05000369/LER-1982-062, Forwards LER 82-062/03L-0 | 31 August 1982 | Forwards LER 82-062/03L-0 | Unidentified leakage |
05000369/LER-1982-063, Forwards LER 82-063/03L-0 | 1 September 1982 | Forwards LER 82-063/03L-0 | |
05000369/LER-1982-065, Forwards LER 82-065/03L-0.Detailed Event Analysis Encl | 8 September 1982 | Forwards LER 82-065/03L-0.Detailed Event Analysis Encl | |
05000369/LER-1982-066, Forwards LER 82-066/03L-0.Detailed Event Analysis Encl | 10 September 1982 | Forwards LER 82-066/03L-0.Detailed Event Analysis Encl | |
05000369/LER-1982-068, Forwards LER 82-068/03L-0 | 17 September 1982 | Forwards LER 82-068/03L-0 | Fire Barrier |
05000369/LER-1982-069, Forwards LER 82-069/03L-0.Detailed Event Analysis Encl | 1 October 1982 | Forwards LER 82-069/03L-0.Detailed Event Analysis Encl | Fire Watch |
05000369/LER-1982-070, Forwards LER 82-070/03L-0 | 15 October 1982 | Forwards LER 82-070/03L-0 | |
05000369/LER-1982-072, Forwards LER 82-072/03L-0 | 5 November 1982 | Forwards LER 82-072/03L-0 | |
05000369/LER-1982-074, Forwards LER 82-074/03L-0.Detailed Event Analysis Encl | 30 November 1982 | Forwards LER 82-074/03L-0.Detailed Event Analysis Encl | |
05000369/LER-1982-075, Forwards LER 82-075/03L-0 | 17 November 1982 | Forwards LER 82-075/03L-0 | |
05000369/LER-1982-076, Forwards LER 82-076/03L-0 | 3 December 1982 | Forwards LER 82-076/03L-0 | |
05000369/LER-1982-077, Forwards LER 82-077/03L-0 | 3 December 1982 | Forwards LER 82-077/03L-0 | |
05000369/LER-1982-078, Forwards LER 82-078/03L-0 | 8 December 1982 | Forwards LER 82-078/03L-0 | |
05000369/LER-1982-079, Forwards LER 82-079/03L-0 | 15 December 1982 | Forwards LER 82-079/03L-0 | |
05000369/LER-1982-080, Forwards LER 82-080/03L-0 | 22 December 1982 | Forwards LER 82-080/03L-0 | |
05000369/LER-1982-082, Forwards LER 82-082/03L-0 | 28 January 1983 | Forwards LER 82-082/03L-0 | |
05000369/LER-1983-002, Forwards LER 83-002/03L-0 | 9 February 1983 | Forwards LER 83-002/03L-0 | |
05000369/LER-1983-003, Forwards LER 83-003/03L-0 | 15 February 1983 | Forwards LER 83-003/03L-0 | |
05000369/LER-1983-004, Forwards LER 83-004/03L-0 | 18 February 1983 | Forwards LER 83-004/03L-0 | |
05000369/LER-1983-005, Forwards LER 83-005/03L-0.Detailed Event Analysis Encl | 25 February 1983 | Forwards LER 83-005/03L-0.Detailed Event Analysis Encl | |
05000369/LER-1983-006, Forwards LER 83-006/03L-0.Detailed Event Analysis Encl | 2 March 1983 | Forwards LER 83-006/03L-0.Detailed Event Analysis Encl | |
05000369/LER-1983-007, Forwards LER 83-007/03L-0 | 2 March 1983 | Forwards LER 83-007/03L-0 | |
05000369/LER-1983-008, Forwards LER 83-008/03L-0 | 16 March 1983 | Forwards LER 83-008/03L-0 | |
05000369/LER-1983-009, Forwards LER 83-009/03L-0.Detailed Event Analysis Encl | 16 March 1983 | Forwards LER 83-009/03L-0.Detailed Event Analysis Encl | |
05000369/LER-1983-010, Forwards LER 83-010/03L-0 | 21 March 1983 | Forwards LER 83-010/03L-0 | |
05000369/LER-1983-011, Forwards LER 83-011/01T-0.Detailed Event Analysis Encl | 24 March 1983 | Forwards LER 83-011/01T-0.Detailed Event Analysis Encl | |
05000369/LER-1983-012, Forwards LER 83-012/03L-0 | 1 April 1983 | Forwards LER 83-012/03L-0 | |
05000369/LER-1983-013, Forwards LER 83-013/03L-0.Detailed Event Analysis Encl | 29 April 1983 | Forwards LER 83-013/03L-0.Detailed Event Analysis Encl | |
05000369/LER-1983-014, Forwards LER 83-014/03L-0 | 15 April 1983 | Forwards LER 83-014/03L-0 | |
05000369/LER-1983-015, Forwards LER 83-015/03L-0 & 83-003/03L-0 | 22 April 1983 | Forwards LER 83-015/03L-0 & 83-003/03L-0 | |
05000369/LER-1983-016, Forwards LER 83-016/03L-0 | 26 April 1983 | Forwards LER 83-016/03L-0 | |
05000369/LER-1983-043, Forwards LER 83-043/01T-0 & 83-029/01T-0 | 14 July 1983 | Forwards LER 83-043/01T-0 & 83-029/01T-0 | Unanalyzed Condition Power change |
05000369/LER-1983-117, Forwards Rev 1 to LER 83-117/03L-1.Rev Submitted in Same Format as Original,Per NUREG-1022,Suppl 1,Section 14.8. Incident Attributed to Design Oversight.Procedure Revised to Prevent Further Violation of Tech Spec 3.1.3.6 | 9 June 1986 | Forwards Rev 1 to LER 83-117/03L-1.Rev Submitted in Same Format as Original,Per NUREG-1022,Suppl 1,Section 14.8. Incident Attributed to Design Oversight.Procedure Revised to Prevent Further Violation of Tech Spec 3.1.3.6 | |
05000369/LER-1984-022, Discusses LER 84-22 Describing Design Deficiency in Area of Seismic Qualification of Certain Fire Protection & Drain Piping Serving Control Room.Design Mod to Rectify Situation Will Be Completed by 851101 | 10 October 1984 | Discusses LER 84-22 Describing Design Deficiency in Area of Seismic Qualification of Certain Fire Protection & Drain Piping Serving Control Room.Design Mod to Rectify Situation Will Be Completed by 851101 | |
05000369/LER-1984-025, Forwards LER 84-025-00 Re Open Vent Valve in Containment Spray Sys.Event Initially Determined to Be Not Reportable Due to Minimal Impact on Design Function.Event Determined Reportable Per Insp Rept 50-369/84-29 | 9 November 1984 | Forwards LER 84-025-00 Re Open Vent Valve in Containment Spray Sys.Event Initially Determined to Be Not Reportable Due to Minimal Impact on Design Function.Event Determined Reportable Per Insp Rept 50-369/84-29 | |
05000369/LER-1984-029, Forwards LER 84-029-00 Re High Concentration of Nitrogen in Upper Head Injection (Uhi).Rept Re Improperly Installed Uhi Level Instrumentation Scheduled to Be Submitted by 841207 | 29 November 1984 | Forwards LER 84-029-00 Re High Concentration of Nitrogen in Upper Head Injection (Uhi).Rept Re Improperly Installed Uhi Level Instrumentation Scheduled to Be Submitted by 841207 | |
05000369/LER-1985-003, Advises of Delay of Commitment in LER 85-003 to Reroute Instrument Impulse Lines & to Heat Trace & Insulate by Dec 1985,due to Design & Matl Lead Times.Implementation of Mods Delayed Until 1986 Outage | 20 August 1985 | Advises of Delay of Commitment in LER 85-003 to Reroute Instrument Impulse Lines & to Heat Trace & Insulate by Dec 1985,due to Design & Matl Lead Times.Implementation of Mods Delayed Until 1986 Outage | |
05000369/LER-1985-021, Forwards LER 85-021-01 Re Personnel Exposure,Initially Determined to Be Overexposure.Revised Calculation Indicates No Overexposure Occurred | 2 August 1985 | Forwards LER 85-021-01 Re Personnel Exposure,Initially Determined to Be Overexposure.Revised Calculation Indicates No Overexposure Occurred | Overexposure |
05000369/LER-1986-001, Forwards LER 86-001-00 Re Chemical & Vol Control Sys Pump Inoperable for More than 72 H.Decision to Repair Pump to Stop Leakage Resulted in Pump Being Declared Inoperable | 4 February 1986 | Forwards LER 86-001-00 Re Chemical & Vol Control Sys Pump Inoperable for More than 72 H.Decision to Repair Pump to Stop Leakage Resulted in Pump Being Declared Inoperable | |
05000369/LER-1987-003, Forwards Rev 1 to LER 87-003 Re Inoperable Containment Air Return Fans Due to Missing Water Curbs.Event Was Subject of Temporary Waiver of Tech Spec Requirements Obtained from NRC on 870130,per | 15 April 1987 | Forwards Rev 1 to LER 87-003 Re Inoperable Containment Air Return Fans Due to Missing Water Curbs.Event Was Subject of Temporary Waiver of Tech Spec Requirements Obtained from NRC on 870130,per | |
05000369/LER-1987-016, Informs That Unit 1 Did Not Exceed Indicated Rated Thermal Power & That LER 87-016 Will Not Be Submitted or Used in Future | 22 September 1987 | Informs That Unit 1 Did Not Exceed Indicated Rated Thermal Power & That LER 87-016 Will Not Be Submitted or Used in Future | |
05000369/LER-1987-020, Forwards Revised LER 87-020-01 Re 8-day Inoperability of RHR Pump 1B Due to Addl Analysis of Event & to Correct Wording in Abstract,Provide Expanded Safety Analysis & Discuss Addl Corrective Action | 16 February 1988 | Forwards Revised LER 87-020-01 Re 8-day Inoperability of RHR Pump 1B Due to Addl Analysis of Event & to Correct Wording in Abstract,Provide Expanded Safety Analysis & Discuss Addl Corrective Action | |
05000369/LER-1987-033, Informs That LER 87-33 Due on 880108 Delayed Due to Unresolved Concerns & Will Be Submitted on 880129 | 30 December 1987 | Informs That LER 87-33 Due on 880108 Delayed Due to Unresolved Concerns & Will Be Submitted on 880129 | |
05000369/LER-1989-004, Informs That LER 89-004 Re Steam Generator Tube Rupture on 890307 Will Be Delayed & Submitted No Later than 890420.Addl Calculations Re Leak Rate & Total Steam Leakage Required to Complete Rept | 6 April 1989 | Informs That LER 89-004 Re Steam Generator Tube Rupture on 890307 Will Be Delayed & Submitted No Later than 890420.Addl Calculations Re Leak Rate & Total Steam Leakage Required to Complete Rept | |
05000369/LER-1991-014, Requests Delay for Submitting LER 91-014-00 Re Mispositioning of Valves,Causing Containment Spray & RHR Sys Inoperability from 911111 to 911211 | 11 November 1991 | Requests Delay for Submitting LER 91-014-00 Re Mispositioning of Valves,Causing Containment Spray & RHR Sys Inoperability from 911111 to 911211 | |
05000369/LER-1993-003, Forwards LER 93-003-00 Re Problem Investigation Process 0-M93-0198 Covering Past Inoperability of Train B of CR Ventilation Sys Due to Possible Fabrication/Installation Deficiency | 3 May 1993 | Forwards LER 93-003-00 Re Problem Investigation Process 0-M93-0198 Covering Past Inoperability of Train B of CR Ventilation Sys Due to Possible Fabrication/Installation Deficiency | |
05000369/LER-1994-010, Forwards LER 94-010-01 Re Failure to Perform TS Required Surveillance Because Testing Not Specified.Event Considered to Be of No Significance W/Respect to Health & Safety of Public | 11 May 1995 | Forwards LER 94-010-01 Re Failure to Perform TS Required Surveillance Because Testing Not Specified.Event Considered to Be of No Significance W/Respect to Health & Safety of Public | |
05000369/LER-1995-001, Forwards LER 95-001-01 Concerning Manual Trip Initiated as Result of Equipment Failure | 7 June 1995 | Forwards LER 95-001-01 Concerning Manual Trip Initiated as Result of Equipment Failure | |
05000369/LER-1995-003, Forwards LER 95-003,Rev 1 Re Failure of Turbochargers Associated W/Edgs | 31 August 1995 | Forwards LER 95-003,Rev 1 Re Failure of Turbochargers Associated W/Edgs | |
05000369/LER-1996-001, Forwards LER 96-001-01 Re Manual Reactor Trip.Rev Due to Determination That Event Not NPRDS Reportable & Not Considered Significant Re Public Health & Safety | 19 April 1996 | Forwards LER 96-001-01 Re Manual Reactor Trip.Rev Due to Determination That Event Not NPRDS Reportable & Not Considered Significant Re Public Health & Safety | |