Category:Annual Operating Report
[Table view] Category:Letter type:E
MONTHYEARE910-06-003, Experimental Corporation, Cancellation of Quality Assurance Program for Radioactive Material Packages No. 09012006-03-13013 March 2006 Experimental Corporation, Cancellation of Quality Assurance Program for Radioactive Material Packages No. 0901 E910-06-002, Experimental Corporation Indemnity Agreement2006-01-16016 January 2006 Experimental Corporation Indemnity Agreement E910-05-068, Experimental Corporation, Response to Additional Comments on Snec Final Status Survey Reports2005-09-29029 September 2005 Experimental Corporation, Response to Additional Comments on Snec Final Status Survey Reports E910-03-035, Experimental Corporation (Snec) FSS Report for Cv Interior, 774' Elev and Below, Revision 1, Erratum2005-09-17017 September 2005 Experimental Corporation (Snec) FSS Report for Cv Interior, 774' Elev and Below, Revision 1, Erratum E910-05-061, Records Required to Be Forwarded to NRC Region 1 Office Prior to Termination of the Saxton Nuclear Experimental Corporation Plant License2005-09-15015 September 2005 Records Required to Be Forwarded to NRC Region 1 Office Prior to Termination of the Saxton Nuclear Experimental Corporation Plant License E910-05-060, Experimental Corporation (Snec) Application for Termination of License2005-09-15015 September 2005 Experimental Corporation (Snec) Application for Termination of License E910-05-064, Experimental Corporation 2005 Radiological Environmental Monitoring Report2005-09-15015 September 2005 Experimental Corporation 2005 Radiological Environmental Monitoring Report E910-05-062, 2005 Annual Radioactive Effluent Releases Report for Saxton Nuclear Experimental Corporation (Snec)2005-09-15015 September 2005 2005 Annual Radioactive Effluent Releases Report for Saxton Nuclear Experimental Corporation (Snec) E910-05-066, Experimental Corporation Response to Comments on Snec Final Status Survey Reports2005-09-0808 September 2005 Experimental Corporation Response to Comments on Snec Final Status Survey Reports E910-05-049, Experimental Corporation, FSS Report for Open Land Area OL22005-07-27027 July 2005 Experimental Corporation, FSS Report for Open Land Area OL2 E910-05-048, Transmittal of Saxton Nuclear Experimental Corporation FSS Report for OL3 Paved Surfaces and Concrete2005-07-27027 July 2005 Transmittal of Saxton Nuclear Experimental Corporation FSS Report for OL3 Paved Surfaces and Concrete E910-05-047, Experimental Corp (Snec) FSS Report for Ssgs Seal Chamber Roofs2005-07-27027 July 2005 Experimental Corp (Snec) FSS Report for Ssgs Seal Chamber Roofs E910-05-051, Transmittal of Saxton Nuclear Experimental Corporation (Snec), FSS Report for Residual Macadam in OL12005-07-27027 July 2005 Transmittal of Saxton Nuclear Experimental Corporation (Snec), FSS Report for Residual Macadam in OL1 E910-05-050, Transmittal of Saxton Nuclear Experimental Corp FSS Report for Residual Concrete in OL12005-07-27027 July 2005 Transmittal of Saxton Nuclear Experimental Corp FSS Report for Residual Concrete in OL1 E910-05-043, Submittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Intake Tunnel2005-07-26026 July 2005 Submittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Intake Tunnel E910-05-041, Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Open Land Area OL1 - Soils2005-07-26026 July 2005 Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Open Land Area OL1 - Soils E910-05-044, Transmittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Discharge Tunnel2005-07-26026 July 2005 Transmittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Discharge Tunnel E910-05-042, Transmittal of FSS Report for OL7 - Paved Surfaces and Concrete2005-07-26026 July 2005 Transmittal of FSS Report for OL7 - Paved Surfaces and Concrete E910-05-013, Submittal of Saxton Nuclear Experimental Corporation, FSS Report for Cv Yard Excavation - Soil and Structural Remnants2005-07-26026 July 2005 Submittal of Saxton Nuclear Experimental Corporation, FSS Report for Cv Yard Excavation - Soil and Structural Remnants E910-05-045, Experimental Corporation (Snec) FSS Report for - Ssgs Structural Surfaces - Cv Steam Tunnel2005-07-25025 July 2005 Experimental Corporation (Snec) FSS Report for - Ssgs Structural Surfaces - Cv Steam Tunnel E910-05-038, FSS Report for Ssgs Seal Chambers2005-07-22022 July 2005 FSS Report for Ssgs Seal Chambers E910-05-036, Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation, Saxton Steam Generating Station Structural Surfaces - Firing Aisle SS132005-07-22022 July 2005 Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation, Saxton Steam Generating Station Structural Surfaces - Firing Aisle SS13 E910-05-035, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL72005-07-22022 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL7 E910-05-003, Experimental Corporation Final Status Survey Report for OL6 and OL102005-07-14014 July 2005 Experimental Corporation Final Status Survey Report for OL6 and OL10 E910-05-031, Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Survey of Remediated Soils2005-07-14014 July 2005 Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Survey of Remediated Soils E910-05-028, Transmitting Saxton Nuclear Experimental Corporation (Snec) 2004 Annual Report2005-06-28028 June 2005 Transmitting Saxton Nuclear Experimental Corporation (Snec) 2004 Annual Report E910-05-023, Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation Fences MA92005-06-22022 June 2005 Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation Fences MA9 E910-05-021, Experimental Corporation, Revision 5 of the Snec Facility Quality Assurance Plan2005-06-15015 June 2005 Experimental Corporation, Revision 5 of the Snec Facility Quality Assurance Plan E910-05-007, Experimental Corporation (Snec), Management Change2005-05-19019 May 2005 Experimental Corporation (Snec), Management Change E910-05-011, Experimental Corporation, 2004 Radiological Environmental Monitoring Report2005-04-28028 April 2005 Experimental Corporation, 2004 Radiological Environmental Monitoring Report E910-05-009, Experimental Corporation - Transmittal of 2004 Annual Radioactive Effluent Releases Report2005-04-25025 April 2005 Experimental Corporation - Transmittal of 2004 Annual Radioactive Effluent Releases Report E910-04-018, Experimental Corporation - FSS Report for Snec Penelec Line Shack2004-06-29029 June 2004 Experimental Corporation - FSS Report for Snec Penelec Line Shack E910-04-017, Revised Decommissioning Report for the Saxton Nuclear Experimental Corporation and Financial Test Information2004-05-12012 May 2004 Revised Decommissioning Report for the Saxton Nuclear Experimental Corporation and Financial Test Information E910-04-015, Experimental Corporation (Snec), 2003 Annual Radioactive Effluent Releases Report2004-05-0303 May 2004 Experimental Corporation (Snec), 2003 Annual Radioactive Effluent Releases Report E910-04-016, Experimental Corporation (Snec), 2003 Radiological Environmental Monitoring Report2004-04-28028 April 2004 Experimental Corporation (Snec), 2003 Radiological Environmental Monitoring Report E910-04-006, Letter Transmitting Saxton Nuclear Experimental Corporation Biennial 10 CFR 50.59 Report and Updated Safety Analysis Report2004-03-18018 March 2004 Letter Transmitting Saxton Nuclear Experimental Corporation Biennial 10 CFR 50.59 Report and Updated Safety Analysis Report E910-04-004, Experimental Corporation 2003 Annual Report for 01/01/2003 - 12/31/20032004-01-29029 January 2004 Experimental Corporation 2003 Annual Report for 01/01/2003 - 12/31/2003 E910-03-048, Containment Vessel (Cv) Radiation Survey2003-12-22022 December 2003 Containment Vessel (Cv) Radiation Survey E910-03-041, Experimental Corp, FSS Report for Snec Cv Interior Above 774 Elev and Exterior2003-10-29029 October 2003 Experimental Corp, FSS Report for Snec Cv Interior Above 774 Elev and Exterior E910-03-038, Technical Specification Change Request No. 62, Rev.22003-09-30030 September 2003 Technical Specification Change Request No. 62, Rev.2 E910-03-031, FSS Report for Cv Interior, 774' Elev and Below, Revision 12003-09-0404 September 2003 FSS Report for Cv Interior, 774' Elev and Below, Revision 1 E910-03-019, 2002 Annual Report2003-04-30030 April 2003 2002 Annual Report E901-03-018, Radiological Environmental Monitoring Report2003-04-30030 April 2003 Radiological Environmental Monitoring Report E910-03-017, Annual Radioactive Effluent Releases Report2003-04-30030 April 2003 Annual Radioactive Effluent Releases Report E910-03-010, Decommissioning Reports for Three Mile Island Unit 2, & Saxton Nuclear Experimental Corporation2003-03-21021 March 2003 Decommissioning Reports for Three Mile Island Unit 2, & Saxton Nuclear Experimental Corporation E910-03-002, of Saxton Nuclear Experimental Corporation Facility Quality Assurance Plan2003-01-20020 January 2003 of Saxton Nuclear Experimental Corporation Facility Quality Assurance Plan E910-02-054, Experimental Corporation (Snec) Application for License Termination2002-12-16016 December 2002 Experimental Corporation (Snec) Application for License Termination E910-02-060, Shonka Report Submittal2002-12-16016 December 2002 Shonka Report Submittal E910-02-058, TS Change Request No.62, Rev.12002-12-0505 December 2002 TS Change Request No.62, Rev.1 E910-02-049, Submittal of Information to NRC in 08/29/02 Meeting, Revision 1 Re Updated License Termination Plan2002-10-10010 October 2002 Submittal of Information to NRC in 08/29/02 Meeting, Revision 1 Re Updated License Termination Plan 2006-03-13
[Table view] |
Text
4 -V GPU Nuclear, Inc.
CSU. Three Mile Island Nuclear Generating Station Route 441 South Post Office Box 480 Middletown, PA 17057-0480 Tel 717-944-7621 June 28, 2005 E910-05-028 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Saxton Nuclear Experimental Corporation (SNEC)
Operating License No. DPR-4 Docket No. 50-146 2004 Annual Report Gentlemen, The purpose of this letter is to submit a written report covering the status of the Saxton Nuclear Experimental Corporation (SNEC) Facility in accordance with Section 3.8.2 of the Saxton Nuclear Experimental Corporation (SNEC) Technical Specifications.
The report is for the period beginning January 1,2004 through December 31, 2004.
Sincerely, G.ra Program Director, SNEC cc: NRC Project Manager NRR NRC Project Scientist, Region 1 A43CODADo)f
SAXTON NUCLEAR EXPERIMENTAL CORPORATION 2004 ANNUAL REPORT FOR THE SAXTON NUCLEAR EXPERIMENTAL CORPORATION FACILITY January 1, 2004 - December 31, 2004 2
EXECUTIVE
SUMMARY
During the report period of January 1, 2004 through December 31, 2004, numerous activities were conducted at the Saxton Nuclear Experimental Corporation (SNEC) Facility in preparation for Final Status Survey (FSS) and license termination. SNEC's Radiological Control Technicians (RCTs) continued to monitor radiological conditions at the site to assure protection of the health and safety of the general public and site personnel.
This report provides~an overview of the site activities and.administrative changes that-are listed in Section 3.8.2 of SNEC's Technical Specifications (Tech Specs). The information includes:
A. Changes in the management and supervisory positions designated in Section 3.1 (Organization and Responsibilities) as being responsible for decommissioning the facility.
B. A summary of the decommissioning, design and maintenance changes made to the deactivated facility.
C. Results of surveys and monitoring performed in accordance with Tech Spec Section 3.6.2.1 (Radioactive Effluent Controls Program) and Section 3.6.2.2 (Radiological Environmental Monitoring Program).
D. A review of the performance of access control and surveillance measures.
1
I i.
ANNUAL REPORT IN COMPLIANCE WITH PARAGRAPH 3.8.2 OF THE SNEC TECHNICAL SPECIFICATIONS January1, 2004 to December 31, 2004 The following information addresses the reporting requirements set forth in Section 3.8.2 of the Technical Specifications for the Saxton Nuclear Experimental Corporation (SNEC) facility. The information includes activities and changes that occurred during the 2004 calendar year. Each of the following sections corresponds to a reporting requirement cited by SNEC's Technical Specifications (Tech Specs).
Acronymnis The following list includes acronyms that are commonly used at the SNEC site and included in this report:
SNEC - Saxton Nuclear Experimental Corp. SNEF - Saxton Nuclear Experimental Facility FSS - Final Status Survey CV - Contairnment Vessel SSGS - Saxton Steam Generating Station CAP - Corrective Action Program A. Tech Spec Section 3.8.2.1 Information relating to changes in those management and supervisory positions designated in Tech Spec Section 3.1 as being responsible for decommissioning the facility.
- In 2004, Michael S. Williams retired and Lou Shamenek assumed the position of SNEC Facility Site Supervisor.
B. Tech Spec Section 3.8.2.2 Summary of the decommissioning, design, and maintenance changes made to the deactivated facility:
CVDome and Shell Removal
- Removed the CV Dome and CV Shell to elevation 804 ft.,
- Removed the CV polar crane, bridge, trolley and rails,
- Surveyed the CV steel and polar crane components. Segregated the material for disposal,
- Completed FSS of the below-grade, exterior portion of the CV Shell,
- Completed FSS of the CV excavation walls and concrete cover,
- Completed FSS of the SSGS steam tunnel and demolition of the tunnel roof,
- Completed backfill of the CV excavation and steam tunnel (backfill to grade).
2
CrV ast Yard
- Stripped the top layer of soil from the entire east yard area,
- Remediated contaminated soil in miscellaneous pipe trenches and the former Drum Storage Area,
- Excavated contaminated soil that was used to backfill the former location of the plant's underground tanks which were removed in the 1970's following shutdown.
- Removed the south SNEC fence (original plant fencing),
- Completed survey of large rocks (boulders) that were removed during soil processing.
SSGSDischarge Tunnel
- Completed FSS of the SSGS Discharge Tunnel,
- Sealed the SSGS Discharge Tunnel access points (backfilled manways and entrance,
- Backfilled the Spray Pond Pump Pit (filled to grade).
SSGS Footprintand Seal Chambers
- Completed FSS of the SSGS Footprint and SSGS Seal Chambers,
- Poured concrete in the SSGS Footprint floor trenches and backfilled the SSGS with soil to grade.
Site Open Land areas
- Continued characterization and sampling of open land areas,
- Remediated areas on the site property external to the original SNEC footprint that were impacted by previous SNEC operations Balance of Plant
- Removed the Tank Farm Building,
- Relocated trailer/structure power supplies to existing poles and removed the power shed that was installed to support decommissioning activities,
- Removed and relocated trailers to the concrete pad for the former Penelec Warehouse,
- Completed FSS of the Penelec Line Building, Other
- Mobilized and staged a crusher machine and began processing materials removed-duringsite - -
remediation activities,
- Staged equipment, conveyor systems performed automated surveys of the processed materials,
- Continued shipments of radioactive wastes.
C Tech Spec Section 3.8.2.3 Results of surveys and monitoring performed in accordance with Technical Specifications Section 3.6.2.1 (Radioactive Effluent Controls Program) and 3.6.2.2 (Radiological Environmental Monitoring Program):
The results of the Radiological Environmental Monitoring Program are contained in the 2004 Radiological Environmental Monitoring Report.
3