December 18,1992 MFN No. 205-92 Dockei STN.52-004 SLK 92102 I
4 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C,20555 Attention:
Dennis M. Crutchfield Associate Director for Advances Reactors and License Renewal
Subject:
Results of Acceptance Review for GE Nuclear Energy's Application for Final Design Approval and Design Certification of the SBWR, Letter from D.M.Crutchfield to P.W. Marriott, dated December 10, 1992
Reference:
SBWR Licensing Plan, Letter from P.W. Marriott to D.M.
Crutchfield, dated February 24,1992, MFN 044 92
Dear Mr. Crutchfield:
The subject letter documents the NRC Acceptance Review of the Application for Final Design Approval and Design Certification of the SBWR submitted on August 27, 1992. The letter identifies items that are nee @d to complete the application. GE will submit all additional information requested by the letter on February 28,1993. This is in accordance with the plan identified in the Reference letter. The content of these additional items will be consistent with the content of the ABWR Application for Design Certification.
The following items listed in the subject letter as " missing information" were submitted in the application on August 27,1992:
o Water level (flood) design (Section 3.4) o Reactor Coolant Pressure Boundary inservice Inspection and Testing (Section 5.2.4)
Instrumentation and controls design for the remote shutdown system (Section 7,4.2) o Fire protection system (Section 9.5.1, exclusive of Appendix 9A Fire llazards Analysis) o-3f.>000Si 93o113o173.921218 I
p--
PDR ADOCK 0520 4
A
e <
Document Control Desk MFN 205-92 U.S. Nuclear llegulatory Commission Docket 52-004 December 18,1992 Page 2 As planned, GE will complete its application for certification by February 28,1993. Given the subject letter indicates that initial NRC Staf f review has begun based on the August 1992 submittal and that all necessary additional information will be provided in the February 28,1993 submittal, GE considers that June 1994 is achievable for completion of Staff review and issuance of the FDA.
It is requested that a meeting between the Staff and GE be held in early 1993 to formulate the schedule and establish the necessary working relationships to assure a timely, efficient review process.
Sincerely, (P ( " Fun.ka (; (
It.C. Mitchell, Acting Manager Safety & l_ieensing M/C 444, (408) 925-6948 29