05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed | 1 September 1999 | Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed | |
05000353/LER-1995-003, Forwards LER 95-003,reporting Automatic Closure of Four Unit 2 Drywell Chilled Water Sys Inboard Containment Isolation Valves Due to Inadvertent Loss of Power to Interposing Relay in Closure Circuit for Valves | 27 February 1995 | Forwards LER 95-003,reporting Automatic Closure of Four Unit 2 Drywell Chilled Water Sys Inboard Containment Isolation Valves Due to Inadvertent Loss of Power to Interposing Relay in Closure Circuit for Valves | |
05000353/LER-1995-004, Forwards LER 95-004 Re Engineered Safety Sys Actuation Due to Momentary Spurious Low Rv Water Level Isolation Signal | 16 March 1995 | Forwards LER 95-004 Re Engineered Safety Sys Actuation Due to Momentary Spurious Low Rv Water Level Isolation Signal | Reactor Vessel Water Level |
05000353/LER-1995-005, Forwards LER 95-005 Re Blowing of Primary Conatinment & Rv Isolation Control Sys Fuse Due to Malfunctioning +20 Vdc Power Supply | 16 March 1995 | Forwards LER 95-005 Re Blowing of Primary Conatinment & Rv Isolation Control Sys Fuse Due to Malfunctioning +20 Vdc Power Supply | |
05000353/LER-1995-009, Forwards LER 95-009 Concerning Pressure Setpoint Drift of Mss SRV Due to Corrosion Induced Bonding within Valves | 9 September 1995 | Forwards LER 95-009 Concerning Pressure Setpoint Drift of Mss SRV Due to Corrosion Induced Bonding within Valves | |
05000353/LER-1996-008, Forwards LER 96-008-00 Which Documents Event That Occurred at Lgs,Unit 2 on 961214.Commitment Made within Ltr,Listed | 15 January 1997 | Forwards LER 96-008-00 Which Documents Event That Occurred at Lgs,Unit 2 on 961214.Commitment Made within Ltr,Listed | Fire Protection Program |
05000353/LER-1996-009, Forwards LER 96-009-00,documenting Event That Occurred at Limerick Generating Station,Unit 2 on 961224.LER Is Being Submitted Pursuant to Requirements of 10CFR50.73(a)(2)(iv) | 23 January 1997 | Forwards LER 96-009-00,documenting Event That Occurred at Limerick Generating Station,Unit 2 on 961224.LER Is Being Submitted Pursuant to Requirements of 10CFR50.73(a)(2)(iv) | |
05000353/LER-1997-004, Forwards LER 97-004-00 Re Failure to Obtain Offgas Sys Grab Sample within TS Time Limit on 930316.Delayed Submittal of LER Is Due to Incorrect Assessment of Reportability at Time of Event | 7 July 1997 | Forwards LER 97-004-00 Re Failure to Obtain Offgas Sys Grab Sample within TS Time Limit on 930316.Delayed Submittal of LER Is Due to Incorrect Assessment of Reportability at Time of Event | Grab sample |
05000353/LER-1997-005, Forwards LER 97-005-00 Re Plant Transient Which Resulted in Exceeding Licensed Thermal Power by 2.4% on 970605 | 7 July 1997 | Forwards LER 97-005-00 Re Plant Transient Which Resulted in Exceeding Licensed Thermal Power by 2.4% on 970605 | |
05000353/LER-1997-007, Forwards LER 97-007-00 Re Inoperability of HPCI Sys Single Train Safety Sys Due to Presence of Condensation in Steam Driven Turbine in Standby Condition | 23 July 1997 | Forwards LER 97-007-00 Re Inoperability of HPCI Sys Single Train Safety Sys Due to Presence of Condensation in Steam Driven Turbine in Standby Condition | |
05000353/LER-1997-008, Forwards LER 97-008-00,reporting Automatic Closure of Drywell Chilled Water Sys Primary Containment Isolation Valves Resulting from Relay Failure Associated W/Electrical Bus Overvoltage Condition on 970726 | 25 August 1997 | Forwards LER 97-008-00,reporting Automatic Closure of Drywell Chilled Water Sys Primary Containment Isolation Valves Resulting from Relay Failure Associated W/Electrical Bus Overvoltage Condition on 970726 | |
05000353/LER-1997-009, Forwards LER 97-009-00,reporting Unit 2 Primary Containment & Reactor Vessel Isolation Control Sys Actuation That Resulting in RWCU Sys Isolation on 970806 | 5 September 1997 | Forwards LER 97-009-00,reporting Unit 2 Primary Containment & Reactor Vessel Isolation Control Sys Actuation That Resulting in RWCU Sys Isolation on 970806 | |
05000353/LER-1997-010, Forwards LER 97-010-00,which Describes Condition Prohibited by TS in That Reflex Wire Specimen from Unit 2 Was Not Examined to Determine RPV Fluence IAW TS Surveillance Requirement 4.4.6.1.4 | 8 December 1997 | Forwards LER 97-010-00,which Describes Condition Prohibited by TS in That Reflex Wire Specimen from Unit 2 Was Not Examined to Determine RPV Fluence IAW TS Surveillance Requirement 4.4.6.1.4 | |
05000353/LER-1998-001, Forwards LER 98-001-00 Re Discovery of Three Barksdale Model C9622-3-B Differential Pressure Switches Located on Main Turbine Relayed Emergency Trip Sys | 2 July 1998 | Forwards LER 98-001-00 Re Discovery of Three Barksdale Model C9622-3-B Differential Pressure Switches Located on Main Turbine Relayed Emergency Trip Sys | |
05000353/LER-1998-002, Forwards LER 98-002-00,reporting Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Occurring When Electromagnetic Interference Due to Component Testing Inducing Signal in Redundant Reactivity Control Sys C | 6 July 1998 | Forwards LER 98-002-00,reporting Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Occurring When Electromagnetic Interference Due to Component Testing Inducing Signal in Redundant Reactivity Control Sys Cable | |
05000353/LER-1998-003, Forwards LER 98-003-00 Re 980622 Inoperability of Main Condenser Offgas pre-treatment Radioactivity Monitor Skid Which Resulted from Incorrect Procedure | 22 July 1998 | Forwards LER 98-003-00 Re 980622 Inoperability of Main Condenser Offgas pre-treatment Radioactivity Monitor Skid Which Resulted from Incorrect Procedure | |
05000353/LER-1998-004, Forwards LER 98-004-00,reporting Manual Actions Taken in Response to Plant Conditions,To Perform Secondary Containment Isolation,Sgts Initiation & RERS Initiation | 27 July 1998 | Forwards LER 98-004-00,reporting Manual Actions Taken in Response to Plant Conditions,To Perform Secondary Containment Isolation,Sgts Initiation & RERS Initiation | |
05000353/LER-1998-005, Forwards LER 98-005-00,reporting Condition Prohibited by TS in That Surveillance Test Exceeded TS Surveillance Requirement Time Period & Applicable TS Action Had Not Been Met | 23 July 1998 | Forwards LER 98-005-00,reporting Condition Prohibited by TS in That Surveillance Test Exceeded TS Surveillance Requirement Time Period & Applicable TS Action Had Not Been Met | |
05000353/LER-1998-006, Forwards LER 98-006-00 Re Failure to Perform 4KV Emergency D24 Bus Undervoltage Channel Calibr Surveillance Test Prior to TS Due Date.Cause of 980726 Event Is Attributed to Personnel Error | 21 August 1998 | Forwards LER 98-006-00 Re Failure to Perform 4KV Emergency D24 Bus Undervoltage Channel Calibr Surveillance Test Prior to TS Due Date.Cause of 980726 Event Is Attributed to Personnel Error | |
05000353/LER-1998-007, Forwards LER 98-007-00,reporting Condition Prohibited by TS, in That Remote Shutdown Panel Instrument Calibr Was Not within Required Frequency & Required Actions Were Not Taken. Event Occurred Due to Administrative Error | 3 September 1998 | Forwards LER 98-007-00,reporting Condition Prohibited by TS, in That Remote Shutdown Panel Instrument Calibr Was Not within Required Frequency & Required Actions Were Not Taken. Event Occurred Due to Administrative Error | |
05000353/LER-1998-008, Forwards LER 98-008-00,reporting Condition Prohibited by Tech Specs & Condition That Alone Could Have Prevented Fulfillment of Safety Function of Sys Designed to Mitigate Release of Radioactive Matl | 7 January 1999 | Forwards LER 98-008-00,reporting Condition Prohibited by Tech Specs & Condition That Alone Could Have Prevented Fulfillment of Safety Function of Sys Designed to Mitigate Release of Radioactive Matl | |
05000353/LER-1999-002, Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 990419 | 18 May 1999 | Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 990419 | |
05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure | 7 July 1999 | Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure | |
05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs | 23 July 1999 | Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs | |
05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint | 10 August 1999 | Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint | |
05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl | 16 September 1999 | Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl | |
05000354/LER-1986-074, Resubmits LER 86-074-00.LER Found Out of Original Envelope & Loose in Mail | 12 November 1986 | Resubmits LER 86-074-00.LER Found Out of Original Envelope & Loose in Mail | |
05000354/LER-1989-009, Forwards Corrected Page 1 of LER 89-009-00.Event & Rept Dates Incorrectly Coded | 17 May 1989 | Forwards Corrected Page 1 of LER 89-009-00.Event & Rept Dates Incorrectly Coded | |
05000354/LER-1994-002, Provides Clarification of Corrective Actions in LER 94-002-00 & Update on C/A Status,In Response to NOV Issued to Pse&G in NRC | 14 August 1995 | Provides Clarification of Corrective Actions in LER 94-002-00 & Update on C/A Status,In Response to NOV Issued to Pse&G in NRC | |
05000354/LER-1995-003, Informs of Extension of Expected Submission Date for LER 95-003-01 Entitled Failure to Perform Surveillance in Operational Condition Specified in TS from 951130 to 960105 | 30 November 1995 | Informs of Extension of Expected Submission Date for LER 95-003-01 Entitled Failure to Perform Surveillance in Operational Condition Specified in TS from 951130 to 960105 | |
05000354/LER-1995-016, Forwards LER 95-016 Re Bypass Event Rendered Shutdown Cooling Mode of RHR Inoperable | 9 August 1995 | Forwards LER 95-016 Re Bypass Event Rendered Shutdown Cooling Mode of RHR Inoperable | |
05000354/LER-1995-017, Forwards LER 95-017 Re Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry,Missed Surveillance Test & DGs Being Declared Inoperable | 11 August 1995 | Forwards LER 95-017 Re Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry,Missed Surveillance Test & DGs Being Declared Inoperable | Missed surveillance |
05000354/LER-1995-033, Forwards LER 95-033-12 Which Documents Discovery of TS Surveillance Implementation Deficiency Identified by TS Surveillance Improvement Program | 20 November 1996 | Forwards LER 95-033-12 Which Documents Discovery of TS Surveillance Implementation Deficiency Identified by TS Surveillance Improvement Program | |
05000354/LER-1995-037, Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-00 | 11 March 1996 | Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-00 | |
05000354/LER-1995-038, Forwards LER-95-038-02 Re Failure to Comply W/Required Action Statement Upon Removal of Failed Snubber on RHR Shutdown Cooling Line.Suppl Updates Corrective Actions | 14 March 1996 | Forwards LER-95-038-02 Re Failure to Comply W/Required Action Statement Upon Removal of Failed Snubber on RHR Shutdown Cooling Line.Suppl Updates Corrective Actions | |
05000354/LER-1996-014, Forwards LER 96-014-00 Re non-conservative Safety Limit Min Critical Power Ratio Calculation Methodology Error Discovery.Commitments Listed as Submitted | 14 May 1996 | Forwards LER 96-014-00 Re non-conservative Safety Limit Min Critical Power Ratio Calculation Methodology Error Discovery.Commitments Listed as Submitted | |
05000354/LER-1996-015, Forwards LER 96-015-00 Re Potential to Operate in Unanalyzed Condition Due to Design Deficiency in Overboard Discharge Line.Commitments Listed as Submitted | 10 May 1996 | Forwards LER 96-015-00 Re Potential to Operate in Unanalyzed Condition Due to Design Deficiency in Overboard Discharge Line.Commitments Listed as Submitted | Unanalyzed Condition |
05000354/LER-1996-022, Forwards LER 96-022-02,documenting Event That Occurred at Hope Creek Generating Station,Unit 1.Util Commitments Made within Ltr,Listed | 31 January 1997 | Forwards LER 96-022-02,documenting Event That Occurred at Hope Creek Generating Station,Unit 1.Util Commitments Made within Ltr,Listed | |
05000354/LER-1996-025, Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up | 6 December 1996 | Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up | |
05000354/LER-1996-028, Forwards LER 96-028-00,submitted Pursuant to Requirements of 10CFR50.73(a)(2)(v).Commitments Listed | 20 January 1997 | Forwards LER 96-028-00,submitted Pursuant to Requirements of 10CFR50.73(a)(2)(v).Commitments Listed | |
05000354/LER-1996-030, Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-00 | 29 January 1997 | Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-00 | |
05000354/LER-1997-002, Forwards List of Commitments Made for LER 97-002-00 Re Inconsistency Between Filtration,Recirculation & Ventilation Sys TSs & Ability to Withstand Single Failures | 14 February 1997 | Forwards List of Commitments Made for LER 97-002-00 Re Inconsistency Between Filtration,Recirculation & Ventilation Sys TSs & Ability to Withstand Single Failures | |
05000354/LER-1997-004, Forwards LER 97-004-00, B Div Primary Containment Isolation Due to Personnel Error During Troubleshooting, Per 10CFR50.73(a)(2)(iv).Util Commitments Listed | 10 March 1997 | Forwards LER 97-004-00, B Div Primary Containment Isolation Due to Personnel Error During Troubleshooting, Per 10CFR50.73(a)(2)(iv).Util Commitments Listed | |
05000354/LER-1997-005, Forwards LER 97-005-00 Entitled, Operation in TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Rhrs Crosstie Valves. Commitments Attached | 25 April 1997 | Forwards LER 97-005-00 Entitled, Operation in TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Rhrs Crosstie Valves. Commitments Attached | |
05000354/LER-1997-007, Provides List of Commitments Re LER 97-007 Concerning Struthers-Dunn 219NE Series Relay Failures Due to Thermal Degradation of Magnetic Vinyl Plastic Bearing Pad Matl Per 10CFR50.73(a)(2)(v) & 10CFR21.LER 97-007-00,encl | 7 May 1997 | Provides List of Commitments Re LER 97-007 Concerning Struthers-Dunn 219NE Series Relay Failures Due to Thermal Degradation of Magnetic Vinyl Plastic Bearing Pad Matl Per 10CFR50.73(a)(2)(v) & 10CFR21.LER 97-007-00,encl | |
05000354/LER-1997-008, Forwards LER 97-008-00 Entitled, ESF Actuation: C Svc Water Pump Auto-Start. Commitments,Encl | 19 June 1997 | Forwards LER 97-008-00 Entitled, ESF Actuation: C Svc Water Pump Auto-Start. Commitments,Encl | |
05000354/LER-1997-013, Forwards LER 97-013-01 Re Unplanned High Pressure Coolant Injection Sys Inoperability.Attachment a Listed Item Representing Commitment | 1 October 1997 | Forwards LER 97-013-01 Re Unplanned High Pressure Coolant Injection Sys Inoperability.Attachment a Listed Item Representing Commitment | |
05000354/LER-1997-015, Forwards LER 97-015-00 Re Failure of Radioactive Effluent Samples to Analyze within Required Surveillance Interval. Commitments Made by Util,Encl | 31 July 1997 | Forwards LER 97-015-00 Re Failure of Radioactive Effluent Samples to Analyze within Required Surveillance Interval. Commitments Made by Util,Encl | |
05000354/LER-1997-017, Forwards LER 97-017-00 Re Missed Emergency Lighting Surveillance,Per License Conditions 2.C(7) & 2.F | 28 August 1997 | Forwards LER 97-017-00 Re Missed Emergency Lighting Surveillance,Per License Conditions 2.C(7) & 2.F | Emergency Lighting |
05000354/LER-1997-018, Forwards LER 97-018-00,discussing Esfa Which Resulted from RPS MG Set Breaker Trip.List of Commitments,Encl | 27 August 1997 | Forwards LER 97-018-00,discussing Esfa Which Resulted from RPS MG Set Breaker Trip.List of Commitments,Encl | |