Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TMI-12-013, Annual Report29 February 2012Annual ReportVT-2
TMI-12-016, T1R19 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and Attachments20 February 2012T1R19 Refueling Outage Inservice Inspection (ISI) Owner'S Activity Report and AttachmentsBoric Acid
TMI-12-025, Fitness for Duty Performance Data Reports - Annual 201128 February 2012Fitness for Duty Performance Data Reports - Annual 2011Fitness for Duty
TMI-12-027, License Amendment Request to Revise Steam Generator Program Inspection Frequencies and Tube Sample Selection26 March 2012License Amendment Request to Revise Steam Generator Program Inspection Frequencies and Tube Sample SelectionShutdown Margin
Non-Destructive Examination
Hydrostatic
Nondestructive Examination
Incorporated by reference
TMI-12-033, Special Report - Accident Monitoring Instrumentation Inoperability20 March 2012Special Report - Accident Monitoring Instrumentation Inoperability
TMI-12-042, CFR 50.46 30-Day Report21 March 2012CFR 50.46 30-Day Report
TMI-12-044, Special Report - Radioactive Gaseous Process and Effluent Monitoring Instrumentation30 March 2012Special Report - Radioactive Gaseous Process and Effluent Monitoring InstrumentationGrab sample
TMI-12-045, Emergency Response Data System Data Point Library Changes18 April 2012Emergency Response Data System Data Point Library Changes
TMI-12-047, (TMI-1), Biennial 10 CFR 50.59 and Commitment Revision Reports for 2010 and 201116 April 2012(TMI-1), Biennial 10 CFR 50.59 and Commitment Revision Reports for 2010 and 2011Fire Protection Program
TMI-12-048, Supplemental Information to the License Amendment Request to Revise Steam Generator Program Inspection Frequencies and Tube Sample Selection2 April 2012Supplemental Information to the License Amendment Request to Revise Steam Generator Program Inspection Frequencies and Tube Sample Selection
TMI-12-064, Supplemental Response to Request for Additional Information Related to the Proposed Administrative Changes to the Technical Specifications11 April 2012Supplemental Response to Request for Additional Information Related to the Proposed Administrative Changes to the Technical Specifications
TMI-12-065, Operating License No. DPR-50 and Possession Only License No. DPR 73, Combined 2011 Annual Radioactive Effluent Release Report25 April 2012Operating License No. DPR-50 and Possession Only License No. DPR 73, Combined 2011 Annual Radioactive Effluent Release ReportShutdown Margin
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
TMI-12-068, Submittal of Changes to Technical Specifications Bases12 April 2012Submittal of Changes to Technical Specifications BasesSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Incorporated by reference
Missed surveillance
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Operability Determination
Earthquake
Power-Operated Valves
Power Operated Valves
Fuel cladding
Fire Protection Program
Power change
Unidentified leakage
TMI-12-069, Submittal of Inspection Plan for Reactor Internals16 April 2012Submittal of Inspection Plan for Reactor InternalsNondestructive Examination
Functionality Assessment
Aging Management
EVT-1
Flow Induced Vibration
TMI-12-070, Relief Request PR-05 Associated with the Fourth Inservice Testing (IST) Interval18 April 2012Relief Request PR-05 Associated with the Fourth Inservice Testing (IST) Interval
TMI-12-071, Transmittal of Steam Generator Tube Inspection Report15 May 2012Transmittal of Steam Generator Tube Inspection ReportNondestructive Examination
TMI-12-072, (TMI-2) - Biennial 10 CFR 50.59 and Pdms SAR Report30 April 2012(TMI-2) - Biennial 10 CFR 50.59 and Pdms SAR Report
TMI-12-079, 10 CFR 50.46 Annual Report11 May 201210 CFR 50.46 Annual Report
TMI-12-108, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1413 July 2012Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14
TMI-12-112, Notification of Intent to Submit a Post-Shutdown Decommissioning Activities Report14 August 2012Notification of Intent to Submit a Post-Shutdown Decommissioning Activities Report
TMI-12-125, Response to Request for Additional Information Related to the Decommissioning Funding Status Report17 August 2012Response to Request for Additional Information Related to the Decommissioning Funding Status Report
TMI-12-137, Request to Use a Provision of a Later Addenda of the ASME Code for Operation and Maintenance of Nuclear Power Plants10 September 2012Request to Use a Provision of a Later Addenda of the ASME Code for Operation and Maintenance of Nuclear Power PlantsBoric Acid
Incorporated by reference
TMI-12-142, Response to NRC Request for Additional Information (RAI) Concerning TMI-1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan15 November 2012Response to NRC Request for Additional Information (RAI) Concerning TMI-1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan
TMI-12-148, Plant-Specific Path and Schedule for Resolution of Generic Letter 2004-0216 May 2013Plant-Specific Path and Schedule for Resolution of Generic Letter 2004-02Coatings
Foreign Material Exclusion
TMI-12-152, Submittal of End of Interval Relief Request RR-12-015 October 2012Submittal of End of Interval Relief Request RR-12-01
TMI-12-157, Submittal of Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-End18 October 2012Submittal of Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-EndWeld Overlay
Liquid penetrant
Dissimilar Metal Weld
TMI-12-158, Three Mile, Unit 1, Submittal of Relief Request VR-01 Associated with the Fifth Inservice Testing (IST) Interval18 October 2012Three Mile, Unit 1, Submittal of Relief Request VR-01 Associated with the Fifth Inservice Testing (IST) IntervalStroke time
TMI-12-168, Submittal of Relief Requests Associated with the Fifth Inservice Testing (IST) Interval7 November 2012Submittal of Relief Requests Associated with the Fifth Inservice Testing (IST) IntervalGrace period
TMI-12-169, Request for Amendment to Eliminate Certain Technical Specification Reporting Requirements4 February 2013Request for Amendment to Eliminate Certain Technical Specification Reporting RequirementsHigh Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
TMI-12-181, Response to Request for Additional Information - 10 CFR 50.46 30-Day Report12 December 2012Response to Request for Additional Information - 10 CFR 50.46 30-Day Report
TMI-12-182, Response to Request for Additional Information Regarding 2011 Steam Generator Tube Inspection Report19 December 2012Response to Request for Additional Information Regarding 2011 Steam Generator Tube Inspection ReportNon-Destructive Examination
TMI-12-183, Revision to the Pressure and Temperature Limit Curves and the Low Temperature Overpressure Protection Limits, and 10 CFR 50.12 Exemption Request - Initial Rt NDT Values for Linde 80 Welds14 December 2012Revision to the Pressure and Temperature Limit Curves and the Low Temperature Overpressure Protection Limits, and 10 CFR 50.12 Exemption Request - Initial Rt NDT Values for Linde 80 WeldsAnticipated operational occurrence
Hydrostatic
Surveillance Frequency Control Program
Exemption Request
TMI-13-007, Decommissioning Funding Status Report29 March 2013Decommissioning Funding Status Report
TMI-13-009, Response to Request for Additional Information - Relief Request RR-12-02 Re Installation of Full Structural Weld Overlay on Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds & Alloy 600 Safe-End17 January 2013Response to Request for Additional Information - Relief Request RR-12-02 Re Installation of Full Structural Weld Overlay on Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds & Alloy 600 Safe-EndWeld Overlay
Dissimilar Metal Weld
TMI-13-018, 2013 Emergency Preparedness Biennial Exercise Scenario12 February 20132013 Emergency Preparedness Biennial Exercise Scenario
TMI-13-020, Supplemental Information - Revision to the Pressure and Temperature Limit Curves and the Low Temperature Overpressure Protection Limits, and 10 CFR 50.12 Exemption Request - Initial Rt NDT Values for Linde 80 Welds31 January 2013Supplemental Information - Revision to the Pressure and Temperature Limit Curves and the Low Temperature Overpressure Protection Limits, and 10 CFR 50.12 Exemption Request - Initial Rt NDT Values for Linde 80 WeldsExemption Request
TMI-13-022, Response to Request for Additional Information - Request to Use a Provision of a Later Addenda of the ASME Code for Operation and Maintenance of Nuclear Power Plants12 February 2013Response to Request for Additional Information - Request to Use a Provision of a Later Addenda of the ASME Code for Operation and Maintenance of Nuclear Power PlantsBoric Acid
Incorporated by reference
TMI-13-033, Technical Specification Change Request 352, Revise Technical Specification 3.14.2 and the Licensing Basis Flood Hazard Contained in the Updated Final Safety Analysis Report10 April 2013Technical Specification Change Request 352, Revise Technical Specification 3.14.2 and the Licensing Basis Flood Hazard Contained in the Updated Final Safety Analysis ReportSafe Shutdown
Fukushima Dai-Ichi
Earthquake
TMI-13-034, 2012 Annual Report26 February 20132012 Annual ReportPacking leak
TMI-13-038, Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-End11 March 2013Relief Request RR-12-02 Concerning the Installation of a Full Structural Weld Overlay on the Lower Cold Leg Letdown Nozzle Dissimilar Metal Welds and Alloy 600 Safe-EndWeld Overlay
Hydrostatic
Finite Element Analysis
Dissimilar Metal Weld
DM weld
TMI-13-040, Revision 14 of the Post-Defueling Monitored Storage (Pdms) Quality Assurance Plan for TMI-222 March 2013Revision 14 of the Post-Defueling Monitored Storage (Pdms) Quality Assurance Plan for TMI-2
TMI-13-041, Post-Shutdown Decommissioning Activities Report Submittal28 June 2013Post-Shutdown Decommissioning Activities Report SubmittalReactor Vessel Water Level
Environmental Justice
TMI-13-043, Response to Request for Additional Information - Relief Request VR-01 Associated with the Fifth Inservice Testing (IST) Interval15 March 2013Response to Request for Additional Information - Relief Request VR-01 Associated with the Fifth Inservice Testing (IST) IntervalStroke time
TMI-13-048, Response to Request for Additional Information - Submittal of End of Interval Relief Request RR-12-0118 March 2013Response to Request for Additional Information - Submittal of End of Interval Relief Request RR-12-01
TMI-13-050, Re-issue of Update 9 of the Post-Defueling Monitored Storage Safety Analysis Report22 March 2013Re-issue of Update 9 of the Post-Defueling Monitored Storage Safety Analysis ReportSafe Shutdown
Boric Acid
High winds
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Hydrostatic
Coatings
Operating Basis Earthquake
Emergency Lighting
Locked High Radiation Area
Decommissioning Funding Plan
Tornado Generated Missile
Earthquake
Fire Protection Program
Power change
TMI-13-055, Response to Request for Additional Information - 10 CFR 50.46 30-Day Report2 April 2013Response to Request for Additional Information - 10 CFR 50.46 30-Day Report
TMI-13-057, Three Mile, Units 1 and 2, Combined 2012 Annual Radioactive Effluent Release Report22 April 2013Three Mile, Units 1 and 2, Combined 2012 Annual Radioactive Effluent Release ReportShutdown Margin
Grab sample
Offsite Dose Calculation Manual
Incorporated by reference
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Fire Protection Program
Power change
TMI-13-064, Submittal of Changes to Technical Specifications Bases10 April 2013Submittal of Changes to Technical Specifications BasesSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Incorporated by reference
Missed surveillance
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Operability Determination
Earthquake
Power-Operated Valves
Power Operated Valves
Fuel cladding
Fire Protection Program
Power change
Unidentified leakage
TMI-13-068, Response to Request for Additional Information - Relief Request PR-01 Associated with the Fifth Inservice Testing (1st) Interval17 April 2013Response to Request for Additional Information - Relief Request PR-01 Associated with the Fifth Inservice Testing (1st) Interval
TMI-13-069, Submittal of Inspection Plan for Reactor Internals17 April 2013Submittal of Inspection Plan for Reactor InternalsAging Management