-00 Re Failure to Comply W/Ts Surveillance Requirement 4.5.2b.1 for Venting of ECCS Pump Casings & Discharge Piping High Points
05000482/LER-1997-020, Forwards LER 97-020-00,documenting Historical Violation of TS Re Failure to Meet Snubber TS LCO Requirements9 December 1997Forwards LER 97-020-00,documenting Historical Violation of TS Re Failure to Meet Snubber TS LCO Requirements
05000482/LER-1997-021, Forwards LER 97-021-00,which Documents Violation of TS Re Inadequate Ssps Surveillance Testing,Per 10CFR50.73(a)(2)(i) (B)19 December 1997Forwards LER 97-021-00,which Documents Violation of TS Re Inadequate Ssps Surveillance Testing,Per 10CFR50.73(a)(2)(i) (B)
05000482/LER-1997-022, Forwards LER 97-022-00,re Violation of WCGS TS Involving Not Meeting Requirements for Performing Tt Testing Prior to Startup22 December 1997Forwards LER 97-022-00,re Violation of WCGS TS Involving Not Meeting Requirements for Performing Tt Testing Prior to Startup
05000482/LER-1997-023, Forwards LER 97-023-00 Which Documents Violation of WCGS TS Involving Failure to Maintain Both Containment Personnel Hatch Doors Closed,Per 10CFR50.73(a)(2)(i)(B)23 December 1997Forwards LER 97-023-00 Which Documents Violation of WCGS TS Involving Failure to Maintain Both Containment Personnel Hatch Doors Closed,Per 10CFR50.73(a)(2)(i)(B)
05000482/LER-1997-024, Forwards LER 97-024-00 Re ESFs & RPS Actuations Which Were Caused by Spike on ex-core Neutron Monitoring Sys Nuclear Instrument NI-35 Intermediate Range Channel23 December 1997Forwards LER 97-024-00 Re ESFs & RPS Actuations Which Were Caused by Spike on ex-core Neutron Monitoring Sys Nuclear Instrument NI-35 Intermediate Range Channel
05000482/LER-1997-026, Forwards LER 97-026-01,to Reflect Change in Date of Commitment Re Procedure Rev Which Is Necessary Prior to Next Outage.Date Was Changed to Reflect Completion Prior to Commencement of Outage24 November 1998Forwards LER 97-026-01,to Reflect Change in Date of Commitment Re Procedure Rev Which Is Necessary Prior to Next Outage.Date Was Changed to Reflect Completion Prior to Commencement of Outage
05000482/LER-1997-027, Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by Util4 June 1999Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by UtilMissed surveillance
05000482/LER-1998-001, Forwards LER 98-001-01 Re Pressurizer Code Safety Valves Being Outside of +/-1% Lift Setting Tolerance Allowed by Ts. Commitments Made by Util,Encl27 August 1998Forwards LER 98-001-01 Re Pressurizer Code Safety Valves Being Outside of +/-1% Lift Setting Tolerance Allowed by Ts. Commitments Made by Util,Encl
05000482/LER-1998-002, Forwards LER 98-002-00 Re Violation of Operating License Condition 2.C.(5)(a).No New Commitments Made11 May 1998Forwards LER 98-002-00 Re Violation of Operating License Condition 2.C.(5)(a).No New Commitments MadeFire Protection Program
05000482/LER-1998-004, Forwards LER 98-004-01 Re Condition That Resulted in Nuclear Power Plant Being in Condition,Outside Design Basis of Plant.Attachment to Ltr Identifies Actions Committed to by Util in Encl LER22 March 1999Forwards LER 98-004-01 Re Condition That Resulted in Nuclear Power Plant Being in Condition,Outside Design Basis of Plant.Attachment to Ltr Identifies Actions Committed to by Util in Encl LERSafe Shutdown
05000482/LER-1998-005, Forwards LER 98-005-00,identifying Potential Compromise of Safeguards Info Due to Unlocked Safeguards Cabinet. Util Commitments,Encl6 November 1998Forwards LER 98-005-00,identifying Potential Compromise of Safeguards Info Due to Unlocked Safeguards Cabinet. Util Commitments,Encl
05000482/LER-1998-006, Forwards LER 98-006-00 Re Condition in Which TS Bases Were Not Met During Surveillance Testing of EDG Standpipe Level Automatic Control Circuitry.Actions Committed to by Util Also Encl24 November 1998Forwards LER 98-006-00 Re Condition in Which TS Bases Were Not Met During Surveillance Testing of EDG Standpipe Level Automatic Control Circuitry.Actions Committed to by Util Also Encl
05000482/LER-1998-007, Forwards LER 98-007-00 Re Condition Prohibited by Plant Ts. List of Commitments Made by Util Are Encl24 November 1998Forwards LER 98-007-00 Re Condition Prohibited by Plant Ts. List of Commitments Made by Util Are Encl
05000482/LER-1998-009, Forwards LER 98-009-00,re Inability to Locally Control Atmospheric Relief Valve Following Safe SD Fire Scenario. Attachment 2 Contains Commitments Made by Util1 February 1999Forwards LER 98-009-00,re Inability to Locally Control Atmospheric Relief Valve Following Safe SD Fire Scenario. Attachment 2 Contains Commitments Made by UtilSafe Shutdown
05000482/LER-1998-010, Forwards LER 98-010-00,submitted,per 10CFR50.73(a)(2)(i)(B) Re Wolf Creek Operating Corp Identification of Installed Snubber Having Defective Part.Attachment I Identifies Actions Committed to by Util in Encl LER5 February 1999Forwards LER 98-010-00,submitted,per 10CFR50.73(a)(2)(i)(B) Re Wolf Creek Operating Corp Identification of Installed Snubber Having Defective Part.Attachment I Identifies Actions Committed to by Util in Encl LER
05000482/LER-1999-001, Forwards LER 99-001-00,re Identification of Missed Surveillance Required by TS 4.7.3a.Commitments Made by Util, Encl1 March 1999Forwards LER 99-001-00,re Identification of Missed Surveillance Required by TS 4.7.3a.Commitments Made by Util, EnclMissed surveillance
05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl15 October 1999Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl
05000482/LER-1999-003, Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are Encl10 May 1999Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are EnclMissed surveillance
05000482/LER-1999-004, Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER12 May 1999Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER
05000482/LER-1999-005, Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl11 June 1999Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl
05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl15 September 1999Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl
05000482/LER-1999-007, Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl18 June 1999Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl
05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER3 September 1999Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER
05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER10 September 1999Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LERSafe Shutdown
05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util16 September 1999Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util
05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I17 September 1999Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment IMissed surveillance
05000483/LER-1984-011, Forwards LER 84-011-00 Re Unauthorized Operation of Plant Equipment.Ler Withheld (Ref 10CFR73.21)3 August 1984Forwards LER 84-011-00 Re Unauthorized Operation of Plant Equipment.Ler Withheld (Ref 10CFR73.21)
05000483/LER-1984-056, Forwards LER 84-056-0020 November 1984Forwards LER 84-056-00
05000483/LER-1985-025, Forwards LER 85-025-01 Re Intermediate Range High Flux Reactor Trip Caused by Blown Fuse in ex-core Neutron Monitoring Channel.Expected Submission Date of Supplemental Rept Amended Due to Continuing Investigation27 September 1985Forwards LER 85-025-01 Re Intermediate Range High Flux Reactor Trip Caused by Blown Fuse in ex-core Neutron Monitoring Channel.Expected Submission Date of Supplemental Rept Amended Due to Continuing Investigation
05000483/LER-1986-038, Forwards LER 86-038-00 Re Containment Purge Isolation Signal & Control Room Ventilation Isolation Due to Increased Gaseous Radioactivity Levels in Containment8 December 1986Forwards LER 86-038-00 Re Containment Purge Isolation Signal & Control Room Ventilation Isolation Due to Increased Gaseous Radioactivity Levels in Containment
05000483/LER-1987-013, Discusses Encl LER 87-013-01 Re Inoperable Control Room Emergency Ventilation Sys.Ler Discusses Two Events When Both Trains of Sys Simultaneously Rendered Inoperable.First Event Caused by Personnel Error4 November 1987Discusses Encl LER 87-013-01 Re Inoperable Control Room Emergency Ventilation Sys.Ler Discusses Two Events When Both Trains of Sys Simultaneously Rendered Inoperable.First Event Caused by Personnel Error
05000483/LER-1995-002, Forwards LER 95-002 Re Missed Surveillance of Containment Purge Exhaust Sampling Valve Circuit Feed Breaker & Inoperable Fuse Due to Personnel Oversight1 June 1995Forwards LER 95-002 Re Missed Surveillance of Containment Purge Exhaust Sampling Valve Circuit Feed Breaker & Inoperable Fuse Due to Personnel OversightMissed surveillance
05000483/LER-1995-003, Forwards LER 95-003 Concerning Missed Surveillance of Refuel Water Storage Tank Protection Loop BNLP09339 June 1995Forwards LER 95-003 Concerning Missed Surveillance of Refuel Water Storage Tank Protection Loop BNLP0933Missed surveillance
05000483/LER-1997-005, Forwards LER 97-005-05,re Situation in Which Surveillances Required by TS Were Missed Due to Misintepretation of SR, Per 10CFR50.73(a)(2)(i)(B)19 December 1997Forwards LER 97-005-05,re Situation in Which Surveillances Required by TS Were Missed Due to Misintepretation of SR, Per 10CFR50.73(a)(2)(i)(B)
05000483/LER-1998-001, Forwards LER 98-001-01,being Submitted to Clarify Scope of Original Reviews Performed for Corrective Action Number 3 in LER 98-001-00.Reviews Have Identified Case of Failure to Properly Establish Equipment Operability10 March 1999Forwards LER 98-001-01,being Submitted to Clarify Scope of Original Reviews Performed for Corrective Action Number 3 in LER 98-001-00.Reviews Have Identified Case of Failure to Properly Establish Equipment Operability
05000483/LER-1998-003, Forwards LER 98-003-01 Re Inadvertent Actuation of ESFAS Due to 'A' SG High Level During Refuel 9.Rept Is Submitted to Report Change in C/A from That Reported in Original Rept12 May 1999Forwards LER 98-003-01 Re Inadvertent Actuation of ESFAS Due to 'A' SG High Level During Refuel 9.Rept Is Submitted to Report Change in C/A from That Reported in Original Rept