Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
E910-05-023, Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation Fences MA922 June 2005Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation Fences MA9
E910-05-024, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL13. Appendix a22 June 2005Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL13. Appendix aScaffolding
E910-05-025, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survery Units OL11-1 and OL11-2, Appendix a22 June 2005Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survery Units OL11-1 and OL11-2, Appendix aScaffolding
E910-05-028, Transmitting Saxton Nuclear Experimental Corporation (Snec) 2004 Annual Report28 June 2005Transmitting Saxton Nuclear Experimental Corporation (Snec) 2004 Annual Report
E910-05-029, Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL829 March 2005Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL8Scaffolding
E910-05-030, Calculation E900-05-003, Rev. 0, Penelec Switch Yard, Class 2 Area, Survey Design, Appendix C-1, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Penelec Switch Yard Area11 March 2005Calculation E900-05-003, Rev. 0, Penelec Switch Yard, Class 2 Area, Survey Design, Appendix C-1, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Penelec Switch Yard Area
E910-05-031, Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Survey of Remediated Soils14 July 2005Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Survey of Remediated Soils
E910-05-032, Final Status Survey Report for Saxton Nuclear Experimental Corporation Penelec Switch Yard Control Building31 July 2005Final Status Survey Report for Saxton Nuclear Experimental Corporation Penelec Switch Yard Control BuildingCoatings
E910-05-035, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL722 July 2005Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL7Scaffolding
E910-05-036, Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation, Saxton Steam Generating Station Structural Surfaces - Firing Aisle SS1322 July 2005Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation, Saxton Steam Generating Station Structural Surfaces - Firing Aisle SS13
E910-05-037, Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Basement SS14, SS15, SS16, SS17, Appendix E, E900-05-008 Calculation Sheet12 May 2005Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Basement SS14, SS15, SS16, SS17, Appendix E, E900-05-008 Calculation Sheet
E910-05-038, FSS Report for Ssgs Seal Chambers22 July 2005FSS Report for Ssgs Seal Chambers
E910-05-039, Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces Discharge Tunnel Transition Area SS23, SS2531 July 2005Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces Discharge Tunnel Transition Area SS23, SS25Scaffolding
E910-05-041, Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Open Land Area OL1 - Soils26 July 2005Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Open Land Area OL1 - Soils
E910-05-042, Transmittal of FSS Report for OL7 - Paved Surfaces and Concrete26 July 2005Transmittal of FSS Report for OL7 - Paved Surfaces and Concrete
E910-05-043, Submittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Intake Tunnel26 July 2005Submittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Intake Tunnel
E910-05-044, Transmittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Discharge Tunnel26 July 2005Transmittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Discharge Tunnel
E910-05-045, Experimental Corporation (Snec) FSS Report for - Ssgs Structural Surfaces - Cv Steam Tunnel25 July 2005Experimental Corporation (Snec) FSS Report for - Ssgs Structural Surfaces - Cv Steam Tunnel
E910-05-046, Rev 0 to E900-04-017, Upper Spray Pump Area and Discharge Tunnel Entrance Survey Design, Appendix B & Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfa31 August 2004Rev 0 to E900-04-017, Upper Spray Pump Area and Discharge Tunnel Entrance Survey Design, Appendix B & Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural SurfacesScaffolding
E910-05-047, Experimental Corp (Snec) FSS Report for Ssgs Seal Chamber Roofs27 July 2005Experimental Corp (Snec) FSS Report for Ssgs Seal Chamber Roofs
E910-05-048, Transmittal of Saxton Nuclear Experimental Corporation FSS Report for OL3 Paved Surfaces and Concrete27 July 2005Transmittal of Saxton Nuclear Experimental Corporation FSS Report for OL3 Paved Surfaces and Concrete
E910-05-049, Experimental Corporation, FSS Report for Open Land Area OL227 July 2005Experimental Corporation, FSS Report for Open Land Area OL2
E910-05-050, Transmittal of Saxton Nuclear Experimental Corp FSS Report for Residual Concrete in OL127 July 2005Transmittal of Saxton Nuclear Experimental Corp FSS Report for Residual Concrete in OL1
E910-05-051, Transmittal of Saxton Nuclear Experimental Corporation (Snec), FSS Report for Residual Macadam in OL127 July 2005Transmittal of Saxton Nuclear Experimental Corporation (Snec), FSS Report for Residual Macadam in OL1
E910-05-052, Rev. 0 to Calculation E900-04-027, Cv Yard Survey Design - Temporary Water Supply Trench in Cv Yard, Appendix A-1 to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survey Unit OL1-6.11 March 2005Rev. 0 to Calculation E900-04-027, Cv Yard Survey Design - Temporary Water Supply Trench in Cv Yard, Appendix A-1 to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survey Unit OL1-6.
E910-05-054, Rev. 0 to Calculation E900-03-014, Shonka Line Shack & Warehouse/Garage Pads FSS Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Structural Surfaces - Small Penelec Garage GA1-1.21 July 2003Rev. 0 to Calculation E900-03-014, Shonka Line Shack & Warehouse/Garage Pads FSS Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Structural Surfaces - Small Penelec Garage GA1-1.
E910-05-055, Rev. 0 to Calculation 6900-02-025, Multiple Source Term Bounding Calculation, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corporation Embedded / Buried Piping.7 October 2002Rev. 0 to Calculation 6900-02-025, Multiple Source Term Bounding Calculation, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corporation Embedded / Buried Piping.
E910-05-056, Rev. 0 to Calculation E900-05-024, Open Land FSS Design-OL3, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL3.27 May 2005Rev. 0 to Calculation E900-05-024, Open Land FSS Design-OL3, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL3.Scaffolding
E910-05-060, Experimental Corporation (Snec) Application for Termination of License15 September 2005Experimental Corporation (Snec) Application for Termination of License
E910-05-061, Records Required to Be Forwarded to NRC Region 1 Office Prior to Termination of the Saxton Nuclear Experimental Corporation Plant License15 September 2005Records Required to Be Forwarded to NRC Region 1 Office Prior to Termination of the Saxton Nuclear Experimental Corporation Plant LicenseDecommissioning Funding Plan
Annual Radioactive Effluent Release Report
Annual Radiological Effluent Release Report
E910-05-062, 2005 Annual Radioactive Effluent Releases Report for Saxton Nuclear Experimental Corporation (Snec)15 September 20052005 Annual Radioactive Effluent Releases Report for Saxton Nuclear Experimental Corporation (Snec)Offsite Dose Calculation Manual
Process Control Program
E910-05-064, Experimental Corporation 2005 Radiological Environmental Monitoring Report15 September 2005Experimental Corporation 2005 Radiological Environmental Monitoring ReportGrab sample
Offsite Dose Calculation Manual
Chernobyl
E910-05-066, Experimental Corporation Response to Comments on Snec Final Status Survey Reports8 September 2005Experimental Corporation Response to Comments on Snec Final Status Survey ReportsGrab sample
E910-05-068, Experimental Corporation, Response to Additional Comments on Snec Final Status Survey Reports29 September 2005Experimental Corporation, Response to Additional Comments on Snec Final Status Survey Reports
E910-06-002, Experimental Corporation Indemnity Agreement16 January 2006Experimental Corporation Indemnity Agreement
E910-06-003, Experimental Corporation, Cancellation of Quality Assurance Program for Radioactive Material Packages No. 090113 March 2006Experimental Corporation, Cancellation of Quality Assurance Program for Radioactive Material Packages No. 0901
IR 05000146/198600128 August 1986Special Licensee Meeting Rept 50-146/86-01 on 860725.Major Areas Discussed:Current Operations & Planned Liquid Waste Removal (Water Discharge) Activities.Related Info Encl
IR 05000146/198600220 January 1987Advises That Proposed Mailing List for Facility Correspondence Incorporated Into NRR Svc List.Saxton Community Library Already Receives insp-related Documents. Insp Rept 50-146/86-02 & Encls Sent to Svc List Addressees
IR 05000146/198700118 September 1987Insp Rept 50-146/87-01 on 870721-22.No Violations Noted. Major Areas Inspected:Preparations for Upcoming Decontamination Activities & Familiarization W/Site Layout, Personnel,Licensing Issues & Site Activities Assessment
IR 05000146/198800131 May 1988Notification of Licensee Meeting 88-075 on 880606 W/Util in King of Prussia,Pa to Discuss Mgt Deficiencies Identified in Insp Rept 50-146/88-01 & Licensee Plans for Characterization of Site Soil Contamination
IR 05000146/19890017 March 1989Mgt Meeting Rept 50-146/89-01 on 890227.Major Areas Inspected:General Design,Scope & Methodology to Be Used During Performance of Radiological Surveys in Areas Adjacent to Saxton Reactor Facility
IR 05000146/199000125 July 1990Insp Rept 50-146/90-01 on 900710-12.No Violations Noted. Major Areas Inspected:Actions Taken to Decontaminate Several Bldgs on Site & to Review Results of Final Release Survey Reported to NRC by
IR 05000146/19930014 October 1993Insp Rept 50-146/93-01 on 930914.No Safety Concerns or Violations Noted.Major Areas Inspected:Acquainted Region- Based Personnel W/Facilities,Reviewed Current Status of Reactor Equipment & Discussed Plans for Decommissioning
IR 05000146/199600121 January 1997Insp Rept 50-146/96-01 on 961119-21.No Violations Noted. Major Areas Inspected:Control & Monitoring of Asbestos, Control of Workplace Industrial Hazards & Conduct of Industrial Safety ProgramScaffolding
IR 05000146/199700118 March 1997Insp Rept 50-146/97-01 on 970127-29.No Violations Noted. Major Areas Inspected:Procedures Development,Adherence to Procedures & Quality Assurance Oversight of ProceduresGrab sample
Offsite Dose Calculation Manual
IR 05000146/199820211 June 1998Insp Rept 50-146/98-202 on 980511-13.No Violations Noted. Major Areas Inspected:Licensee Programs Re Protection of Public HealthOffsite Dose Calculation Manual
Exclusive Use
IR 05000146/199820313 October 1998Insp Rept 50-146/98-203 on 980914-17.No Violations Noted. Major Areas Inspected:Decommissioning Activities at FacilityFitness for Duty
Process Control Program
Fire Watch
Dissimilar Metal Weld
Scaffolding
IR 05000146/199820416 December 1998Insp Rept 50-146/98-204 on 981013-1106.No Violations Noted. Major Areas Inspected:Large Component Removal ProjectScaffolding
Exclusive Use
IR 05000146/199920122 March 1999Insp Rept 50-146/99-201 on 990216-18.No Violations Noted. Major Areas Inspected:Plant Status,Including Dismantlement Activities,Odcm & Calibr of Effluent Radiation Monitoring Sys & Flow Rate MonitorsOffsite Dose Calculation Manual
IR 05000146/19992024 October 1999Insp Rept 50-146/99-202 on 990830-0902.No Violations Noted. Major Areas Inspected:Onsite Review of Selected Aspects of Organizational Structure & Functions Program,Emergency Preparedness,Fire Protection Program & Facility InspectionsFire Protection Program
Fire Watch