Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
ML20046B22728 July 199305200004Forwards Listed Proprietary Documents,In Response to Request for QA Documentation Re Sbwr Gist Testing,Per 930726 Telcon. Documents Withheld
ML20046B28128 July 199305200001Forwards Rev 1 to 23A6100, ABWR Ssar, Chapters 1-21.Listed Sections Contain Proprietary Info & Will Be Submitted Under Separate Cover
ML20046B31228 July 199305200001Forwards Proprietary Rev 1 to 23A6100, ABWR Ssar Chapters 19 & 20.W/600 Oversize Drawings
ML20058G3015 November 199005000605Forwards Chapter 11, Radwaste Mgt, Draft Revs,Per 890331 Submittal of Amend 6 to Advanced BWR Ssar.Encl Withheld. Info Should Clarify Portions of Ssar Sections 11.2 & 11.4 Re Liquid & Solid Waste Mgt Sys,Respectively
ML20058H0743 December 1993FitzPatrickPart 21 Rept Re Discovery That Current Limiting Isolation Resistors Not Located in Respective Scram Contactor Boxes as Required by Plant Design Documents.Recommends That Isolation Resistors Be Installed in Scram Contactor Separation Boxes
ML20062C65622 October 1990LimerickAffidavit Requesting Withholding of Summary Rept on Evaluation of Recirculation Nozzle to Safe End Weld Indication & Proposed Disposition to Permit Unit 1 Cycle 4 Operation, from Public Disclosure,Per 10CFR2.790
ML20062K4195 December 1980Three Mile IslandRequests Action to Return TMI-1 Since Unit Was Not Damaged During Accident
ML20072M94012 March 2020FermiDeclaration of Rita Mitchell
ML20073T0701 July 199405000605Reports Changes & Errors in ECCS Evaluation Models
ML20076A92726 June 199105000605Forwards Responses to Discussion Items Re Flood Protection, New & Spent Fuel Storage,Light Load Handling Sys,Ultimate Heat Sink,Turbine Bldg Cooling Water Sys,Reactor Svc Water & Turbine Svc Water Sys,Per 910603 & 05 Conference Calls
ML20090G5809 March 199205000605Summerizes Staff Position Re NRC Conference Call on Dser Comments to Advanced BWR Ssar ISI Requirements
ML20090J97011 March 199205000605Forwards Proprietary Responses to Issues Re Sections 9.3,9.5 & 11.2 of Advanced BWR Ssar.Responses Reflect Correctons & Additions to Earlier Proprietary Submittals.Responses Withheld
ML20090J97911 March 199205000605Forwards Responses to Resolution of Issues Related to Advanced BWR Draft SER Chapters 1,2,3,5,6,9,10,12,13,14 & 15 (SECY-91-355)
ML20090J99411 March 199205000605Forwards Draft Rev 0 to Advanced BWR Srvdl Wetwell Piping Stress Analysis Design Rept & Draft Rev 0 to Design Rept, Main Steam Line a & Safety Relief Valve Discharge Piping Stress Analysis, Per 911209-10 Ge/Nrc Meeting
ML20091B12620 May 199105000605Forwards Responses to Ge/Nrc 910507 Meeting Re Open Items on Advanced BWR Ssar Chapter 14.Response to Open Items 2.1.4, 2.1.6,2.1.7 & 2.1.9 Will Be Transmitted by End of June
ML20092C0253 February 199205000605Forwards Proprietary Responses to Addl Info Noted in 911004 Draft SER for Chapter 7.Responses Are Cross Ref W/Summary Item Number Corresponding to Review Meeting in San Jose on 910807 & 08.Responses Withheld
ML20092C1673 February 199205000605Forwards Nonproprietary Responses to Addl Items of Concern Noted in Draft SER for Chapter 7.Advises That GE Will Amend Advanced BWR Ssar W/Responses in Future Amend
ML20092C1833 February 199205000605Forwards Response to Leak Before Break Issue Addressed in 911209-10 Ge/Nrc Meeting.Advises That GE Intend to Amend Ssar W/Response in Future Amend
ML20101R65613 July 199205200001Forwards Proprietary Amend 21 Drawings to ABWR Ssar.Drawings Withheld
ML20101S81813 July 199205200001Forwards Nonproprietary Drawings to GE ABWR Ssar,Amend 21
ML20113G69514 April 199205200001Forwards Proprietary GE Responses to Resolution of Selected Issues Re Advanced BWR Design Draft Ser,Chapter 19 (SECY-91-309).Responses Withheld
ML20113G71015 April 199205200001Forwards Proprietary Responses to Resolution of SECY-91-309 Confirmatory Item 1,as Related to Advanced BWR Draft SER Chapter 19.Responses Withheld
ML20114A94818 August 199205200001Forwards Proprietary Pages to Ssar for Abwr.Encl Withheld (Ref 10CFR2.790)
ML20116L5129 October 1992Peach BottomPart 21 Rept Re safety-related RHR Pump Motor Fan Failure Due to Lack of Weld Penetration Between Fan Blades & Discs. New Duplicate GE Motors Mfg by GE Canada,Motors & Drive Dept.New Surplus Motors Have Double Fillet Welds
ML20117A37120 November 199205200001Forwards Mods to Amend 23 to ABWR Ssar.Mods Includes Partial Resolution of COL License Info,Codes & Stds Update,Piping Audit Responses,Expansion of Inservice testing,60-yr Vessel Surveillance Plan & Update of Dose Assessment
ML20117A39620 November 199205200001Forwards Proprietary Mods to Amend 23 to ABWR Ssar.Mods Withheld
ML20117A46220 November 199205200001Forwards Changes to Nonproprietary 11x17 Foldout Drawings from Chapter 8 of ABWR Ssar,Amend 23
ML20117P22227 January 199605200004Forwards Final Rept Thermal Properties of Concrete at High Temps,
ML20117P60427 January 199505200004Forwards Rept Thermal Properties of Concrete at High Temperature, as Requested by 950117 Telcon W/J Quinn. W/O Encl
ML20127B86918 December 199205200004Documents NRC Acceptance Review of Application for Final Design Approval & Design Certification of Sbar Submitted on 920827.Info Needed to Complete Application Identified on Encl
ML20246D69823 August 198905000605Forwards Response to NRC 890516 Request for Addl Info on Ssar for Advanced BWR Re Chapters 7 & 8.Panel Internal Environ Maintained to Ensure That Reliability Goals Achieved
ML20247A04325 August 198905000605Forwards Amend 8 to Advanced BWR Ssar Chapter 13, Conduct of Operations Subsection 13.6, Physical Security. Amend Withheld (Ref 10CFR73.21)
ML20247G2486 February 1989Browns FerryPart 21 Rept Re Hydro Test of Inboard Isolation Valve.Disc in Valve in RHR Sys Not Tested for Pressure Retention Capability During ASME Test.Item Not Reportable Per Part 21
ML20248A7294 August 198905000605Forwards Corrected Page 19.1-1 to Chapter 19, Response to Severe Accident Policy Statement of Ssar for Advanced BWR, Correcting Calculated Core Damage Frequency from 4.27E-6 Per Yr to 4.27E-7 Per Yr.Proprietary Page Withheld
NRC-2013-0004, Comment (12) of Robert M. Mitchell, of the Yankee Atomic Electric Company, on Retrievability, Cladding Integrity and Safe Handling of Spent Fuel at an Independent Spent Fuel Storage Installation and During Transportation18 March 2013Yankee RoweComment (12) of Robert M. Mitchell, of the Yankee Atomic Electric Company, on Retrievability, Cladding Integrity and Safe Handling of Spent Fuel at an Independent Spent Fuel Storage Installation and During Transportation
NRC-2013-0195, Comment (6) of Robert M. Mitchell, on Behalf of Yankee Atomic Electric Co., on Proposed Rulemaking and Guidance, Amendments to Material Control and Accounting Regulations10 March 2014Yankee RoweComment (6) of Robert M. Mitchell, on Behalf of Yankee Atomic Electric Co., on Proposed Rulemaking and Guidance, Amendments to Material Control and Accounting Regulations