ML20046B312
| ML20046B312 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 07/28/1993 |
| From: | Recasha Mitchell GENERAL ELECTRIC CO. |
| To: | Joshua Wilson NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19310D554 | List: |
| References | |
| MFN-123-93, NUDOCS 9308040057 | |
| Download: ML20046B312 (2) | |
Text
-f
, J).
GENuclearEnergy GeneralElewk Company 175 Curtner Avenue. San Jose. CA 95125 July 28,1993 MFN No.123-93 Docket No. STN 52-001 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Jerry N. Wilson, Acting Director Standardization Project Directorate
Subject:
Submittal of Amendment 31, Proprietary Information, to GE's AHWR SSAR
Reference:
Submittal of Amendment 31, Non-Proprietary Information to GE's ABWR SSAR, MFN 122-93, dated July 28,1993 Enclosed are thirty-four copies of the reformatted Standard Safety Analysis Report (SSAR) for the Advanced Boiling Water Reactor (ABWR). Each of these copies consist of one volume housing the 8-1/2 x 11 inch pages and one volume containing larger size drawings.
Please note that all or parts of the following sections contain information that is designated as.
General Electric Company proprietary information: 1.2,1.3,3B.3,3B.4,4.3,~4A,4B,4C,6.3,7.2, 7.3,7.4,7.6,7.7,11.2,11.3,11.4,12.3, and 20A. These pages, as well, are primarily corrections or additons to earlier proprietary submittals and the proprietary affidavits under which they were originally issued are applicable to these pages.
t Sincerely, Gt.c.h R. C. Mitchell, Acting Manager Safety & Licensing M/C 481, (408) 925-2755 cc: R. C. Berglund (GE)
T. E. Murley (NRC)
D. M. Crutchfield (NRC)
N. D. Fletcher (DOE)
. D. J. McGoff (DOE)
/
F. J. Miraglia, Jr.
(NRC)
C. Poslusny, Jr.
(NRC) p J. F. Quirk (GE) fj l
[g#
F. A. Ross :
(DOE)
/4 I
g K. E. Stahlkopf (EPRI)
V 1 oy
'.PDR'9308d40057 930726 I
ADOCK 05200001 s
.A PDR-
,