E910-05-048, Transmittal of Saxton Nuclear Experimental Corporation FSS Report for OL3 Paved Surfaces and Concrete

From kanterella
Jump to navigation Jump to search
Transmittal of Saxton Nuclear Experimental Corporation FSS Report for OL3 Paved Surfaces and Concrete
ML052140095
Person / Time
Site: Saxton File:GPU Nuclear icon.png
Issue date: 07/27/2005
From: Kuehn G
GPU Nuclear Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
E910-05-048
Download: ML052140095 (1)


Text

GPU Nuclear, Inc.

CdU NUCLEAR Three Mile Island Nuclear Station Route 441 South Post Office Box 480 Middletown, PA 17057.0480 July 27, 2005 Tel 717-948-8461 E910-05-048 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen, Subject Saxton Nuclear Experimental Corporation (SNEC)

Operating License No., DPR-4 Docket No. 50-146 FSS Report for OL3 Paved Surfaces and Concrete The purpose of this letter is to submit for your review the attached FSS Report for OL3 Paved Surfaces and Concrete. One CD-ROM is included in this submission. The CD-ROM labeled: "FSS Report - OL3 Paved Surfaces and Concrete - Publicly Available' contains the following 6 files:

Document Title File Name File Size (Mbytes)

Main Report 001 Final Report - OL3 Paved 0.821 Surfaces and Concrete.pdf Appendix A (Rev 2) 002 - Appendix A (Rev 2).pdf 18.7 Appendix A (Rev 1) 003 - Appendix A (Rev 1).pdf 16.0 Appendix A (Rev 0) 004 - Appendix A (Rev 0).pdf 13.9 Appendix A (Rev 0 - attachments) 005 - Appendix A (Rev 0 - 21.8 attachments). pdf Appendix B 006 - Appendix B.pdf 84.6 If you have any questions on this information, please contact Mr. Art Paynter at (717) 948-8425.

Sincerel Program Director, SNEC cc: NRC Project Manager NRC Project Scientist, Region 1 Mr. Tim Bauer, ORISE Project Leader

  • AC06:1O